Plan Review Notes For Permit 05091425 |
Permit Number |
05091425 |
|
Review Stop |
P |
Sequence Number |
7 |
|
Notes |
Date |
Text |
2007-04-03 12:16:05 | REVISION/ DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 1 | | | | 1. SHT P-5 PIPE ROUTING IN AREAS 53, 55, 57, 75, 76 | | ALSO CHANGE THE WAY THE SQUARE FOOTAGE ACCUMULATED IN | | THE SYSTEM. THIS WILL CHANGE THE PIPE SIZE IN SOME | | INSTANCES. SEE ALL SECTIONS OF PIPE DOWNSTREAM OF THE | | CHANGES AND MAKE SURE THE SQUARE FOOTAGE IS RECHECKED. | | SECTION 104.2.1 AND TABLE 1106.3. | | | | 2. SHT P-5 NEW DECK DRAINS ADDED AROUND THE GAS HEATER | | SPA SHALL REFLECT THE SQUARE FOOTAGE BEING DRAINED AND | | INDICATE THE PIPE SIZE PER TABLE 1106.3. | | | | 3. SHT P-5 ALL CHANGES TO THE STORM SYSTEM, (DECK | | DRAINS, PLANTER DRAINS OR TRENCH DRAINS), SHALL BE | | REFLECTED IN THE STORM RISER DIAGRAMS. SECTION | | 104.2.1. | | | | 4. SHT P-5 THERE IS CONCERN THAT IF THERE IS BLOCKAGE | | IN THE PRIMARY SYSTEM IN SOME AREAS, THE WATER WILL | | ENTER THE OCCUPIED SPACES BEFORE THE SECONDARY DRAIN, | | OR OVERFLOW SCUPPER. (EXAMPLE AREAS 1 THRU 4, 15, 17, | | 19, 21, 22, 45). SECTIONS 1107.1 & 1107.3. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 805-6731 | | E-MAIL [email protected] |
|