2007-06-01 11:42:15 | PAGES AC-4 AND AC-10 OK, REMAINING PAGES DENIED WITH |
| COMMENTS. SEE BELOW: |
| |
| 1. AC-5: ONLY ONE OF THE TWO DUCTS PENETRATING JANITOR |
| CLOSET WALL IS PROTECTED WITH FIRE DAMPER. PLEASE SHOW |
| BOTH TO BE PROTECTED IN ACCORDANCE WITH FBC,M 607.1.2. |
| |
| 2. AC-9: WHAT IS THE DESIGNTION FOR THE ROOFTOP EXHAUST |
| FAN ABOVE RISER TX-14? THIS INFORMATION WAS REMOVED |
| FROM PREVIOUS PLANS. |
| |
| 3. AC-18: REVISION 21 REMOVED THE NOTE FOR 2 HOUR RATED |
| DUCT, BUT EACH RISER STILL HAS A NOTE CALLING FOR FIRE |
| RATED DUCT. PLEASE CLARIFY. IS THE DUCT TO BE RATED OR |
| NOT? |
| |
| 4. AC-18: REVISION 20, PLEASE SHOW HOW HORIZONTAL |
| ASSEMBLY PENETRATION AT BOTTOM OF TX-22 IS TO BE |
| PROTECTED PER FBC CH.705. |
| |
| 5. AC-19: EQUIPMENT DESIGNATION ON THIS PAGE DOES NOT |
| MATCH WITH RISERS BEING SERVED. EXAMPLE: REVISION SHOWS |
| PAC 1 AND 2 FEEDING RISER P/A 1. HOWEVER, REVISED PG |
| AC-10 SHOWS PAC-1 FEEDING RISER P/A 1 AND PAC-2 FEEDING |
| RISER P/A 4. PLEASE COORDINATE DRAWINGS ACCORDINGLY. |
| |
| 6. AC-7: PLEASE CHANGE PAC-9 REFERENCES TO PAC-5 IN |
| CONJUNCTION WITH REVISION 17. |
| |
| 7. AC-21 AND 22: ISO-PADS, IF LOCATED IN RETURN AIR |
| PLENUMS, SHALL BE NON COMBUSTIBLE OR MEET THE 25/50 |
| FLAME SPREAD/SMOKE DEVELOPMENT INDEX PER FBC,M |
| 602.2.1. |
| |
| 8. AC-22: RISER 31 SHOWS PAC-9 ON ROOF. PAC-9 WAS |
| RENAMED PAC-5 IN REVISION 17 ON PAGE AC-7. PLEASE |
| COORDINATE DRAWINGS. |
| |
| 9. AC-23: EF-13,14,15,28 ARE ALL MARKED AS PART OF |
| REVISION 11, BUT THEY DO NOT APPEAR AS PART OF REVISION |
| 11 ON THE PREVIOUS AC-23 WHICH WAS REVIEWED ON SEPT 6, |
| 2006. PLEASE MARK ALL REVISIONS CORRECTLY BASED ON WHEN |
| THEY ARE FIRST ADDED TO PLANS. |
| |
| 10. AC-23: EF-28 ON SCHEDULE SHOWS 400 CFM, BUT FLOOR |
| PLAN SHOWS 450. WHICH IS CORRECT? EF-29 ON SCHEDULE |
| SHOWS 900 CFM, BUT FLOOR PLAN SHOWS 800. WHICH IS |
| CORRECT? |
| |
| 11. AC-24: WHY ARE AC-12,13,14 CROSSED OUT ON HEAT PUMP |
| SCHEDULE? SIZES AND OTHER RATINGS HAVE ALSO CHANGED FOR |
| THESE UNITS, BUT THEY ARE NOT SHOWN AS HAVING BEEN |
| REVISED. PLEASE CLARIFY. |
| |
| 12. AC-25: DETAIL FOR CONDENSATE OVERFLOW PROTECTION: A |
| FLOAT SWITCH MAY BE INSTALLED INSIDE THE UNIT, BUT A |
| FLOATSWITCH IS STILL REQUIRED IN THE AUXILIARY DRAIN |
| PAN UNDER THE UNIT PER FBC,M 307.2.3. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |