2006-06-19 00:00:00 | PROVISO;2001 FBC/BUILDING 3/6 UNITS |
| RESPONSE TO COMMENTS DATED 2-7-06 |
| |
| COMMENT #5:PLAN SHEET M0.1 THE AHU |
| MOUNTING DETAIL KEYNOTE DETAIL 15 STATES |
| NO COMBUSTIBLES ALLOWED IN THE RETURN |
| AIR PLENUM.THE ARCHITECURAL PLANS |
| (A-4.0.2) THE DOOR SCHEDULE INDICATES |
| "WOOD LOUVERD DOOR".PLEASE VERIFY WITH |
| THE DOOR MANUFACTURE THAT THIS DOOR & |
| FRAME WILL MEET THE 25 FLAME/50 SMOKE |
| INDEX WHEN TESTED UNDER ASTM 84. |
| |
| COMMENT #6:BOOSTER FANS ARE TO BE |
| REMOVED AND SPECIFIC DRYERS ARE TO BE |
| INSTALLED.PLEASE NOTE, SPECIFIC DRYERS |
| ARE TO BE INSTALLED AT FINAL INSPECTION. |
| |
| COMMENT #7:PLAN SHEET M0.1. O.A. |
| CALCULATIONS ARE BASED ON "INFILTRATION |
| RATES".THESE ARE MAXIMUM RATES ALLOWED |
| BY THE CODE & MAY NOT BE "ACTUAL/TRUE" |
| RATES.THE ACTUAL RATE IS NOT KNOWN |
| UNLESS TESTED.O.A. CALCS ARE IN |
| ACCORDANCE WITH 2001 FMC 402.2, 402.2.1 |
| OR TABLE 403.3. PLAN SHEET M2 INDICATESA |
| 6" O.A. DUCT, PLEASE REMOVE IF THIS IS |
| NOT GOING TO BE UTILIZED. |
| |
| PLEASE REVISE PLANS TO REFLECT THE |
| IMPLEMENTATION OF PROVISO'S. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE |
| CONTACT PATTY KRAUSS AT (561)805-6719 OR |
| E-MAIL [email protected]. |