Date |
Text |
2006-02-11 00:00:00 | PLUMBING PLAN REVIEW EXAMINER |
| PAUL SCHMITZ 561-805-6692 |
| FBC PLUMBING 2004 |
| FBC FUEL GAS 2004 |
| FBC BUILDING 2004, CH 11 |
| DENIED |
| NEW COMMENTS |
| |
| 1) SHT.P-1 WATER RISER. |
| 604.9 WATER HAMMER. |
| THE FLOW VELOCITY OF THE WATER |
| DISTRIBUTION SYSTEM SHALL BE CONTROLLED |
| TO REDUCE THE POSSIBILITY OF WATER |
| HAMMER. A WATER-HAMMER ARRESTOR SHALL BE |
| INSTALLED WHERE QUICK-CLOSING VALVES ARE |
| UTILIZED. WATER-HAMMER ARRESTORS SHALL |
| BE INSTALLED IN ACCORDANCE WITH THE |
| MANUFACTURER?S SPECIFICATIONS. |
| WATER-HAMMER ARRESTORS SHALL CONFORM TO |
| ASSE 1010. |
| |
| 2)SHT.P-1 WATER RISER. |
| 606.1 LOCATION OF FULL-OPEN VALVES. |
| FULL-OPEN VALVES SHALL BE INSTALLED IN |
| THE FOLLOWING LOCATIONS: |
| 4.ON THE TOP OF EVERY WATER DOWN-FEED |
| PIPE IN OCCUPANCIES OTHER THAN ONE- AND |
| TWO-FAMILY RESIDENTIAL OCCUPANCIES. |
| |
| 3)SHT.P-1 WATER RISER, DEHUM 1,2 |
| 608.3 DEVICES, APPURTENANCES, APPLIANCES |
| AND APPARATUS. |
| ALL DEVICES, APPURTENANCES, APPLIANCES |
| AND APPARATUS INTENDED TO SERVE SOME |
| SPECIAL FUNCTION, SUCH AS STERILIZATION, |
| DISTILLATION, PROCESSING, COOLING, OR |
| STORAGE OF ICE OR FOODS, AND THAT |
| CONNECT TO THE WATER SUPPLY SYSTEM, |
| SHALL BE PROVIDED WITH PROTECTION |
| AGAINST BACKFLOW AND CONTAMINATION OF |
| THE WATER SUPPLY SYSTEM. WATER PUMPS, |
| FILTERS, SOFTENERS, TANKS, COMMERCIAL |
| DRINKING WATER DISPENSERS AND ALL OTHER |
| APPLIANCES AND DEVICES THAT HANDLE OR |
| TREAT POTABLE WATER SHALL BE PROTECTED |
| AGAINST CONTAMINATION. |
| |
| 4)SHT A-3 MINIMUM NUMBER OF REQUIRED |
| PLUMBING FIXTURES. TAB.403.1 |
| 4 FACTORY AND INDUSTRIAL STRUCTURES IN |
| WHICH OCCUPANTS ARE ENGAGED IN WORK |
| FABRICATING, ASSEMBLY OR PROCESSING OF |
| PRODUCTS OR MATERIALS. |
| 1 SERVICE SINK REQUIRED. |
| |
| END OF COMMENTS, QUESTIONS 561-805-6692 |