Plan Review Notes For Permit 06010452
Permit Number 06010452
Review Stop E
Sequence Number 5
Notes
Date Text
2006-08-10 00:00:00*** UNSAT ***
  
 ** PLEASE SEE COMMENTS BELOW, SOME ARE
 EXISTING AND SOME ARE NEW BASED ON PLANS
 SUBMITTED.
  
 1) NOTE: PLEASE SEE PHASE 1, SHOWS METER
 FUTURE AND YET AND METER CAN IS BEING
 INSTALLED. PLEASE SEE PHASE II WHICH
 SHOWS THE METER BEING INSTALLED AS
 EXISTING.
 PLEASE KNOW WITHOUT TENANT SEPARATION
 THIS METERCAN IS NOT PERMITTED. SEC'S
 FROM GUTTER SHALL GO DIRECTLY INTO THE
 MAIN2 OF 2.
 THIS IS A SINGLE OCCUPANCY , ANY FUTURE
 METER CAN WILL BE DONE AT THE TIME OF
 SUCH SEPARATION OF TENANTS TAKES PLACE.
 THIS WAS THE UDNERSTANDING OF THE LAST
 MEETING BY THE DESIGN TEAM.
 PLEASE ALSO SEE PHASE ONE FOR RISER
 SHOWS CONDUIT AND FEEDERS TO NOTHING
 AFTER THE MAIN DISCONNECT.
  
 2) NOTE: PLEASE SEE PLANS INDICATE A
 PHASE 1 FOR E-1.1, YET TITLE BLOCK CALLS
 FOR PHASE II. PLEASE SEE THIS SHEET DOES
 NOT CORRELATE WITH PHASING OF THE
 PROJECT.
 PLEASE SEE SPRAY BOOTH IS BEING SHOWN AS
 FUTURE ON PHASE TWO SHEETS, YET SHOWS AS
 BEING INSTALLED ON OTHER SHEETS AND ON
 PAHSE TWO PANEL SCHEDULES.
 PLEASE KNOW ALL INFORMATION AS REQUESTED
 FOR LOCATIONS ETC WAS NOT SHOWN FOR
 SPRAY BOOTH.
 PLEASE SEE NOTE FROM PREVIOUS REVIEW
 BELOW;
 "PLEASE SEE NEC 511 AND 516. ALL AREAS
 AND CLASS LOCATION SHALL BE INDICATED
 AND LAYED OUT PER NEC 500, 500.5, 501,
 CLASS 1 DIV 1, CLASS 1 DIV 2?
 NFPA-88B, 1997
 PLEASE SEE THIS SHOWN WITH A "WAREHOUSE"
 OCCUPANCY WHICH DOES NOT SEEM TO
 CORRELATE WITH NEW REVISED PLANS AND
 PROPOSED WORK.
  
 3) NOTE: PLEASE SEE SEAL BY THE ENGINEER
 IS NOT CLEAR AND VISABLE WITH ALL
 INFORMATION ON SAID SEAL. THIS OFFICE
 HAS ATTEMPTED TO SHADE THESE SHEETS TO
 SHOW ALL INFORMATION, HOWEVER THIS HAS
 NOT BEEN AFFECTIVE.
 PLEASE SEE FAC 61G15-23.001
 "RAISED SEAL MUST BE CLEAR AND VISABLE"
  
 4) NOTE: MISSING DISCONNECT'S FOR CU'S.
 440.11
  
 5) NOTE: PLEASE SEE MISSING GFI FOR CU'S
 210.63, 210.8.
  
 6) NOTE: PLEASE SEE WIRE AND CONDUIT
 SCHEDULE AS #2 SHOWS AN "EQUIPMENT
 GROUNDING CONDUCTOR" BEFORE THE FIRST
 MEANS OF DISCONNECT. PLEASE SEE 250.6,
 250.24 B AS THE "EQUIPMENT GROUNDING
 CONDUCTOR" IS ONLY INSTALLED AFTER THE
 FIRST MEANS OF DISCONNECT.
 PLEASE SEE SEC'S TO MAIN 1 OF 1.
  
  
  
  
  
  
 6) NOTE: ** IMPORTANT" AS REQUESTED BY
 THE BUIDLING REVIEWER ON PREVIOUS NOTES:
 ONCE ALL REVIEWS ARE COMPLETE, BEFORE
 RESUBMITTING PLANS, PLEASE COMPLETELY
 REMOVE ALL OLD/VOIDED SHEETS AND ONLY
 INSERT NEW REVISED SHEETS INTO COMPLETE
 SETS FOR REVIEW AND STAMPING. ONE COPY
 OF THE OLD/VOIDED REMOVED SHEETS SHOULD
 BE SUBMITTED FOR REFERENCE.
 THIS WILL HELP TO ALLEAVIATE ANY DELAYS
 INTHE PROCESS.
  
 ** PLEASE KNOW, ONE SET OF EACH OF THE
 PREVIOUS SUBMITTED ELECTRICAL PLANS
 ALONG WITH THE NEW REVISED ELECTRICAL
 PLANS ARE BEING RETAINED BY THIS OFFICE
 AS EACH SET CONTAINS COMPLETELY
 DIFFERENT INFORMATION FOR USE/OCCUPANCY
 ETC.
  
 PLEASE SEE ANY COMMENTS FROM OTHER
 TRADES WHICH MAY AFFECT ELETRICAL PLANS.
  
 PLEASE SUBMIT THE ABOVE FOR REVIEW. IF
 THERE ARE ANY QUESTIONS, OR COMMENTS
 PLEASE CALL.
 A CALLED WAS PLACED TO THE ELECTRICAL
 ENGINEER'S OFFICE AND A MESSAGE WAS LEFT
 AS OF THIS REVIEW TO GO OVER PLANS.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]