Plan Review Notes
Plan Review Notes For Permit 05071276
Permit Number 05071276
Review Stop E
Sequence Number 1
Notes
Date Text
2005-08-01 00:00:00******** UNSAT **********
  
 1)NOTE: PLEASE SEE SEE PLANS MENTIONS A
 NEW TRANSFORMER, HOWEVER THIS COULD NOT
 BE LCOATED ON ELECTRICAL RISER DIAGRAM?
 215.5
 PLEASE REVISE DIAGRM TO INCLUDE ALL
 WIRING.
  
 2)NOTE: PLEASE SEE NEW"MPC", THIS DOES
 NOT PROVIDE ENOUGH INFORMATION. DOES
 THIS HAVE A MAIN? ETC ETC.
 215.5,240.4,310.16
  
 3)NOTE: PLEASE SEE "EQUIPMENT GROUNDING"
 CONDUCTORS ARE BEING SHOWN FROM METER TO
 "MAINS"/ FIRST MEANS OF DICSONNECT.
 PLEASE SEE 250.6,250.24, "EQUIPMENT
 GROUNDING" CONDUCTORS ARE ONLY INSTALLED
 AFTER THE FIRST MEANS OF DISC.
  
 4)NOTE: PLEASE SEE FS 471.003, WHICH
 REQUIRED ALL PLANS FOR NEW 277/480V
 SYSTEMS, TRANSFORMER ETC, TO BE SIGNED
 DATED AND SEALED BY A FLORIDA REGISTERED
 PE. PLEASE BE SURE PLANS HAVE ALL
 CORRECT TITLE BLOCK INFORMATION AS
 REQUIRED UNDER FAC 61G15-23.002 FOR
 ENGINEER/ENGINEERING FIRM OF RECORD.
  
 5)NOTE: PLEASE INCDICATE A PANEL
 SCHEDULE WITH SIZE OF OCP, AWG FOR EACH
 BRACH CIRCUIT.
 PLEASE SHOW CONDUIT, CONDUCTORS SIZES,
 CIRCUITS ON PLANS.
 215.5,240.4,310.16 ETC
  
 6)NOTE: PLEASE SEE 240.21,408.16 WHICH
 REQUIRES A MCB ON THE LOAD SIDE OF THE
 TRANSFORMER.
  
 7)NOTE: PLEASE SEE A MIN OF TWO GRNDS
 RODS ARE REQUIRED. 250.50
  
 8)NOTE: PLEASE SEE BLDG REVIEW NOTES,
 "ALL ELECTRICALSERVICE EQUIPMENT SHALL
 BE INSTALLED A MIN OF 6" ABOVE BASED
 FLOOD ELEVATION. THIS SHOULD BE NOTED ON
 PLANS.
  
 PLEASE SEE ANY POSSIBLE COMMENTS FROM
 OTHER TRADES WHICH MAY AFFECT ELECTRICLA
 PLANS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  