Plan Review Notes For Permit 05091425 |
Permit Number |
05091425 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2006-08-26 00:00:00 | | | | | PASSED/PROVISO | | | | | | | | GAS APPLIANCE VENTING SHALL BE FIELD | | INSPECTED AND APPROVED. | | MANUF. SPECIFICATION SHEETS SHALL BE | | SUBMITTED AT THE TIME OF GAS PERMIT | | APPLICATION. MANUF. SPECIFICATIONS | | SHEETS REQUIRED FOR THE GAS REGULATORS. | | VENTS FOR REGULATORS SHALL BE MADE OF | | NON COMBUSTABLE MATERIAL. GAS RISER - A | | SHUT OFF VALVE SHALL BE INSTALLED PRIOR | | TO THE REGULATORS WITH A UNION BETWEEN | | OR AFTER REGULATOR. (SHT P-6). SECTION | | 410.2(5). REVISIONS REQUIRED FOR THESE | | SHEETS. |
|