Date |
Text |
2005-12-06 00:00:00 | *** UNSAT *** |
| |
| 1)NOTE: PLEASE SUBMIT TWO COMPLETE SETS |
| OF PLANS, SPECS/MANUFACTURE CUT SHEETS. |
| PLEASE BE SURE ALL PLANS CONTAIN THE |
| PRINTED NAME AND SIGNATURE OF THE PERSON |
| RESPONSIBLE FOR PLANS/ DESIGN. |
| FBC 104.2.1 ADMINISTRATIVE SECTION. |
| |
| 2)NOTE: PLEASE SEE PANEL SCHEDULE/LOAD |
| CALCULATIONS SUBMITTED INDICATE FOR |
| PANEL "A", HOWEVER RISER DIAGRAM SHOWS |
| PANEL "B" AS THE EM PANEL? |
| PLEASE CORRELATE. |
| |
| |
| 3)NOTE: PLEASE SEE LOAD CALCUALTIONS |
| EXCEED RATING OF DISCONNECTS FOR |
| GENERATOR AND SERVICE. |
| PLEASE SEE LOAD FOR PANEL. |
| 215.5 |
| |
| 4)NOTE: PLEASE SEE PERMIT APPLICATION |
| HAS NOW BEEN CHANGED BACK TO NATURAL |
| GAS, HOWEVER PLEASE SEE SPECS FOR |
| GENERATOR INDICATE THIS AS LP? |
| PLEASE ALSO VERIFY WHICH, AS GEN IS NOT |
| RATED AT 40KW AS NG. |
| 215.5 |
| |
| ** PLEASE NOTE** |
| AUTOMATIC LOAD SHEDDING MAY BE AN |
| OPTION. |
| |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. PLEASE ALSO BE SURE TO SUBMIT |
| "2" SETS OF PLANS TOGETHER. |
| |
| IF THERE ARE ANY QUESTIONS, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE. |
| |
| ** PLEASE SEE THE NOC SHOWN IS FOR THE |
| BLD CONTRACTOR AND FOR THE NEW SFR. A |
| SEPARATE NOC WILL BE REQUIRED AS THE NEW |
| SFR DOES NOT INCLUDE THE GENERATOR.FS |
| 713.13(2) |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |