2007-11-20 08:58:16 | REVIEW: 1ST |
| ACTION: DENIED |
| |
| FBC 2001 W/ 2003 SUPPLEMENTS |
| NFPA 37-94 |
| |
| 1. P-1A AND P-1B: INSTALLATIONS OF ABOVE GROUND FUEL |
| TANKS IN EXCESS OF 550 GALLONS ARE REQUIRED TO BE |
| APPROVED BY THE PALM BEACH COUNTY DEPARTMENT OF |
| ENVIRONMENTAL RESOURCE MANAGEMENT. PLANS SHALL BE |
| SUBMITTED AND APPROVED BY DERM PRIOR TO BEING REVIEWED |
| FOR CODE COMPLIANCE AND MADE PART OF THE PERMIT RECORD. |
| FOR MORE INFORMATION PLEASE CONTACT DERM AT |
| 561-233-2400 OR VISIT |
| HTTP://WWW.CO.PALM-BEACH.FL.US/ERM/INDEX.ASP. |
| |
| 2. P-1A AND P-1B: FUEL STORAGE FOR STATIONARY |
| COMBUSTION ENGINES SHALL COMPLY WITH NFPA 37-94 IN |
| ACCORDANCE WITH FBC, M 915.1. THE FOLLOWING CONDITIONS |
| WHICH ARE SHOWN ON PLANS ARE IN VIOLATION OF NFPA 37-94 |
| SEC. 6-3.2.3.1: |
| |
| A) UNENCLOSED DAY TANKS (I.E., TANKS NOT IN A ROOM BY |
| THEMSELVES) WHICH ARE USED FOR EMERGENCY PURPOSES SHALL |
| NOT EXCEED 660 GALLONS. |
| B) TWO OR MORE TANKS WITH AN AGGREGATE CAPACITY MORE |
| THAN 660 GALLONS SHALL NOT BE CONNECTED TO ONE ENGINE. |
| C) THE AGGREGATE CAPACITY OF ALL UNENCLOSED DAY AND |
| SUPPLY TANKS IN A BUILDING SHALL NOT EXCEED 1,320 |
| GALLONS. |
| D) DAY AND SUPPLY TANKS WITH INDIVIDUAL CAPACITIES |
| LARGER THAN 660 GALLONS OR THOSE TANKS WHICH CAUSE THE |
| AGGREGATE CAPACITY TO EXCEED 1,320 GALLONS IN A |
| BUILDING SHALL BE ENCLOSED IN ACCORDANCE WITH SEC. |
| 6-3.5. ROOMS CONTAINING ONLY TANKS SHALL BE CONSTRUCTED |
| OF WALLS, FLOOR AND TOP HAVING A FIRE RESISTANCE RATING |
| OF NOT LESS THAN 3 HOURS WITH THE WALLS BONDED TO THE |
| FLOOR IN ACCORDANCE WITH 6-3.5.1. PLEASE SEE THIS |
| SECTION FOR ADDITIONAL REQUIREMENTS. |
| |
| 3. IF THE 1500 GALLON DAY TANK IS ENCLOSED IN A 3-HOUR |
| ROOM AS REQUIRED BY 6-3.2.3.1 AND 6-3.5, THEN THE |
| AGGREGATE TOTAL OF THE SUPPLY TANKS FOR THE GENERATOR |
| AND THE FIRE PUMP WILL BE LESS THAN THE MAXIMUM |
| AGGREGATE 1,320 GALLONS ALLOWED FOR UNENCLOSED TANKS |
| AND NO ADDITIONAL 3-HOUR ENCLOSURES WILL BE REQUIRED BY |
| THIS SECTION. |
| |
| 4. PLEASE VERIFY COMPLIANCE WITH SECTIONS 6-4 THROUGH |
| 6-8 REGARDING FUEL FLOW CONTROL, FILLING, PIPING AND |
| TRANSFER OF LIQUID FUEL TO ENGINES. |
| |
| NOTE: A SEPARATE FUEL PERMIT IS REQUIRED FOR FUEL |
| STORAGE SYSTEMS. |
| |