Date |
Text |
2005-11-17 00:00:00 | ******** UNSAT 2ND REVIEW ******* |
| |
| ** PLEASE SEE SOME NOTES FROM PREVIOUS |
| REVIEW STILL NEED TO BE ADDRESSED AND |
| PLEASE SEE NEW NOTES DUE TO CHANGES |
| MADE. |
| |
| 1)NOTE: NOTE #1 OK. |
| |
| 2)NOTE: NOTE #2 OK, WATER HEATER |
| REMOVED, GAS. |
| |
| 3)NOTE: NOTE #3 NO,PLEASE SEE MIN OCP |
| REQUIRED FOR POOL HEAT PUMP TO BE 125%. |
| 680.9 |
| THIS HAS NOT BEEN CHANGED |
| |
| 4)NOTE: NOTE #4 NO, PLEASE INDICATE ALL |
| CONTINUOUS LOADS AT 125%. (POOL PUMP, |
| HEAT PUMP). |
| PLEASE SEE 215.3,230.42 ETC. |
| PLEASE SEE THE FINAL LOAD CALCULATION |
| WAS REVISED HOWEVER NOT OCP, AND LOADS |
| FOR INDIVIDUAL UNITS WERE NOT NOTED OR |
| CHANGED. |
| PLEASE SEE POOL PANEL HAD ALREADY SHOWN |
| A LOAD AT 59.45A'S AND NOW LOAD EXCEEDS |
| FEED FOR PANEL. |
| THIS WAS MENTIONED ON PREVIOUS NOTES TO |
| UPDATE FEEDER AND OCP, HOWEVER OCP STILL |
| SHOWS A 60A FEED. |
| CONDUCTORS WERE CHANGED. |
| |
| 5)NOTE: NOTE #5 NO, PLEASE SEE LOAD |
| SHOWN FOR A/C LOADS ON PANEL "B" LOAD |
| CALCUALTIONS STILL DO NOT CORRELATE. |
| PLEASE SEE KVA HAS NOW CHANGED TO 10KW |
| PLEASE CORRELATE AHU LOADS, |
| PLEASE SEE NEW NOTE DUE TO INCREASE IN |
| KW RATING. |
| |
| 6)NOTE: NOTE #6 NO. PLEASE LIST ALL THE |
| REQUIRED ARC FAULT PROTECTED CIRCUITS AS |
| REQUIRED UNDER THE 2002 NEC. 210.12. |
| SD'S,LTS, RECEPTS, FANS ETC ARE ALL |
| REQUIRED TO HAVE ARC FAULT PROTECTION. |
| |
| 7)NOTE: NOTE #7 OK. |
| |
| 8)NOTE: NOTE #8 OK. |
| |
| 9)NOTE:NOTE #9 NO, PLEASE SEE 410.8 |
| FOR MINCLEARENCE REQUIRED FOR LT IN |
| PANTRY. |
| PLEASE KNOW, PANTRIES ARE LIKELY TO |
| CONTAIN COMBUSTIBLES. |
| PLEASE KNOW, IT IS NOTED THAT A NOTE ON |
| PLANS NOW MENTIONS LT ABOVE ON CEILING, |
| HOWEVER THIS DOES NOT CHANGE THE MIN |
| CLEARENCE REQUIREMENTS FOR TYPE OF |
| FIXTURE SHOWN. |
| CLEARENCES FROM 410.8 GO ALL THE WAY TO |
| THE CEILING. |
| |
| 10)NOTE:NOTE #10 OK. |
| |
| 11)NOTE: NOTE #11 OK. |
| |
| NEW NOTES: |
| |
| 1)NOTE: PLEASE SEE424.3B , NOW THAT KW |
| RATING FOR AHU HAS NOW INCREASED TO |
| 10KW, THE MIN OCP SHALL BE SIZED @125%. |
| PLEASE ALSO ADJUST MIN AWG ONCE OCP HAS |
| BEEN INCREASED. |
| |
| 2)NOTE: PLEASE SEE A NOTICE IS NOW GIVEN |
| WITH RESPECT TO THE DESIGN PROFESSIONAL |
| AND REPEAT COMMENTS. |
| PLEASE SEE COPY OF FS 553.80(2)(B) |
| ATTACHED. |
| THIS IS ONLY A NOTE GIVEN AT THIS TIME. |
| |
| |
| ** PLEASE REMOVE ALL OLD/VOIDED SHEETS |
| AND ONLY INSERT NEW REVISED SHEETS INTO |
| TWO COMPLETE SETS FOR REVIEW AND |
| STAMPING. |
| ONE COPY OF ANY OLD/VOIDED SHEETS SHOULD |
| BE SUBMITTED FOR REFERENCE. |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE IN CONTACTING |
| THIS OFFICE. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |
| ** PLEASE SEE MOST OF THE ITEMS ABOVE |
| HAVE BEEN REDLINED ON ONE SET OF PLANS |
| FOR AREAS OF COMMENTS. |
| |
| ** PLEASE BE SURE TO REMOVE ALL |
| OLD/VOIDED SHEETS FROM SETS AND AND ONLY |
| INSERT NEW REVISED SHEETS INTO COMPLETE |
| SETS FOR REVIEW AND STAMPING. |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE IN CONTACTING |
| THIS OFFICE. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |
| |
| |