2005-08-15 00:00:00********* UNSAT *********
  
 1)NOTE: PLEASE SHOW ALL CIRCUITING FOR
 NEWAND CORRELATE WITH SUBMITTED PANEL
 SCHEDULE(S).
 PLEASE SEE EXT/ EM LT PER 700.12E,THE
 BRANCH
 CIRCUIT FEEDING THE UNIT EQUIPMENT SHALL
 BE THE SAME BRANCH CIRCUIT AS THAT
 SERVING THE NORMAL LIGHTING IN THE AREA
 AND CONNECTED AHEAD OF ANY LOCAL
 SWITCHES.
  
  
 2)NOTE: PLEASE SEE NFPA-101 7-8, WHICH
 REQUIRES MEANS OF EGRESS LIGHTING TO THE
 EXIT DISCHARGE/ TO PUBLIC RIGHT OF WAY.
 PLEASE SEE CORRIDORS IN OPEN COURTYARD
 AREAS. 101,15.2
 PLEASE ALSO SEE 700.12E FOR CIRCUITINGOF
 EM/LTS.PREVIOUSLY NOTED.
  
 3)NOTE: PLEASE SEE 2002 NEC FOR
 PROTECTION OF RECEPTS IN KITCHENS IN
 OTHER THAN DWELLING UNITS, WHICH
 REQUIRES ALL 15- AND 20-AMPERE, 125-VOLT
 RECEPTACLES IN NONDWELLING-TYPE KITCHENS
 TO BE GFCI PROTECTED. THIS REQUIREMENT
 APPLIES TO EACH AND EVERY 15- AND
 20-AMPERE, 125-VOLT KITCHEN RECEPTACLE,
 WHETHER OR NOT THE RECEPTACLE SERVES
 COUNTERTOP APPLIANCES.
  
 4)NOTE: PLEASE SEE MISSING THE "PRINTED"
 LICENSE NUMBER OF THE ENGINEER OF
 RECORD. PLEASE SEE FAC 61G15-23.002
 FS 471
  
 5)NOTE: PLEASE SEE BLDG, ZOING COMMENTS,
 NO SURVEY/SITE PLAN SHOWING SETBACKS FOR
 NEW KITCHAN ADDITION WAS SUBMITTED.
 PLEASE SEE FS 472.025, FAC 61G17-7.002,
 PLEASE BE SURE ALL SURVEY'S CONTAIN THE
 ABOVE.
  
 6)NOTE: PLEASE PROVIDE REFERENCE TO
 NFPA-96 WITH MEANS OF SHUT DOWN OF ANY
 ELECTRICAL DEVICES UNDER HOOD.
 PLEASE SEE CHAPTERS 9 AND 10
  
 7)NOTE: PLEASE SEE PANEL "B" WHICH IS
 SHOWN AS EXISTING SHALL NOT BE LOCATED
 IN "OFFICE CLOSET". PLEASE SEE FIRE
 REVIEW NOTES, NO STORAGE PERMITTED IN
 SPACES ABOUT ELECTRICAL EQUIPMENT/RMS.
 PLEASE SEE 408.7,240.24D, 110.26 ETC
 PLEASE SEE THIS AREA FOR LOCATION OF
 PANEL NEEDS TO REFERENCE, ELEC/MECH RM.
  
 8)NOTE:PLEASE CLARIFY/ SHOW EITHER NEW
 OR EXISTING ROOF-TOP WP GFI RECEPTS FOR
 RTU'S PER 210.63
  
 9)NOTE: PLEASE SEE 250.6,250.24,
 "EQUIPMENT GROUNDING " CONDUCTORS ARE
 ONLY INSTALLED AFTER THE FIRST MEANS OF
 DISCONNECT.
 PLEASE SEE EQP GRND FROM METER TO
 MAIN.(NEW).
  
 10)NOTE: PLEASE SHOW METHOD OF EQUIPMENT
 GROUNDING FROM PANELS TO ALL RTU'S.
 PLEASE KNOW, EMT MAY ONLY BE USED AS AN
 "EQUIPMENT GROUND PATH" IF USED IN
 CONNECTION WITH NEW "LISTED" EQUIPMENT
 GROUNDING CONNECTORS AND COUPLINGS.
 110.3
  
 11)NOTE: PLEASE SEE 230.2 FOR NEW
 SERVICE AS SHOWN ON PLANS. PLEASE
 CLARIFY IF "NEW SERVICE" IS GOING TO BE
 FED FROM THE SAME SERVICE DROP AND
 TRANSFORMER.
 215.3
  
 PLEASE SEE ANY POSSIBLE COMMENTS FROM
 OTHER TRADES WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
 PLEASE REMOVE ALL OLD/VOIDED SHEETS AND
 ONLY INSERT NEW REVISED SHEETS INTO
 COMPLETE SETS FOR REVIEW AND STAMPING.
 ONE SET OF OLD/VOIDED SHEETS ARE
 REQUIRED FOR REFERENCE.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved