Plan Review Notes
Plan Review Notes For Permit 06010269
Permit Number 06010269
Review Stop B
Sequence Number 2
Notes
Date Text
2006-02-02 00:00:00 
  
 DENIED
  
 COMMENTS FROM 1ST REVIEW NOT ADDRESSED
  
 1) DRAWINGS SHALL REFLECT CHANGE OF
 OCCUPANCY TO BUSINESS GROUP B
  
 2) EXTERIOR WALL SECTION 4/A2 STATES
 THAT A NEW CONCRETE FLOOR WILL BE POURED
 BEFORE SLAB IS POURED TERMITE PROTECTION
 PER 1816 FBC SHALL BE PERFORMED
  
 3) ON EXTERIOR WALL SECTION 4/A2 SPECIFY
 THE ANCHOR/CLIP TO BE USED FOR STUD TO
 PLATE CONNECTIONS.
  
 4) DETAIL 1/A2 IS TITLED EXTERIOR WALL
 SECTION SHOULD BE INTERIOR
  
 5) ROOF PLAN ON A1 AND DETAIL 2/A2 SHOW
 DIFFERENT OVERHANG SIZES
  
 6) EXTERIOR WALL SECTION 3/A2 SPECIFIES
 HURRICANE TIE IN SCHEDULE ON S-2 NO
 STRUCTURAL DRAWINGS WERE SUPPIED. IS NEW
 HURRICANE STRAP #1 TYPICAL FOR ALL
 TRUSSES, IF SO INDICATE ON DRAWINGS
  
 7) ATTIC VENTILATION SHALL COMPLY WITH
 1203.2 FBC 2004. 50% OF THE REQUIRED
 VENTILATING AREA SHALL BE PROVIDED BY
 VENTILATORS IN THE UPPER PORTION OF THE
 SPACE AND AT LEAST 3FT ABOVE THE EAVE
 VENTS
  
 8) BUSINESS OCCUPANCY SHALL MEET ALL THE
 CODE REQUIREMENTS FOR EGRESS AND
 ACCESSIBILITY INCLUDING BUT NOT LIMITED
 TO:
  
 A) DOOR OPENINGS SHALL BE 32" CLEAR
 FROM STOP TO FACE OF DOOR OPEN AT 90
 DEGREES PER 11-4.13.5
  
  
  
  
  
  
 B) DOORS TO ACCESSIBLE TOILET ROOMS
 SHALL COMPLY WITH SECTION 11-4.13 AND
 SHALL NOT SWING INTO THE CLEAR FLOOR
 SPACE FOR ANY FIXTURE PER 11-4.22.2
  
 C) ACCESSIBLE TOILET ROOMS SHALL MEET
 ALL OF THE REQUIREMENTS OF CHAPTER 11
 FBC 2004
  
 D) DRAWINGS DO NOT SHOW DETAIL OF
 ELEVATION CHANGE AT EXIT EGRESS DOOR.
 DOOR SHALL COMPLY WITH 11-4.5.2
  
 E) DOOR HARDWARE SHALL MEET
 ACCESSIBILITY CODES PER 11-4.13.9
  
 F) KITCHEN SINK SHALL MEET
 ACCESSIBILITY REQUIREMENTS PER 11-4.24
  
 G) EXIT/ENTRANCE SHALL BE ACCESSIBLE TO
 AN ACCESSIBLE ROUTE TO PUBLIC
 TRANSPOTATION STOPS, ACCESSIBLE PARKING
 SPACES AND PASSENGER LOADING ZONE
  
 H) ONE PARKING SPACE SHALL BE HANDI-CAP
 ACCESSIBLE AND MEET THE REQUIREMENTS OF
 11-4.6.1 THROUGH 11-4.6.6 AND BE SHOWN
 ON DRAWINGS TO MEET COMPLIANCE
  
 9) PRODUCT APPROVALS FOR EXTERIOR DOORS
 HAVE BEEN REVISED, SUBMIT UPDATED COVER
 SHEET. PAGE 1 OF 7 IS MISSING THAT PAGE
 HAS THE DESIGN PRESSURES FOR THE PRODUCT
 THE METHOD OF ATTACHMENT SHALL BE
 CLEARLY MARKED ON THE PRODUCT APPROVALS.
  
 10) DRAWINGS SPECIFY THREE DIFFERENT
 TYPES OF DOORS IF SO SUBMIT PRODUCT
 APPROVALS FOR EACH
  
 11) WINDOW AND DOOR PRODUCT APPROVALS
 CALL FOR BUCKS BY OTHERS, SUBMIT A
 DETAIL ON PLANS FOR BUCK ATTACHMENT THAT
 MEETS THE CODE WIND PRESSURES
  
 12) ENSURE THAT EXISTING FRAMING HAS
 BACKING FOR SHUTTER ATTACHMENT IN WOOD
 FRAMED WALL, ROOM 104
  
  
  
  
  
  
  
  
  
  
 15) STORM PANEL PRODUCT APPROVALS SHALL
 SPECIFY TYPE OF FASTENER USED IN BOTH
 WOOD AND BLOCK,EDGE DISTANCE,SPAN,ETC.
 A SCHEDULE WITH ALL THE INFORMATION AND
 A KEY PLAN WITH WINDOW LOCATION SHUTTER#
 AND LOCATION OF EMERGENCY EGRESS
 EXPEDITES THE PLAN REVIEW AND INSPECTION
 PROCESS. FIND ENCLOSED A SAMPLE OF AN
 INSTALLATION SCHEDULE. MOST SHUTTER
 CONTRACTORS MAKE UP SIMILAR SCHEDULES
 FOR THE GENERAL CONTRACTOR
  
  
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  
  
  
  
  
  
  