Plan Review Notes
Plan Review Notes For Permit 06010091
Permit Number 06010091
Review Stop P
Sequence Number 3
Notes
Date Text
2006-10-11 18:50:47DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 FUEL GAS
 FBC-2004 CHAPTER 1
 FBC-2004 CHAPTER 11
  
 1. OK
 2. OK - PLANS SHOW TILE TO 4'
 3. OK
 4. OK
 5. OK
 6. OK
 7. OK
  
 8. P3 NATURAL GAS RISER. THE FOLLOWING
 INFORMATION IS REQUIRED FOR THE GAS
 PERMIT:
 A. OK
 B. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2004 FUEL GAS CODE
 SECS. 502 THRU 505.
 ****RESPONSE NOTED, BUT GENERATOR SHALL
 VENT OUT OF THE STRUCTURE AND ABOVE THE
 ROOF LEVEL.
 ****NO RESPONSE, NOT ADDRESSED - SEE
 ATTACHED SHEET CONCERNING THE EXHAUST
 FROM THE GENERATOR FROM THE MANUF. SPECIFICATIONS.
 C.OK
 9.OK
 10. OK
 11. OK
 12. OK
  
 **************NEW COMMENT**************
  
 1B. FROM LOOKING AT THE MSDS SHEETS, A
 EYE WASH/EMERGENCY SHOWER WILL BE
 REQUIRED. SECTION 411.
 ****NO RESPONSE, NOT ADDRESSED
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved