2007-06-01 11:42:15PAGES AC-4 AND AC-10 OK, REMAINING PAGES DENIED WITH
 COMMENTS. SEE BELOW:
  
 1. AC-5: ONLY ONE OF THE TWO DUCTS PENETRATING JANITOR
 CLOSET WALL IS PROTECTED WITH FIRE DAMPER. PLEASE SHOW
 BOTH TO BE PROTECTED IN ACCORDANCE WITH FBC,M 607.1.2.
  
 2. AC-9: WHAT IS THE DESIGNTION FOR THE ROOFTOP EXHAUST
 FAN ABOVE RISER TX-14? THIS INFORMATION WAS REMOVED
 FROM PREVIOUS PLANS.
  
 3. AC-18: REVISION 21 REMOVED THE NOTE FOR 2 HOUR RATED
 DUCT, BUT EACH RISER STILL HAS A NOTE CALLING FOR FIRE
 RATED DUCT. PLEASE CLARIFY. IS THE DUCT TO BE RATED OR
 NOT?
  
 4. AC-18: REVISION 20, PLEASE SHOW HOW HORIZONTAL
 ASSEMBLY PENETRATION AT BOTTOM OF TX-22 IS TO BE
 PROTECTED PER FBC CH.705.
  
 5. AC-19: EQUIPMENT DESIGNATION ON THIS PAGE DOES NOT
 MATCH WITH RISERS BEING SERVED. EXAMPLE: REVISION SHOWS
 PAC 1 AND 2 FEEDING RISER P/A 1. HOWEVER, REVISED PG
 AC-10 SHOWS PAC-1 FEEDING RISER P/A 1 AND PAC-2 FEEDING
 RISER P/A 4. PLEASE COORDINATE DRAWINGS ACCORDINGLY.
  
 6. AC-7: PLEASE CHANGE PAC-9 REFERENCES TO PAC-5 IN
 CONJUNCTION WITH REVISION 17.
  
 7. AC-21 AND 22: ISO-PADS, IF LOCATED IN RETURN AIR
 PLENUMS, SHALL BE NON COMBUSTIBLE OR MEET THE 25/50
 FLAME SPREAD/SMOKE DEVELOPMENT INDEX PER FBC,M
 602.2.1.
  
 8. AC-22: RISER 31 SHOWS PAC-9 ON ROOF. PAC-9 WAS
 RENAMED PAC-5 IN REVISION 17 ON PAGE AC-7. PLEASE
 COORDINATE DRAWINGS.
  
 9. AC-23: EF-13,14,15,28 ARE ALL MARKED AS PART OF
 REVISION 11, BUT THEY DO NOT APPEAR AS PART OF REVISION
 11 ON THE PREVIOUS AC-23 WHICH WAS REVIEWED ON SEPT 6,
 2006. PLEASE MARK ALL REVISIONS CORRECTLY BASED ON WHEN
 THEY ARE FIRST ADDED TO PLANS.
  
 10. AC-23: EF-28 ON SCHEDULE SHOWS 400 CFM, BUT FLOOR
 PLAN SHOWS 450. WHICH IS CORRECT? EF-29 ON SCHEDULE
 SHOWS 900 CFM, BUT FLOOR PLAN SHOWS 800. WHICH IS
 CORRECT?
  
 11. AC-24: WHY ARE AC-12,13,14 CROSSED OUT ON HEAT PUMP
 SCHEDULE? SIZES AND OTHER RATINGS HAVE ALSO CHANGED FOR
 THESE UNITS, BUT THEY ARE NOT SHOWN AS HAVING BEEN
 REVISED. PLEASE CLARIFY.
  
 12. AC-25: DETAIL FOR CONDENSATE OVERFLOW PROTECTION: A
 FLOAT SWITCH MAY BE INSTALLED INSIDE THE UNIT, BUT A
 FLOATSWITCH IS STILL REQUIRED IN THE AUXILIARY DRAIN
 PAN UNDER THE UNIT PER FBC,M 307.2.3.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved