2005-12-01 00:00:00 | DENIED:BUILDING 9 / 2001 FBC |
| 1.PLAN SHEET A-0.0.0 PROJECT |
| INFORMATION INDICATES TYPE VI, |
| UNPROTECTED SPRINKLERED.PLEASE |
| INDICATE WHICH SYSTEM WILL BE UTILIZED |
| (13, 13R, 13D?).PLEASE NOTE, |
| ADDITIONAL COMMENTS MAY BE GENERATED BY |
| THE RESPONSES GIVEN. |
| |
| 2.PLAN SHEET A-4.6.1 KEY NOTES/LEGEND, |
| ITEM #25 '1HR CHASE REFER TO 11/A-13'. |
| PLAN SHEET A-13 WAS NOT SUBMITTED FOR |
| REVIEW. |
| |
| 3.PLAN SHEET M0.1 EQUIPMENT SCHEDULE |
| INDICATES AHU-1 AS A 5 TON UNIT.NOTE |
| #2 INDICATES AREA SMOKE DETECTORS TO |
| SHUT DOWN THE AHU.PLEASE INDICATE THIS |
| ON THE ELECTRICAL PLANS FOR UNITS 80D & |
| 84D.SHOW COMPLIANCE WITH 2001 FMC |
| 606.2.1. |
| |
| 4.PLEASE CLARIFY RATING OF THE WALL |
| BETWEEN THE GARAGE & THE RESISDENCE. |
| THE ARCHITECTURAL PLANS ARE NOT CLEAR AS |
| TO WHERE THE 1HR RATING ENDS (AT THE |
| SLAB OR AT THE RATED CEILING). |
| |
| 5.PLAN SHEET M1 R/A JUMPER FROM THE |
| GUEST SUITE IN UNITS 80D & 84D IS NOT |
| SIZED IN ACCORDANCE WITH 2001 FMC 601.4 |
| EXCEPTION 1 & 3.R/A JUMPER FROM THE |
| GUEST SUITE SHALL BE A MINIMUM OF 12". |
| |
| 6.PLAN SHEET M3 R/A TRANSFER GRILLES |
| ARE NOT SIZE PROPERLY.SHOW COMPLIANCE |
| WITH 2001 FMC 601.4 EXCEPTION 2 & 3. |
| |
| 7.PLEASE PROVIDE OUTSIDE AIR |
| CALCULATIONS IN ACCORDANCE WITH TABLE |
| 403.3 OF THE 2001 FMC. |
| |
| 8.PLAN SHEET M3, THE DRYER EXHAUST |
| EXCEEDS THE REQUIRED 25FT MAXIMUM LENGTH |
| PER 2001 FMC 504.6.SPECIFIC DRYERS |
| WITH GREATER EXHAUST CAPACITY MAY BE |
| USED, PLEASE PROVIDE MANUFACTURER |
| SUBMITTAL DATA. |
| |
| 9.PLEASE PROVIDE A DETAIL FOR THE AHU |
| LOCATED IN THE 2ND FLOOR CLOSET.SHOW |
| COMPLIANCE WITH 2001 FMC 603.9.NO |
| COMBUSTIBLES ALLOWED PER 2001 FMC |
| 602.2.1. |
| |
| 10. PLEASE PROVIDE AN ANCHORING DETAIL |
| FOR THE CONDENSING UNITS PER 2001 FMC |
| 301.13. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE |
| CONTACT PATTY KRAUSS AT (561)805-6719. |