Date |
Text |
2006-07-18 00:00:00 | BUILDING REVIEW THIRD CHECKLIST: |
| 1- ENGINEERING CALCS COMMENTS FROM |
| PREVIOUS CHECKLIST: |
| A) ENGINEER TO GET CORRECT BUILDING |
| DIMENSIONS FOR BUILDING MEAN HEIGHT, |
| CLADDING ELEVATION AND BUILDING WIDTH |
| AND REVISE CALCULATIONS AS REQUIRED. |
| B) FLORIDA BUILDING CODE 2004 REFERS TO |
| ASCE 7-02, NOT ASCE 7-98. REVISE |
| CALCULATIONS AS REQUIRED. |
| NOTE; ENGINEER TO GET ALL CORRECT |
| INFORMATION TO PROPERLY MAKE HIS SITE |
| SPECIFIC CALCULATIONS. |
| |
| 2- REVISE INSTALLATION SCHEDULE: |
| A) STRUCTURE TO RECEIVE PANELS IS |
| CONCRETE BLOCK, NOT CONCRETE. REVISE AS |
| REQUIRED AND SEE DRAWING 7 OF 7 OF STORM |
| SHUTTERS FOR PROPER ANCHOR SPACING. |
| B) CLARIFY WHY OPENING #2 IS 74" WIDE |
| BUT SHUTTER SPAN IS 73"?. |
| C) CLARIFY WHAT IS THE SPECIFIC |
| MOUNTING CONDITIONS. STORM SHUTTER DWGS |
| ARE MARKED WITH ALL KIND OF MOUNTING |
| CONDITIONS AND THERE ARE ONLY TWO |
| OPENINGS TO BE CLOSED. |
| F) IF USING DIRECT MOUNT APPLICATION, |
| THEN NEED TO PROVIDE REMOVABLE ANCHORS. |
| TAPCONS ARE NOT REMOVABLE ANCHORS. |
| |
| 3- STORM PANELS DRAWING 7 OF 7 IS MARKED |
| WITH DIFFERENT ANCHOR TYPES AND SPACING. |
| THIS DOESN'T MATCH THE INSTALLATION |
| SCHEDULE. REVISE AS REQUIRED. |
| |
| 4- OWES $50 FOR RE-SUBMITTAL FEES. THIS |
| IS THE THIRD TIME THIS APPLICATION IS |
| BEEN REVIEWED. ADDITIONAL FEES ARE DUE |
| WHEN RE-SUBMITTING APPLICATION. |
| |
| JULIO GOMEZ |
| BUILDING PLANS EXAMINER |
| (561)805-6712 |