Plan Review Notes
Plan Review Notes For Permit 06011121
Permit Number 06011121
Review Stop ENG
Sequence Number 3
Notes
Date Text
2007-07-20 09:21:04 
  
 WE ASKED EXPLANATION FOR COMMENTS FOR REV 2, DATED
 2/2/07. THE PERSON WHO RESPONDED COMMENTS FOR REV 2,
 DID NOT MENTIONED HIS/HER NAME ON THE COMMENTS SHEET.
 HE/SHE SAID "NO CHANGES" FROM PREVIOUS REVISION " THIS
 IS A SHELL ONLY"
 IF THIS PERMIT FOR A SHELL ONLY THENYOU STILL NEED TO
 SHOW ON DRAWINGS THE POLLUTION PREVENTION
 DETAILS,CLOTHES USED FOR SILT ETC., PLANS SHOWING SILT
 FENCE AROUND THE SITE & CATCH BASINS.HEIGHT OF FENCE
 SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST &
 PARTICLES.
  
  
 BUT WE NEED THE FOLLOWING INFORMATIONFOR THIS PROJECT
 SITE IN ONE OF THE PERMITS YOU APPLIED(WHAT PERMIT # I
 CAN FIND THE FOLLOWING INFO):
  
 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI).
 PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR
 NOI.
 YOU CAN GET NOI INFO FROM
 WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/
 NOTICE OF INTENT DEP FORM 62-621.300(4)(B),
 EFFECTIVE MAY 1, 2003
 2. PLEASE SHOW ON DRAWINGSTHE LOCATION OF DUMPSTER &
 ITS ENCLOSURE & ITS DETAILSPER CITY OF WPB, LOCATION
 MUST BE ACCESSIBLE FOR PICKUP TRUCK.
 3. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD ,
 SIDEWALK ELEVATION MUST MEET FLOOD ZONE AREA, & 5,10,
 25, 100 YEAR FLOOD CRITERIATO DETERMINE THE FIRST
 FLOOR ELEVATION, MUST MEET THESE MINIMUM REQUIREMENTS.
 PLEASE SHOW IN YOUR STORM WATER CALS.
 4. MAKE SURE THESE SITE AREAS SHOWN ON DRAWINGS MUST
 MATCH WITH AREAS USED IN STORM WATER QUALITY
 CALCULATIONS.
 5. PLEASE SHOW ON YOUR DRAWINGS ALL STORM WATER PIPES
 AROUND YOUR SITE SO, WE CANSEE THE LAYOUT OF STORM
 WATER PIPES.PLEASE SHOW DETAIL OF THE CONTROL
 STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING
 ELEVATION, ETC ON DRAWINGS, DO YOU HAVE EXFILTRATION
 TRENCHES. PLEASE SHOW DRY DETENTION/WET DETENTION AREAS
 WITH 100% FILL OF STORM WATER ELEVATION?
 6. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST AROUND
 YOUR SITE.
 7. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, A COPY OF
 GEO-TECH REPORT AND A LATESTEST COPY OF STORM STORM
 WATER QUALITY CALCULATIONS THAT YOU PROVIDED AT 45TH
 STREET.
 8. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION
 DETAILS,CLOTHES USED FOR SILT ETC., PLANS SHOWING SILT
 FENCE AROUND THE SITE & CATCH BASINS.HEIGHT OF FENCE
 SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST &
 PARTICLES.
 9. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH
 STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED 10.
 PLEASE PROVIDE LATEST COPY OF SET OF CIVIL DRAWINGS
 THAT WERE APPROVED AT 45TH STREET IN JUNE 2007.
  
 PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR
 PERMITTING PROCESS
  
 RASIK CHOKSHI805-6723


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved