Date |
Text |
2006-01-11 00:00:00 | 1) PLEASE INDICATEWHICH WALL MOUNT |
| DETAIL WILL BE USED, ALSO THE END |
| CONNECTION DETAIL FOR BOTH ACCORDIAN AND |
| ROLL DOWN SHUTTERS. HI-LIGHT OR CIRCLE |
| ON EACH PAGE WHICH ITEMS WILL BE USED. |
| |
| 2) FBC. 1008.1.3.6 |
| THE TEMPORARY INSTALLATION OR CLOSURE OF |
| STORM SHUTTERS, PANELS AND OTHER |
| APPROVED HURRICANE PROTECTION DEVICES |
| SHALL BE PERMITTED ON EMERGENCY ESCAPE |
| AND RESCUE OPENINGS IN GROUP R |
| OCCUPANCIES DURING THE THREAT OF A |
| STORM. SUCH DEVICES SHALL NOT BE |
| REQUIRED TO COMPLY WITH THE OPERATIONAL |
| CONSTRAINTS OF SECTION 1025.4. WHILE |
| SUCH PROTECTION IS PROVIDED, AT LEAST |
| ONE MEANS OF ESCAPE FROM THE DWELLING OR |
| DWELLING UNIT SHALL BE PROVIDED.THE |
| MEANS OF ESCAPE SHALL BE WITHIN THE |
| FIRST FLOOR OF THE DWELLING OR DWELLING |
| UNIT AND SHALL NOT BE LOCATED WITHIN A |
| GARAGE.OCCUPANTS IN ANY PART OF THE |
| DWELLING OR DWELLING UNIT SHALL BE ABLE |
| TO ACCESS THE MEANS OF ESCAPE WITHOUT |
| PASSING THROUGH A LOCKABLE DOOR NOT |
| UNDER THEIR CONTROL. |
| |
| 3)IF THE MAIN ENTRY DOOR WILL HAVE A |
| ROLL DOWN SHUTTER, INDICATE ON THE FLOOR |
| PLAN WHICH ONE OF WINDOW OR DOOR MEETS |
| THE EGRESS REQUIREMENTS. EXPLAIN THE |
| OPENING PROCEDURES. |
| |
| MYRON JACOBS |
| BUILDING PLAN REVIEWER |
| 805-6726 |
| |
| |
| |
| |
| |