2006-03-17 00:00:00************ UNSAT 2ND REVIEW *********
  
 1)NOTE: PLEASE KNOW, THERE ARE MANY
 ELECTRICAL COMMENTS BASED ON SERVICES AS
 SHOWN, HOWEVER MANY OF THOSE DO NOT
 APPLY AS THE SERVICES AS SHOWN ARE NOT
 PERMITTED. PLEASE SEE 230.2, ONLY ONE
 ELECTRICAL SERIVCE WILL BE PERMITTED.
 ALL MAINS ARE TO BE GROUPED PER 230.72.
 PLEASE SEE PTHER COMMENTS AS THEY WILL
 HAVE AN AFFECT ONE RISER AND NEW
 SERVICE.
  
 2)NOTE: PLEASE SEE RISER AS SHOWN SHOWS
 200A OCP FEEDING 125A PANEL.
 240.4, 215.5 ETC.
  
 3)NOTE: PLEASE SEE MISSING EQUIPMENT
 GROUNDING CONDUCTORS ON ALL CONDUITS ON
 RISER.
  
 4)NOTE: PLEASE SHOW ALL SERVICE AND
 PANEL LOCATIONS ON PLANS.
 215.5
  
 5)NOTE: PLEASE KNOW, A HOUSE PANEL WILL
 BE REQUIRED FOR ANY COMMON AREA BRANCH
 CIRCUITS. PLEASE KNOW, THE EGRESS
 LIGHTING ON UPPER FOYER AND STAIRS MAY
 NOT BE FED FROM ANY ONE UNIT.
 210.25
 PLEASE ALSO SEE COMMENTS WITH RESPECT TO
 THE EGRESS LIGHTING AND CONTROL.
  
 6)NOTE: PLEASE SEE LS101-7.8,7.9,
 NFPA-70 210.70, EGRESS LIGHTING IS
 REQUIRED AND THE METHOD OF CONTROL CAN
 BE DECIDED BY THE DESIGNER. PLEASE KNOW
 HOWEVER , IS USING SWITCHES, THERE MUST
 ALSO BE 3-WAY SWITCHING AT LOWER LEVEL.
 PLEASE ALSO SEE 7.9.2.2, 7.8.1.3 WHICH
 REQUIRES 10FT CANDLES MIN DURING NORMAL
 OPERATION AND 1 FT CANDLE UNDER
 EMERGENCY. A BATTERY BACK UP LT OF SOME
 SORT(S0 WILL BE REQUIRED TO SUPPLY THE
 MIN OF 1 FT CANDLE UNDER AN EMERGENCY
 CONDITION.
  
 7)NOTE: PLEASE SEE 424.3B FOR MININUM
 OCP FOR ALL AHU'S. PLEASE SEE 2-POLE 20A
 OCP FOR 10KW LOAD?
 PLEASE SEE 50A OCP FOR 10KW ETC, NONE OF
 THESE MEET ABOVE CODE.
  
 8)NOTE: PLEASE SEE THE "WALL UNIT" AS
 SHOWN AND ALSO VERIFY OCP AND UNIT.
  
 9)NOTE: PLEASE PROVIDE ENERGY
 CALCUALTIONS PER 2004 FBCCHAPTER 13.
  
 10)NOTE: PLEAS PROVIDE SPEC FOR WATER
 HEATERS BEING SHOWN OUTSIDE IN OPEN AIR.
 THESE UNIT MUST BERATED FOR WET
 LOCATIONS, OR OUTDOOR WP ENCLOUSURES
 SHALL BE SHOWN AND DETAILED.
 110.3, 215.5
  
 11)NOTE: PLEASE SEE SD'S SHALL BE
 INSTALLED PER NFPA-72 11.8.3.5, NO SD
 CAN BE WITH-IN 20' OF THE COOKING
 APPLIANCE UNLESS MEETING THE EXCEPTIONS
 AS SET-FORTH. PLEASE PROVIDE NOTES FOR
 TYOE OF SD(S) BEING INSTALLED PER
 EXCEPTIONS.
  
 12)NOTE: PLEASE SEE THAT PLANS SHALL
 INDICATE THE CURRENT CODES FOR THIS
 DESIGN. PLEASE KNOW, WE ARE UNDER THE
 2002 NFPA-70, 2002 NFPA-72, 2003
 NFPA-101, 2004 FBC. PLANS TO INDICATE
 THESE AT A MIN.
  
 13)NOTE: PLEASE SEE 2002 NEC 210.12 FOR
 MIN ARC FAULT PROTECTION REQUIRED FOR
 ALL CIRCUITING TO SLEEPING ROOMS.
 RECEPTS, LTS, FANS SD'S ETC.
  
 14)NOTE: PLEASE INDICATE ALL CIRCUITING
 ON PLANS AND CORRELATE WITH THE
 SUBMITTED PANEL SCHEDULES.
 215.5
  
 15)NOTE: PLEASE SEE MISSING DEDICATE
 BATH CIRCUITS PER 210.52D, 210.11C3,
 SHALL BE 20A AND #12.
  
 16)NOTE: COULD NOT LOCATE ANY MAIN
 LAUNDRY FACILITIES , PLEASE SEE
 210.11C2,210.52F, 220.16 ETC.
 PLEASE ALSO SEE MIN FACILITIES REQUIRED
 UNDER THE PLUMB AND MECHANICAL CODE.
  
 17)NOTE: PLEASE SEE FHAR 24 CFR 100.205
 FOR ALL DEVICE HEIGHTS AND DEVICE
 LOCATIONS. THESE ARE TO BE NOTED ON
 PLANS.
  
 18)NOTE: PLEASE SEE 210.52B1 FOR CIRCUIT
 REQUIRED IN DINING AREAS AND THE LIKE,
 THESE SHALL BE ON ONE OR MORE OF THE
 SMALL APPLIANCE CIRCUITS.
  
 19)NOTE: PLEASE SEE 210.8A FOR GFI
 LOCATIONS. (BATHRMS) EXISTING OR NEW).
  
 20)NOTE: PLEASE SEE FBC FOR EXSITING
 BUILDING AND REQUIREMENTS FOR BRINGING
 ALL UP TO CODE WIHT THE SCOPE OF WORK
 BEING PERMFORMED. PLEASE SEE THAT THE
 LEVEL OF ALTERATION SAHLL BE STATED.
  
 21)NOTE: PLEASE SEE LOAD CALCS FOR UNIT
 "B" WHICH SHOWS NO A/C LOAD IN LOAD
 CALCUALTIONS, YET PANEL SCHEDULE SHOWS
 10KW OF LOAD??
 215.5,424.4,240.4,310.16, ETC.
  
 22)NOTE: PLEASE SEE 250.110, 250.122,
 250.24, 250.66 FOR SIZING OF GROUNDING
 ELECTRODE CONDUCTOR AND EQUIPMENT GRNDS.
  
 23)NOTE: PLEASE SEE PLANS CONTAINING
 TITLE BLOCKS AND WORK COVERED IN THE
 REQUIREMENTS OF FS 481.229 ARE REQUIRED
 TO BE SIGNED , DATED AND SEALED BYB THE
 REGISTERED ARCHITECT AS LISTED. PLEASE
 SEE 481.221, FAC 61G1-16.003, .004
  
 24) NOTE: PLEASE SEE AHU, SHOWS TWO
 DISCONECTS FOR ONE UNIT?? PLEASE VERIFY
 AS THIS IS NOT COMMON AND NO CONDUCTOR,
 DISC SIZE INFORMATION WAS SUPPLIED OR
 SHOWN. PLEASE ALSO SEE 240.21 AS THESE
 ARE BEING SHOWN AS "TAPPED" CONDUCTORS??
 PLEASE KNOW, THIS SHOULD INDICATE ONE
 DISCONNECT PER 440.11.
 31.16,240.4 ETC.
  
 25)NOTE: PLEASE SEE NO MECHANICAL PLANS
 WERE SUBMITTED IN ORDER TO VERIFY AND
 CORRELATE THE EQUIPEMNT, CALCULATIONS
 ETC.
 PLEASE SEE FBC 106.3.5.1.1 WHICH
 DICTATES THE MIN PLANS REQUIRED FOR PLAN
 REVIEW OF COMMERCIAL BUILDINGS.
  
 26)NOTE: PLEASE SEE THE NOC SUBMITTED
 HSA SINCE EXPIRED PER FS 713.13(2). IF
 WORK HAS NOT COMMENCED WITHIN 90 DAYS OF
 RECORDING NOC, THE NOC SHALL BECOME
 VOID.
  
 ** PLEASE SEE ANY COMMENTS FROM OTHER
 TRADES WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
 ** PLEASE SUBMIT THE ABOVE INFORMATION
 FOR REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved