Date |
Text |
2006-11-20 11:00:48 | |
| *** ISSUED PERMIT*** |
| -PLAN REVIEW HISTORY- |
| |
| PERMIT# 06011130 |
| ADDRESS: 502 20TH ST |
| CONT: JHAMTEC CONSTRUCTION |
| TELL # (561) 602-0009 |
| |
| THE ATTACHED COMMENTS ARE PART OF THE |
| PERMIT AND PLAN REVIEW PACKAGE AND ARE |
| NOT TO BE REMOVED FROM THE ISSUED SET OF PLANS. |
| 106.2.1.2* ADMINISTRATIVE CODE. |
| |
| BUILDING PROVISO: |
| |
| 1) 109.3.10* IMPACT OF CONSTRUCTION. |
| ALL CONSTRUCTION ACTIVITY REGULATED BY |
| THIS CODE SHALL BE PERMORMED IN A MANNER |
| SO AS NOT TO ADVERSELY IMPACT THE |
| CONDITION OF ADJACENT PROPERTY, UNLESS |
| SUCH ACTIVITY IS PERMITTED TO AFFECT |
| SAID PROPERTY PURSUANT TO A CONSENT BY |
| THE APPLICABLE PROPERTY OWNER, UNDER |
| TERMS & CONDITIONS AGREEABLE TO THE |
| APPLICABLE PROPERTY OWNER.THIS INCLUDES |
| BUT IS NOT LIMITED TO THE CONTROL OF |
| DUST, NOISE, WATER OR DRAINAGE RUN-OFF, |
| DEBRIS, AND THE STORAGE OF CONSTRUCTION |
| MATERIALS. NEW CONSTRUCTION ACTIVITY |
| SHALL NOT ADVERSELY IMPACT HISTORIC |
| SURFACE WATER DRAINAGE FLOWS SERVING |
| ADJACENT PROPERTIES, & MAY REQUIRE |
| SPECIAL DRAINAGE DESIGN COMPLYING WITH |
| ENGINEERING STANDARDS TO PRESERVE THE |
| POSITIVE PATTERNS OF THE AFFECTED SITES. |
| ACCORDINGLY, DEVELOPERS, CONTRACTORS, |
| AND OWNERS OF ALL NEW RESIDENTIAL |
| DEVELOPMENT, INCLUDING ADDITIONS, POOLS, |
| PATIOS, DRIVEWAYS, DECKS, OR SIMILAR |
| ITEMS, ON EXISTING PROPERTIES RESULTING |
| IN A DECREASE IN EXCESS OF 800SQ FT OF |
| PERMEABLE LAND AREA ON ANY PARCELL SHALL |
| AS A PERMIT CONDITION, PROVIDE A |
| PROFESSIONALLY PREPARED DRAINAGE PLAN |
| CLEARLY INDICATING COMPLIANCE WITH THIS |
| PARAGRAPH. UPON COMPLETION OF THE |
| IMPROVEMENT, A CERTIFICATE FROM A |
| LICENSED ENGINEER SHALL BE SUBMITTED TO |
| THE INSPECTOR IN ORDER TO RECEIVE |
| APPROVAL OF THE FINAL INSPECTION. |
| |
| 2 ) 109.3.10.1 HURICANE PROTECTION. |
| IT SHALL BE UNLAWFUL FOR ANY PERSON TO |
| ALLOW CONSTRUCTION RELATED MATERIALS |
| EQUIPMENT AND DEBRIS TO REMAIN LOOSE OR |
| OTHERWISE UNSECURED AT A CONSTRUCTION |
| SITE FROM 24 HRS. AFTER A HURRICANE |
| WATCH HAS BEEN ISSUED UNTIL THE |
| HURRICANE WATCH OR WARNING HAS BEEN |
| LIFTED. ALL SUCH CONSTRUCTION MATERIALS, |
| EQUIPMENT AND DEBRIS SHALL BE EITHER |
| REMOVED FROM THE CONSTRUCTION SITE OR |
| SECURED IN SUCH A MANNER AS TO MINIMIZE |
| THE DANGER OF SUCH CONSTRUCTION |
| MATERIALS, EQUIPMENT AND DEBRIS CAUSING |
| DAMAGE TO PERSONS OR PROPERTY FROM HIGH |
| WINDS. |
| ANY PERSONS WHO FAILS TO COMPLY TO |
| REMOVE OR SECURE THE CONSTRUCTION |
| MATERIALS EQUIPMENT AND DEBRIS WITHIN |
| 24 HRS AFTER A HURRICANE WATCH HAS BEEN |
| ISSUED SHALL BE SUBJECT TO A FINE NOT TO |
| EXCEED $500.00. |
| IN ADDITION TO THE ABOVE, A LICENSED |
| CONTRACTOR WHO VIOLATES THIS SECTION |
| SHALL BE SUBJECT TO DISCIPLINE PURSUANT |
| TO SECTION 113 OF THIS CHAPTER. |
| |
| BUILDING PLAN REVIEW |
| JIM WITMER |
| TEL: (561)805-6715 |
| FAX: (561)659-8026 |
| |