Notes
Date Text
2005-10-06 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FBC-2001 BUILDING
 FHA-98 DESIGN MANUAL
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 1. SHT A0.04C ACCESSIBILITY REQUIREMENTS
 PER SECTIONS 11-4.16.5, 11-4.19.5 AND
 11.4.21.7 TO BE SHOWN ON PLANS.
 2. SHT A0.04.4 DETAIL 04. SUBMIT
 CALCULATIONS FOR GRAB BAR BACKING PER
 SECTION 609.8 OF THE ANSI A117.1
 STANDARD FOR THE SUPPORTIVE STRUCTURE.
 INDICATE GUAGE OF METAL PLATE.
 3. SHT C1 SURVEY NOT SIGNED, SEALED, AND
 DATED AS REQUIRED BY FAC 61G15-23.002 &
 FS 471.025.
 4. SHTS C-2 THRU C-5 ENGINEERS SEAL
 SHALL IMPART INFORMATION REQUIRED BY FAC
 61G15-233.001 & FS 471.025 ON EACH
 SHEET. THE INFORMATION REQUIRED ON SEAL
 HAS NOT BEEN IMPRESSED ON EACH SHEET AS
 REQUIRED. - THE SIGNATURE REQUIRED
 APPEARS TO BE INITIALS WHICH ACCORDING
 TO FBPE IS NOT APPROVED AND A SIGNATURE
 IS REQUIRED. IF INDEED THIS IS YOUR
 LEGAL SIGNATURE, PROVIDE A SIGNED,
 SEALED, DATED, AND NOTORIZED LETTER
 INDICATING YOUR LEGAL SIGNATURE FOR OUR
 FILES.
 5. SHTS L-1, L4, AND IR-1 THRU IR-5, NO
 INFORMATION ON THE SEAL HAS BEEN
 IMPRESSED ON THE SHEETS AS REQUIRED BY
 FAC 61G1-16.001. ALSO THE CERTIFICATE OF
 AUTHORIZATION NUMBER AND THE PRINTED
 NAME OF THE PERSON SEALING THE DOCUMENT
 SHALL APPEAR ON THE TITLE BLOCK PER FAC
 61G1-16.004(2) & (6) AND FS 481.219,
 481.2055.
 6. SHT A1.02C DETAIL 04 SHOW TURNING
 AREA IN THE STAFF TOILET AS REQUIRED BY
 SECTION 11-4.22.3.
 7. SHT A1.02C DETAIL 01 SHOW TURNING
 AREA IN THE RESTROOMS, NOT IN THE
 STALLS. SECTION 11-4.22.3
 8. SHT A1.02C A DRINKING FOUNTAIN IS
 REQUIRED PER TABLE 403.1. SUBMIT A
 DETAIL SHOWING COMPLIANCE WITH SECTION
 11-4.15 AND ALL SUBSECTIONS AND WITH
 SECTION 11-4.1.3(10)(A) PROVISIONS FOR
 THOSE WHO HAVE DIFFICULTY BENDING OR
 STOOPING.
 9. SHT 1.05C DETAIL 02 SHOW THE TURNING
 AREA IN RESTROOM NOT IN THE STALL.
 SECTION 11-4.22.3
 10. PLEASE INDICATE IF THE KITCHEN WILL
 BE BUILT-OUT ON THIS PERMIT OR WILL IT
 BE A SEPARATE PERMIT, AS THE PLANS WILL
 HAVE TO BE ROUTED TO DBPR RESTURANT AND
 HOTEL DIVISION PRIOR TO APPROVAL.
 SECTION 101.4.7.
 11. SHTS A1.05, A1.09, A1.10, & A1.11.
 SS-1 SUBMIT CALCULATIONS FOR PRIMARY &
 SECONDARY ROOF DRAINS. SHOW TOTAL AREA,
 1/2 AREA OF ALL VERTICAL WALLS,
 (INCLUDING PARAPETS), ALL AREAS OF ROOFS
 ADDED TO ROOF AREA FROM ABOVE ADDED TO
 ROOF AREA IN CALCULATIONS. INDICATE
 TOTAL AREA DRAINED BY EACH ROOF DRAIN. -
 THIS IS REQUIRED FOR EACH ROOF LEVEL AND
 FOR THE RECREATION LEVEL. SHOW THE
 LOCATION OF ALL SECONDARY ROOF DRAINS
 AND SCUPPERS. INDICATE THE SIZE OF ALL
 SCUPPERS AND SUBMIT A DETAIL SHOWING THE
 HEIGHT, WIDTH AND THE HEIGHT OF THE FLOW
 LINE OFF THE ROOF. SECTIONS 1106 & 1107
 AND ALL SUBSECTIONS.
 12. SHT A4.01 TYPICAL UNIT 'AN' SHOW
 BACKING & OPENING DIMENSIONS FOR THE W/C
 OPENINGS FOR ADDITIONAL BATHROOMS PER
 BATHROOM REQUIREMENTS PAGE 7.35. THIS
 WILL BE REQUIRED FOR SHT A4.02 UNIT 'AS'
 SHT A4.03 UNIT 'BS', SHT A4.04 UNIT
 'BSM', SHT A4.05 UNIT 'CN', SHT A4.06
 UNIT 'CNM', A4.07 UNIT 'CS', SHT A4.15
 UNIT 'FS2', A4.16 UNIT 'GN', SHT A4.20
 UNIT 'KN', SHT A4.22 UNIT 'LS', SHT
 A4.23 UNIT 'MN1', SHT A4.24 UNIT 'MN2',
 SHT A4.25 UNIT 'MNM', SHT A4.26 UNIT
 'MS1', SHT A4.27 UNIT 'MS2', SHT 4.28
 UNIT 'MSM', SHT A4.29.1 UNIT 'NS', SHT
 A4.30.1 UNIT 'PS', SHT A4.31.1 UNIT
 'QN', SHT A4.32 UNIT 'RN', SHT A4.33
 UNIT 'RS', SHT A4.34 UNIT 'SN', SHT
 A4.35 UNIT 'SNM', SHT A4.36 UNIT 'TS',
 SHT A4.37 UNIT 'TSM', UNIT A4.41.1 UNIT
 'LTN', SHT A4.42.1 UNIT 'LTS', & SHT
 A4.31.1 UNIT 'STSM'.
 13. SHTS A4.10 - A4.16 CLEAR FLOOR SPACE
 SHALL BE FLUSH WITH THE CONTROL WALL FOR
 SHOWERS AND PARALLEL TO SHOWER. PAGE
 7.56.
 14. SHT A4.36 SUBMIT USABLE BATH DETAIL.
 15. SHT A4.37 SUBMIT USABLE BATH DETAIL.
 16. SHTS A4.38, A4.39, & A4.40 ENTRY
 LEVEL TO BE COVERED PER FHA. SUBMIT
 DETAILS FOR BATHROOMS.
 17. GROUND FLOOR CONFERENCE ROOM SINKS
 SHALL BE ACCESSIBLE. SUBMIT A DETAIL
 SHOWING COMPLIANCE WITH SECTION 11-4.24
 AND ALL SUBSECTIONS.
 18. SHT P-1 REGULATORS SHOW 7"W/C -
 TABLE 402(2) IS FOR 1/2 PSI WHICH IS 11"
 TO 14"W/C. PLEASE CLARIFY AND VERIFY
 INPUT PRESSURE FOR GAS SYSTEM.
 19. SHT P-1 INDICATE MATERIAL TO BE USED
 FOR THE REGULATOR VENT PIPING. (NON
 COMBUSTABLE REQUIRED).
 20. GAS RISER INDICATES 6396 MBH, BUT
 ADDS UP TO 6196 MBH. PLEASE CLARIFY. -
 LAST PIPE SECTION TO SPA @ 300 MBH SHALL
 BE 1" NOT 3/4" AS SHOWN. TABLE 402(2). -
 ALL PIPE SECTIONS SHALL SHOW THE LENGTH
 OF EACH SECTION ON THE RISER DIAGRAM.
 SOME SECTIONS DO NOT SHOW A LENGTH.
 21. THE FOLLOWING INFORMATION IS
 REQUIRED FOR GAS PERMIT:
 A. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 GAS CODE SECTION 304.
 B. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 (DOWNSTREAM OF REGULATOR).
 C. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAS CODE
 SECS. 502 THRU 506.
 D. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 22. SEPARATE GAS PERMIT REQUIRED. AT
 TIME OF APPLICATION, CONTRACTOR SHALL
 SUBMIT A PICTURE I.D. OF THE WELDER,
 WELDING CERTIFICATION, AND A COPY OF THE
 WELDING PROCEDURE.
 23. ALL FLOOR PLAN SHEETS, SHOW THE
 LOCATION & NUMBER OF EACH RISER THRU THE
 BUILDING ON EACH FLOOR PLAN AND EACH
 LEVEL. SECTION 104.2.1.
 24.SHT P-2 RISER DESIGNATIONS 35, 36,
 45, 46, 46A, & 47 ARE NOT SHOWN.
 25. SHT P-2 SHOW THE PIPING FOR ALL
 TRENCH DRAINS WITH PIPE SIZES. THIS
 SHALL BE REFLECTED ON THE STORM RISER
 DIAGRAM. SECTION 104.3.1.1.
 26. GREASE INTERCEPTOR SHALL BE SIZED BY
 THE ENVIRONMENTAL COMPLIANCE MANAGER.
 WASTE ORD. #3434. PLEASE CONTACT LYNN
 MASSON AT (561) 822-2271, FAX (561)
 822-2279 OR E-MAIL [email protected].
 27. SHT P-4 RAIN WATER LEADERS, SHOW ALL
 PIPE SIZES. RECALCULATE ADDITION ON SOME
 RWL'S, INDICATE RWL RISER NUMBERS, 3"
 OVERFLOW SHOWN CONNECTING TO PRIMARY
 SYSTEM AT COL. 24 BETWEEN COLS, A&B.
 PLEASE CLARIFY. SECTION 104.2.1. - SHOW
 ALL SECONDARY ROOF DRAINS, WITH PIPE
 SIZES, SF, ECT. INDICATE SF OF DRAIN
 BETWEEN COLS. S.06 & S.05 BETWEEN COLS.
 20 & 21, AND THE DRAIN BETWEEN COLS. H &
 I, AND BETWEEN COLS 18 & 19.
 28. SHT P-4 STATES "3"S FOR CONT. SEE
 P-4 HEALTH CLUB". THIS WAS NOT FOUND ON
 SHT P-4. PLEASE CLARIFY.
 29. SHT P-4 INDICATE WHAT THE
 DESIGNATION FOR "DL" REPRESENTS.
 30. SHT P-7 RISER DESIGNATIONS 35, 36,
 38, 45, 46, & 46A NOT SHOWN. PLEASE SHOW
 ALL RISERS FOR EACH FLOOR LEVEL. SECTION
 104.2.1.
 31. SHT P-7 SANT. PIPING NOT ALLOWED IN
 THE EGRESS STAIRWAY. NFPA-101 SECTION
 7.1.3.2.1(6).
 32. SHT P-8 OFFSETS SHOWN FOR RISERS 6,
 10, 11, 12, 15, & 17, 18, 19, 20 ARE NOT
 SHOWN ON THE RISER DIAGRAMS. SECTIONS
 104.2.1, & 104.3.1.1.
 33. SHT P-9 OFFSETS SHOWN FOR RISERS 42,
 44, 47, 30, 34, 35, 36, 21, 25, 1, AND
 TO TOILET ROOMS RECREATION LEVEL 4 ARE
 NOT SHOWN NO THE RISER DIAGRAMS.
 SECTIONS 104.2.1, & 104.3.1.
 34. SHT P-9SHOW THE TYPICAL PIPING
 LAYOUTS FOR RISERS 16, 22, 28, & 29.
 SECTION 104.3.1.1.
 35. SHT P-9 THE FOLLOWINGPIPING
 LAYOUTS DO NOT REFLECT RISER DIAGRAMS
 44, 47, 42, 40, 39, 20, & 4. SECTION
 104.2.1.
 36. SHT P-13 PIPING FOR THE DWV AND
 STORM SYSTEMS NOT APPROVED IN EGRESS
 STAIRWAYS. NFPA-101 SECTION 7.1.3.2.1(6)
 AND SECTION 1006.1.3.1.
 37. P-14. CONDENSATE IS INDICATED AS 5'
 SEPARATION FOR THE SUPPORTS. INDICATE
 MATERIAL FOR CONDENSATE PIPING. IF PVC,
 MAXIMUM 4' SEPARATION OF SUPPORTS PER
 TABLE 305.5. SUBMIT A DETAIL SHOWING
 COMPLIANCE WITH 140 MPH WIND LOAD FOR
 SUPPORTS.
 38. SHT P-15 PIPING OFFSETS NOT SHOWN ON
 RISER DIAGRAM 56, 59A, 92, 93, 94, 95,
 96, 97, 98, 99, & 100.
 39. SHT P-15 PIPING NOT APPROVED IN
 EGRESS STAIRWAYS. NFPA-101 SECTION
 7.1.3.2.1(6).
 40. SHT P-15 RISER DIAGRAM 72 NOT SHOWN
 ON SHEET. SECTION 104.2.1.
 41. SHT P-15 THE FOLLOWING PIPING
 LAYOUTS DO NOT REFLECT THE RISER
 DIAGRAMS: 48, 48A, 49, 50, 51, 56, 58,
 59, 59A, 61, 62, 64, 67, & 67A. - NOT
 ALL PIPING SHOWN ON THE RISER DIAGRAMS.
 SECTION 104.3.1.1.
 42. SHT P-16 NO PIPING TO W/M SHOWN AT
 EITHER SIDE OF STAIRS COL. LINE N.05,
 BETWEEN UNITS NLT103 & NLT104. INDICATE
 WHICH RISERS THESE W/M'S CONNECT TO.
 SECTION 104.2.1.
 43. SHT P-17 MAXIMUM 6' FROM POINT OF
 VENT TO TUB TRAP. (NEAR RISER 95) TABLE
 906.1.
 44. SHT P-17 THE FOLLOWING RISERS DO NOT
 REFLECT PIPING LAYOUT: 50, 51, 52, & 55.
 SECTION 104.2.1.
 45. SHT P-18 INDICATED AS LEVEL (5-15)
 PLEASE CLARIFY.
 46. SHT P-18 RISER 102 INDICATES 3"V DN
 TO RISER #34. THIS IS NOT SHOWN ON SHT
 P-17 NOR ON RISER 102. PLEASE CLARIFY.
 SECTION 104.2.1. - WHAT IS RISER #3W?
 WHERE IS IT LOCATED? SECTION 104.2.1.
 47. SHT P-20 PIPING FOR KIT SINKS NOT
 SHOWN. RISER #61. SECTION 104.3.1.
 48. SHT P-22 CONDENSATE LINE SHOWN AS 5'
 SEPARATION BETWEEN SUPPORTS. INDICATE
 TYPE OF MATERIAL. IF PVC PER TABLE 305.5
 MAXIMUM 4' SEPARATION BETWEEN SUPPORTS.
 SUBMIT A DETAIL FOR SUPPORTS SHOWING HOW
 THEY ARE ATTACHED TO THE ROOF AND SHOW
 COMPLIANCE WITH 140 MPH WIND LOAD.
 49. SHT P-23 BATHROOM MAIN LOBBY LEVEL 1
 SHOWN 36FU, BUT IS SHOWN AS 34FU ON SHT
 P-2. CORRELATE PLANS. SECTION 104.2.1.
 50. SHT P-23 RECREATION AT LEVEL 4
 PIPING DOES NOT REFLECT THE FIXTURE
 LAYOUT. PLEASE CORRELATE FIXTURE LAYOUT
 WITH PIPING LAYOUT. SECTION 104.2.1.
 (RISER DIAGRAM DOES NOT REFLECT FIXTURE
 LAYOUT EITHER).
 51. SHT P-23 RECREATION AT LEVEL 2
 INDICATES 40FU FOR FUTURE GYM, BUT ONLY
 44FU AFTER ADDING MEN'S & WOMEN'S TOILET
 ROOMS. PLEASE RECALCULATE FU'S. (ALSO
 ADJUST ON RISER DIAGRAM). SECTION
 104.2.1.
 52. SHT P-23 RISER DIAGRAMS STATE "FOR
 CONT. SEE P-68". P-68 SHOWS STORM RISER
 ONLY. PLEASE CLARIFY. SECTION 104.2.1.
 53. SHT P-39 FLOOR DRAIN NOT SHOWN
 BETWEEN 1ST & 2ND WLI UNITS FIRST FLOOR.
 PLEASE CLARIFY. SECTION 104.2.1.
 54. SHT P-52 SANT. RISER DIAGRAM UNIT
 TOWNHOME, MAXIMUM 4FU ON 2" WET VENT PER
 TABLE 909.3.
 55. SHT P-52 RISER DIAGRAMS STATE "FOR
 CONT. SEE P-69". CONT. NOT FOUND ON
 P-69. PLEASE CLARIFY. SECTION 104.2.1.
 56. SHT P-53 RISER 13 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SECTION 914.1.
 - DRY HORIZONTAL VENTS NOT APPROVED 17TH
 FLOOR. SECTIONS 905.3/905.4.
 57. SHT P-53 RISER 8 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SECTION 914.1.
 58. SHT P-54 RISER 10 LOWER OFFSET VENT
 REQUIRED. SECTION 915.3. - HORIZONTAL
 BRANCH CONNECTIONS NOT APPROVED ON THE
 HORIZONTAL OFFSET. SECTION 711.2
 59. SHT P-54 RISER 12 LOWER OFFSET VENT
 REQUIRED. SECTION 915.3. - MAX 10 BRANCH
 INTERVALS TO RELIEF VENT. SECTION 914.1.
 - 4" VENT TO RISER #8 READS "FROM RISER
 8. PLEASE CORRELATE RISERS. SECTION
 104.2.1.
 60. SHT P-54 RISER 14 LOWER OFFSET VENT
 REQUIRED. SEC. 915.3 - MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1.
 61. SHT P-54 RISER 17 LOWER OFFSET VENT
 REQD. SEC. 915.3. - MAX 10 BRANCH
 INTERVALS TO RELIEF VENT. SECT. 914.1.
 62. SHT P-55 RISER 20 BATHROOM SHOWN ON
 4TH FLOOR ON FLOOR PLAN, BUT SHOWN ON
 5TH FLOOR ON RISER. CORRELATE RISER AND
 FLOOR PLAN. SEC. 104.2.1. - W/M FOR 16TH
 FLOOR NOT SHOWN ON RISER. SEC. 104.2.1.
 63. SHT P-55 RISER 22 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1.
 64. SHT P-55 RISER 23 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1 -
 LOWER OFFSET VENT REQD. SEC. 915.3.
 65. SHT P-56 RISER 25 SINK MISSING 17TH
 FLOOR. SEC. 402.1.1.
 66. SHT P-56 RISER 26 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1. -
 NO BRANCH CONNECTIONS ON HORIZONTAL
 OFFSET. SEC. 711.2.
 67. SHT P-56 RISER 28 NO HORIZONTAL DRY
 VENTS. SEC. 905.3/905.4 (16TH FLOOR)
 68. SHT P-56 RISER 29 LOWER OFFSET VENT
 REQD. SEC 915.3. - NO CONNECTION TO
 HORIZONTAL OFFSET. SEC. 711.2.
 69. SHT P-56 RISER 30 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1. -
 NO HORIZONTAL DRY VENTS. SEC.
 905.3/905.4
 70. SHT P-56 RISER 32 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1 -
 NO HORIZONTAL DRY VENTS. SEC.
 905.3/905.4. - UPPER OFFSET VENT REQD.
 SEC. 915.2. - SEPARATE RISER SECTION AT
 BASE OF STACK FOR POWDER ROOM, INDICATE
 RISERS CONNECTING FROM UPSTREAM. (33,
 37, 37A) SEC. 104.2.1.
 71. SHT P-56 RISER 33 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1. -
 NO HORIZONTAL DRY VENT. SEC. 905.3/905.4
 - DOES NOT REFLECT FLOOR PLAN @ 4TH
 LEVEL. (BASE OF STACK) SEC. 104.2.1. -
 VENT FROM 1ST FLOOR FLOOR DRAIN NOT
 SHOWN ON RISER. (SEE P-3, P-4, P-67).
 72. SHT P-57. RISERS 39, 40,41, 42, 43,
 44 DO NOT REFLECT THE FLOOR PLANS AT THE
 BASE OF RISER. SEC. 1-4.2.1.
 73. SHT P-57 RISER 42 VENT FROM FIRST
 FLOOR FLOOR DRAINS NOT SHOWN. PLEASE
 CLARIFY. SEC. 104.2.1.
 74. SHT P-58 RISERS 45, 46, 47 DO NOT
 REFLECT FLOOR PLANS FOR 4TH LEVEL.
 SECTION 104.2.1.
 75. SHT P-59 RISER 50 DOES NOT REFLECT
 THE FLOOR PLAN 4TH LEVEL. SEC. 104.2.1.
 76. SHT P-59 RISER 51 DOES NOT REFLECT
 THE FLOOR PLAN AT BASE OF RISER AND ON
 THE 4TH LEVEL. PLEASE CLARIFY SEC.
 104.2.1.
 77. SHT P-59 RISER 52 DOES NOT REFLECT
 FLOOR PLAN LEVEL 2. - UPPER OFFSET VENT
 REQUIRED. SEC. 915.2.
 78. SHT P-59 RISERS 53, 55 DO NOT
 REFLECT THE FLOOR PLAN 4TH LEVEL.
 SECTION 104.2.1.
 79. SHT P-60 RISER 56 DOES NOT REFLECT
 THE FLOOR PLAN 3RD LEVEL. - OFFSET VENTS
 REQD. SECS. 915.2/915.3. - MAX. 10
 BRANCH INTERVALS TO RELIEF VENT. SEC.
 914.1. - NO CONNECTIONS TO HORIZONTAL
 OFFSET. SEC. 711.2.- NO HORIZONTAL DRY
 VENTS. SECS. 905.3/905.4.
 80. SHT P-60 RISER 58 DOES NOT REFLECT
 THE FLOOR PLAN, CHECK LOCATION OF
 CONNECTION OF RISER 59. - RISER 58 & 61
 NOT TIED TOGETHER ON FLOOR PLAN. - UPPER
 OFFSET VENT REQD. 915.2
 81. SHT P-60 RISER 61 DOES NOT REFLECT
 THE FLOOR PLAN LEVEL 17. SEC. 104.2.1.
 82. SHT P-60 RISER 57 DOES NOT REFLECT
 THE FLOOR PLAN UPPER LEVEL. - MAX 10
 BRANCH INTERVALS TO RELIEF VENT. SEC.
 914.1.
 83. SHT P-60 RISER 60 DOES NOT REFLECT
 THE FLOOR PLAN. SHOWS CONNECTING TO
 HORIZONTAL DRAIN LINE. (GROUND FLOOR?) -
 UPPER OFFSET VENT REQD. SEC. 915.2. -
 DOES NOT REFLECT THE FLOOR PLAN AT THE
 TOP OF THE RISER. - MAX 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1.
 84. SHT P-61 RISER 62 DOES NOT REFLECT
 THE FLOOR PLAN. - LOWER OFFSET VENT REQD
 SEC. 915.3.
 85. SHT P-61 RISERS 63, 64 DO NOT
 REFLECT THE FLOOR PLAN. PLEASE CLARIFY
 SEC. 104.2.1.
 86. SHT P-61 RISER 67 MAX 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1. -
 NO HORIZONTAL DRY VENTS. SECS. 905.3
 905.4.
 87. SHT P-61 RISER 67A DOES NOT REFLECT
 THE FLOOR PLAN. - LOWER OFFSET VENT REQD
 SEC. 915.3.
 88. SHT P-61 RISER 68 FIXTURES NOT SHOWN
 FOR 4TH LEVEL ON THE RISER. PLEASE
 CLARIFLY. SECTION 104.2.1.
 89. SHT P-62 RISER 70 LOWER OFFSET VENT
 REQD. SEC 915.3
 90. SHT P-62 RISER 71 MAX. 10 BRANCH
 INTERVALS TO RELIEF VENT. SEC. 914.1. -
 NO DRY HORIZONTAL VENT. SECS. 905.3
 905.4.
 91. SHT P-62 RISER 72 DOES NOT REFLECT
 THE FLOOR PLAN PIPING LAYOUT LEVEL 3.
 SECTION 104.2.1.
 92. SHT P-62 RISER 73 & 74 MAX. 10
 BRANCH INTERVALS TO RELIEF VENT. SEC.
 914.1.
 93. SHT P-62 RISER 74A DOES NOT REFLECT
 THE FLOOR PLAN LEVEL 4. SECTION 104.2.1.
 94. SHT P-62 RISER 79 DOES NOT REFLECT
 THE FLOOR PLAN PIPING LAYOUT LEVEL 4.
 SEC. 104.2.1.
 95. SHT P-63 RISERS 75,76,77,78,87,88
 DO NOT REFLECT THE FLOOR PLAN PIPING
 LAYOUTS LEVEL 4. SECTION 104.2.1.
 96. SHT P-63 RISER 80 FLOOR DRAIN LEVEL
 16 ROOF NOT SHOWN ON RISER DIAGRAM.
 SECTION 104.2.1. CORRELATE RISER/FLOOR
 PLAN.
 97. SHT P-63 RISERS 89,94,95,99,101,102
 & 103 DO NOT REFLECT THE FLOOR PLANS.
 SECTION 104.2.1.
 98. SHT P-67 HORIZONTAL SANT. RISER
 DIAGRAM MISLABELED AS "WATER RISER
 DIAGRAM". PLEASE CLARIFY. SEC. 104.2.1.
 99. SHT P-67 FOLLOWING ARE CORRECTIONS
 TO BE MADE TO SANT. RISER DIAGRAM: -
 RISERS 35 & 36 NOT SHOWN. - PIPING
 LAYOUT DOWNSTREAM OF RISER 33,37,37 DOES
 NOT REFLECT FLOOR PLAN FOR POWDER ROOM.
 - RISERS 23 & 23A MISLABELED. - 2" VENT
 UP TO RISER 42 NOT SHOWN ON RISER 42. -
 PIPING BETWEEN RISERS 6,10,11,12,15 &
 RISER 9,13 DOES NOT SHOW POWDER ROOM OR
 WASH MACHINE. - OFFSETS & PIPING LAYOUT
 SHOWN ON SHT P-9 ARE NOT SHOWN ON RISER
 DIAGRAM. - NO VENT SHOWN FOR GREASE
 LINE. - GREASE LINE DOES NOT REFLECT THE
 FLOOR PLAN, AND IS NOT SHOWN ON FLOOR
 PLANS P-15 THRU P-18. -4"-34FU FOR CONT.
 SEE P-23 SHOWS 36FU ON SHT P-23.
 CORRELATE SHEETS. - 2" VENT FROM 2 SINKS
 SHOWS 3" VENT ON SHTS P-3, P-4, & P-5.
 CORRELATE SHEETS. - 2" VENT UP TO RISER
 67 TO READ "TO RISER 67A". (SEE RISER
 67A). - "2" VENT FOR CONT. SEE P-53"
 INDICATE RISER VENT WILL CONNECT TO. -
 "UNITS WL1, WL2 & UNITS 1T THRU 10T,
 4"-28FU FOR CONT. SEE P-53. NOT FOUND ON
 SHT P-53. PLEASE CLARIFY - 6" LINE FROM
 RISER 92,93,94,95,96,97,98, 99,100 DOES
 NOT SHOW OFFSET ON RISER SHOWN ON SHT
 P-15. - THIS SHEET SHOWS LEVELS AS PARK,
 PARK 2, PARK 3 ECT., BUT SHEETS P-15,
 P-16. & P-17 SHOWS LEVELS AS GROUND
 FLOOR, PARTIAL N. RES. LOFTS, N. LOFTS
 MEZZ. ECT. PLEASE CLARIFY & CORRELATE
 SHEET LEVELS. - RECHECK ADDITION OF
 FIXTURE UNITS AS THEY ACCUMULATE IN THE
 SYSTEM. SOME FIXTURES UNITS ARE NOT
 SHOWN AND ADDED TO THE SYSTEM. INDICATE
 THE SLOPE OF THE PIPE WHERE THE FIXTURES
 UNITS ARE MORE THAN ALLOWED FOR MINIMUM
 SLOPE. ALL PIPE IN A GIVEN RUN SHALL BE
 INSTALLED IN A UNIFORM SLOPE AS REQUIRED
 IN SECTION 704.1. INDICATE ON PLANS.
 SECTION 104.2.1.
 100. SHT P-68 HORIZONTAL STORM RISER
 DOES NOT REFLECT STORM PIPING IN
 BUILDING. STRUCTURES S1 THRU S9 NOT
 SHOWN. - NO ROOF DRAINS 2650SF, 2350SF,
 2450SF ECT. FOUND. - NO EXFILTRATION
 TRENCHES FOUND. - NO TRENCH DRAINS
 FOUND, RISERS SHOWS 25TH, 26TH, 27TH
 FLOORS ECT. - NO POINT OF REFERENCE TO
 FLOOR PLAN CAN BE FOUND. - RISER HARD TO
 READ, PLEASE INCREASE THE SIZE OF THE
 STORM RISER DIAGRAM AND POSSIBLY SPLIT
 UP TO TWO PAGES TO MAKE RISER EASIER TO
 READ. SECTION 104.2.1.3.
 101. SUBMIT A CONDENSATE RISER DIAGRAM
 SHOWING ALL PIPE SIZES AND INDICATE
 MATERIAL. SECTION 104.3.1.1.
 102. SUBMIT A P/T VALVE DISCHARGE RISER
 DIAGRAM SHOWING ALL PIPE SIZES AND
 INDICATE PIPING/FITTING MATERIAL.
 SECTION 104.3.1.1.
 103. SUBMIT AN EMERGENCY PAN DRAIN RISER
 DIAGRAM FOR THE WATER HEATERS. INDICATE
 PIPE SIZES AND MATERIAL FOR PIPE AND
 FITTINGS.
 104. BACKFLOW PROTECTION REQUIRED FOR
 IRRIGATION, POOLS, TRASH CHUTE WASH
 DOWN, AND COOLING TOWER MAKE UP WATER.
 SECTION 608. INDICATE METHOD OF
 PROTECTION FOR EACH SYSTEM.
 105. PLANS ARE INCOMPLETE AT THIS TIME
 AND MORE COMMENTS MAY BE FORTHCOMING
 WITH THE NEXT REVIEW.
 ****************************************
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
 ****************************************
 ****************************************
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]