Plan Review Notes
Plan Review Notes For Permit 05101074
Permit Number 05101074
Review Stop P
Sequence Number 1
Notes
Date Text
2005-12-03 00:00:00PAUL SCHMITZ
 FBC2001 FUEL GAS CODEPLAN REVIEW
 FBC 2001 PLUMBING CODEPLAN REVIEW
 DENIED
 (1) FAC 61G-15.23.002(2)
 ENGINEERS CERTIFICATE OF AUTHORIZATION
 DELIQUENT.
 (2) RPZV BACKFLOW PREVENTER SHALL BE
 INSTALLED AND INSPECTED PRIOR TO
 STARTING WORK ON POOL.
 SEPARATE PERMIT REQUIRED BY LICENSED
 PUMBING CONTRACTOR.
 (3) SEC 106.1.1 INFORMATION ON
 CONSTRUCTION DOUCMENTS, PLANS AND
 PRODUCT APPROVAL, REQUIRED.
 MANFACTURE CUT SHEETS ON POOL HEATER.
  
 (4) SEPERATE PERMIT FOR GAS PIPING.
 THE FOLLOWING INFORMATION IS REQUIRED
 FOR THE GAS PERMIT:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
  
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 3. TYPE OF GAS, (LP OR NATURAL)
  
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
  
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
 .
 6. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
  
 END OF COMMENTS QUESTIONS 561-805-6692
  
  
  