Date |
Text |
2006-07-06 00:00:00 | *** DENIED *** |
| 1) WHITE-OUT MAY NOT BE USED ON PLANS, |
| ALL HAND MADE CHANGES MUST BE SIGNED AND |
| DATED AT EACH CHANGE WITH-OUT USING |
| WHITE-OUT. |
| |
| 2) AS SUPPLY AIR DUCT SIZES APPEAR TO BE |
| OVER SIZED, PLEASE SUBMIT MANUAL D |
| CALCULATIONS FOR RESIDENTIAL DUCT DESIGN |
| OR OTHER APPROVED CALCULATIONS, PER 2004 |
| FBC/R M1601.1 . |
| |
| 3) AT THIS TIME THE 14" RETURN AIR |
| TRANSFER DUCT NEEDS TO BE 16" DUE TO THE |
| SUPPLY AIR DUCT SIZES IN THE MASTER |
| SUITE, SEE NOTE #4 (A) AND (C) MASTER |
| SUITE. |
| |
| 4) BALANCED RETURN AIR. |
| THIS MAY BE ACHIEVED BY. |
| (A)TRANSFER DUCTS MAY ACHIEVE THIS BY |
| INCREASING THE RETURN TRANSFER ONE AND |
| ONE HALF TIMES THE CROSS SECTIONAL AREA |
| (SQUARE INCHES) OF THE SUPPLY DUCT |
| ENTERING THE ROOM OR SPACE IT'S SERVING |
| AND THE DOOR HAVING AT LEAST AN |
| UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE |
| PROPER RETURN AIR BALANCE. |
| (B)TRANSFER GRILLES SHALL USE 50 |
| SQUARE INCHES (OF GRILLE AREA) TO 100 |
| CFM (OF SUPPLY AIR) FOR SIZING |
| THROUGH-THE-WALL TRANSFER GRILLES AND |
| USING AN UNRESTRICTED 1-INCH |
| UNDERCUTTING OF DOORS TO ACHIEVE PROPER |
| RETURN AIR BALANCE |
| (C)HABITABLE ROOMS ONLY SHALL BE |
| REQUIRED TO MEET THESE REQUIREMENTS FOR |
| PROPER BALANCED RETURN AIR EXCLUDING |
| BATHROOMS, CLOSETS, STORAGE ROOMS AND |
| LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY |
| AIR INTO THE MASTER SUITE SHALL BE |
| INCLUDED. PER 2004 FBC/R M1602.4 . |
| |
| MECHANICAL PLAN REVIEW BY; |
| TOM GORDON (561) 805-6729. |