2005-08-23 00:00:00 | *********** UNSAT *************** |
| |
| PALLADIO |
| 2211 N. FLAGLER DR. |
| PLANS SUBMITTED AND UNDER "PLAN REVIEW" |
| ONLY. BROUGHT IN FOR PERMIT,HOWEVER PLAN |
| REVIEW DONE UNDER PLAN REVIEW. |
| |
| 1)NOTE: PLEASE SUBMIT ALL MANUFACTURE |
| SPECIFICATION SHEETS/ CUT SHEETS FOR |
| FIRE PUMP(DIESEL) FIRE PUMP CONTROLLER, |
| GENERATOR, AUTOMATIC TRANSFER SWITCH |
| (ATS) AND ANY SUB BASE FUEL TANKS. |
| PLEASE SURE ALL INFORMATION SUBMITTED |
| MUST SHOW LISTINGS FROM A NATIONALLY |
| RECOGNIZED TESTING LAB. (NRTL). |
| PLEASE BE SURE ALL FIRE PUMP CONTROLLERS |
| ETC COMPLY WITH NFPA-20 AND OTHER |
| APPLICABLE CODES. |
| |
| 2)NOTE: PLEASE SEE SPEC BOOKS SUBMITTED |
| ARE NOTED AS ELECTRICAL MECHANICAL SPECS |
| BY OTHERS? |
| PLEASE BE SURE THESE ARETO BE |
| SUBMITTED AT THIS TIME. |
| |
| 3)NOTE: PLEASE SEE MAIN ELECTRICAL RM |
| LOCATED ON E-PH-1 WHICH SHOWS DOORS WITH |
| AN "IN-SWING", PLEASE SEE DOORS ARE |
| REQUIRED TO SWING OUT AND SHALL CONTAIN |
| OR "PANIC " HARDWARE AS LISTED IN 110.26 |
| PLEASE NOTE: PANIC HARDWARE REQUIREMENTS |
| ON ELECTRICAL PLANS. |
| PLEASE SEE FIRE PUMP ROOM WILL BE |
| REQUIRED TO HAVE DIRECT ACCES TO |
| CORRIDOR WITHOUT TRAVEL THROUGH A |
| "STORAGE ROOM". |
| PLEASE SEE FIRE REVIEW COMMENTS ALSO. |
| |
| 4)NOTE: PLEASE SEE MISSING REQUIRED GFI |
| RECEPT(S) TO BE LOCATED WITH/IN 20' OF |
| POOL(S).PLEASE SEE 680.22 |
| |
| 5)NOTE: PLEASE SEE MIN CLEARENCES |
| REQUIRED FOR LANDSCAPE LIGHTING FIXTURES |
| PER 680.22(B)1 5' MIN FOR HV AND GFCI |
| PROTECTION REQUIRED. PLEASE ALSO SEE |
| 411.4 FOR LV TYPE FIXTURES AND MIN OF |
| 10' FROM WATER'S EDGE. |
| |
| 6)NOTE: PLEASE SEE ALTERNATING |
| CIRCUITING FOR EMERGENCY EGRESS LIGHTING |
| REQUIRED IN HALLWAYS/CORRIDORS, EGRESS |
| STAIRWAYS AND ("EGRESS TUNNELS"). |
| PLEASE SEE NFPA-101 7-9, WHICH REQUIRES |
| NOT TO LEAVE ANY EGRESS PATH IN TOTAL |
| DARKNESS UPON THE SWITCHING/TRIPPING OF |
| A SINGLE BREAKER. PLEASE SEE BATTERY |
| BACK UP TYPE OF FIXTURES WOULD NOT |
| REQUIRE ALTERNATING EM CIRUITS FOR |
| EGRESS LIGHTING. |
| |
| 7)NOTE: PLEASE SEE ALL MAIN ELECTRICAL |
| ROOMS, GEN RM, FIRE PUMP RM AND ELEVATOR |
| EQUIPMENT ROOMS/EQUIPMENT BOILER RM |
| SHALL A BATTERY BACK UP TYPE OF LIGHTING |
| FIXTURE. |
| 700.16, LS 101 7-9, 90.4 |
| |
| 8)NOTE: PLEASE SEE 620.23 AND 620.24 |
| WHICH REQUIRES EQUIPMENT ROOMS/ARES TO |
| HAVE A DEDICATED BRANCH CIRCUIT FOR |
| RECEPTS AND LIGHTING. PLEASE KNOW, PER |
| MEETING WITH OWNERS AND DESIGN TEAM, |
| THIS ALSO INCLUDES ALL EQUIPMENT LOCATED |
| A-TOP HOISTWAY. |
| A RECEPT IN ELEVATOR EQUIPMENT CLOSET IS |
| SHOWN ON PLANS. |
| |
| 9)NOTE: PLEASE SEE FIRE REVIEW FOR EXACT |
| LOCATIONS OF ANY "KNOX BOX" LOCATION(S) |
| WHICH MAY BE REQUIRED. ONE OR MORE |
| LOCATIONS SHALL BE PLACED/NOTED ON |
| PLANS. |
| |
| 10)NOTE: PLEASE SHOW ALL ROOM/AREA |
| DESIGNATIONS ON PLANS. PLEASE SEE THIS |
| COMMENTS IS MAINLY FOR SOME COMMON AREAS |
| MISSING DESIGNATIONS. |
| |
| 11)NOTE: : PLEASE SEE 210.63 FOR |
| REQUIMENTS OF GFI RECEPTS FOR ALL A/C |
| EQUIPMENT. PLEASE SEE THESE COULD NOT BE |
| LOCATED ON ROOF PLANS ETC. |
| |
| 12)NOTE: PLEASE SEE ELEVATOR RMS, |
| LAYOUTS ON E-09AND E-12, DOOR/OPEINGS |
| FOR EQUIPMENT DO NOT SEEM TO CORRELATE. |
| |
| 13)NOTE: PLEASE KNOW IT WAS MENTIONED IN |
| MEETING THE "CAFE" WOULD BE A "SHELL" |
| AREA ONLY, HOEVER PLEASE SEE PLANS SHOW |
| ALL ELECTRICAL DEVICES BEING INSALLED? |
| PLEASE SEE RISER SHOWS CONDUIT FOR |
| "FUTURE" RESTAURANT. IS THIS THE SAME ? |
| PLEASE CLARIFY. |
| |
| 14)NOTE: PLEASE SEE SOME AREAS OF PLANS |
| FOR COMMON AREA LIGHTING ETC WHICH ARE |
| NOT "LEGALLY REQUIRED" SEEM TO BE ON THE |
| EM LEGALLY REQUIRED STAND-BY POWER |
| SYSTEM. |
| PLEASE SEE THAT ANY "OPTIONAL STAND-BY" |
| LOADS NOT LEGALLY REQUIRED MUST BE FED |
| FROM A DIFFERENT TRANSFER SWITCH AND EM |
| DISTRABUTION SYSTEM. PLEASE SEE 700.6D |
| |
| 15)NOTE: PLEASE SEE AS PER MEETING WITH |
| OWNERS REP/DESIGN TEAM, DRYER BOOSTER |
| FANS SHALL NOT BE USED, HOWEVER THESE |
| ARE STILL BEING SHOWN? |
| PLEASE CORRELATE AND PLEASE SEE |
| MECHANICAL REVIEW COMMENTS. |
| |
| 16)NOTE: PLEASE SEE 210.52C2 AND 4 WITH |
| REGARDS TO "SEPARATE" COUNTERSPACES FOR |
| ISLANDS. PLEASE VERFIY SIZE OF COOKTOP |
| AND A SAFE COUNTERSPACE FOR NTO |
| EXTENDING CORDS NEAR HEAT SOURCES ETC. |
| PLEASE SEE GFI RECEPTS AS SHOWN ON |
| ISLANDS AT THIS TIME, APPEAR TO MEET |
| CODE,PLEASE SEE THIS IS ONLY A NOTE FOR |
| SIZING ETC TO BE VERIFIED. |
| PLEASE SEE IF IF UNIT IS LARGER THAN IS |
| SHOWN, A SEPARATE GFI AT OTHER END WILL |
| BE REQUIRED. |
| PLEASE BE SURE ALL ISLANDS SHOW A RECEPT |
| AS REQUIED. PLEASE SEE REDLINED SETS FOR |
| ANY MISSING. |
| |
| 17)NOTE: PLEASE SEE SOME MISSING GFI |
| COUNTERSPACE RECEPTS AS REQUIRED ALONG |
| WALL/COUNTERSPACE. 210.52C1 |
| PLEASE SEE REDLINED SETS FOR LOCATIONS |
| IN SOME UNITS. |
| "B",DMOD, C, S. |
| |
| 18)NOTE: PLEASE SEE SOME UNITS MISSING |
| RECEPTS PER 210.52. |
| PLEASE SEE REDLINED SET. |
| |
| 19)NOTE: PLEASE SEE CIRCUITING MISSING |
| FROM SOME DEVICES SHOWN IN SOME OF THE |
| UNITS. PLEASE SEE GFI'S IN SOME BATHS. |
| PLEASE SEE REDLINED PLANS AS MOST ARE |
| CIRCIRLED. PLEASE SEE UNITS, G NORTH, L |
| NORTH, E, F D NORTH MOD ETC. |
| |
| 20)NOTE: PLEASE SEE UNIT "B" SOUTH WHICH |
| DOES NOT APPEAR TO SHOW ANY DINING RM/ |
| AREA ON PLANS. PLEASE SEE POSSIBLE ARE |
| SHOWN AS MEDIA/DEN? |
| PLEASE VERIFY AS DINING RM/AREA AND THE |
| LIKE SHALL BE FED FROM ONE OR MORE OF |
| THE REQUIRED SMALL APPLIANCE CIRCUITS. |
| 210.52B1, 210.11C1 20A AND #12. |
| |
| 21)NOTE: PLEASE SEE "D" NORTH WHICH |
| SHOWS ISLAND RECEPT ON CIRCUIT #6, |
| HOWEVER 6/8 IS SHOWN ON PANEL SCHEDULE |
| AS OVEN. PLEASE ADJUST. |
| |
| 22)NOTE: PLEASE SEE "L" SOUTH WHICH |
| SHOWS "FRIG" ON SM APPLIANCE CIRCUIT #8, |
| HOWEVER FRIG IS LISTED AS #4 ON PANEL |
| SCHEDULE. FRIG CIRCUIT NOT SHOWN ON |
| PLANS. PLEASE ADJUST. |
| |
| 23)NOTE: PLEASE SEE SOME BATH(S) ARE |
| MISSING THE REQUIRED GFI RECEPT WITHIN |
| 3' OF LAV EDGE. PLEASE SEE "N", PLEASE |
| ALSO SEE PLANS FOR ANY OTHER REDLINED |
| LOCATIONS. |
| 210.52D,210.11C3 |
| |
| 24)NOTE: PLEASE SEE SEE SOME |
| "HYDRO-MASSAGE" CIRCUITS ARE NOTED ON |
| PANEL SCHEDULE(S), HOWEVER THESE |
| ELECTRICAL DEVICE LOCATIONS COULD NOT BE |
| LOCATED ON PLANS. PLEASE SEE "K" |
| NORTH,"H" NORTH AND ANY OTHER POSSIBLE |
| REDLINES. |
| |
| 25)NOTE: PLEASE SEE THAT ALL RECEPTS |
| SHOWN IN CLOSETS FOR LV TRNSFORMERS TO |
| BE "PLUGGED IN" SHALL BE LOCATED ATLEAST |
| 12" MIN FROM SHELVING. THESE MAY BE |
| LOCATED ABOVE DOOR WAYS. |
| PLEASE SEE PLUG-IN TYPE TRANSFORMERS |
| CREATE VERY HIGH TEMPS AND SOME IN THIS |
| JURISTICTION HAVE HEATED TO THE POINT OF |
| MELTING, AND CUSE OF FIRE IN CLOSETS AND |
| CLOSE PROIMITY TO COMBUSTIBLES. PLEASE |
| SEE THIS CREATES A LIFE-SAFETY SITUATION |
| AND ANY UNITS CONTAININGOCP, THERMAL |
| CUT-OUT DEVICES WILL BE REQUIRED TO BE |
| LOCATED AS ABOVE. 110.26,240.24D |
| |
| 26)NOTE: PLEASE SEE MISSING ISLAND |
| RECEPT(S) FOR ISLAND IN UNIT "P". |
| 210.52C2 |
| AS REDLINED. |
| |
| 27)NOTE: PLEASESEE UNIT "N" WHICH |
| APPEARS TO SHOW A FRIG #37, HOWEVER |
| PLEASE SEE POSSIBLE SPACING FOR KITCHEN |
| COUNTERSPACE DEPENDING ON FRIG SIZE AS |
| SHOWN. PLEASE SEE "P", 210.52C1 |
| LOCATIONS REDLINED. |
| |
| 28)NOTE: PLEASE SEE UNIT "P"SOUTH AND |
| "Q" NORTH. PLEASE SEEUNIT "P" WITH |
| LESS SQ FT SHOWS 3-HEAT-PUMPS SYSTEMS, |
| HOWEVER UNIT "Q" WITH MUCH MORE SQ FT |
| ONLY SHOWS 2-HEAT PUMP SYSTEMS. |
| PLEASE SEE THIS IS ONLY A COMMENT AND NO |
| ELECTRICAL CODE ISSUE EXISTS. |
| |
| 29)NOTE: PLEASE SEE COUNTERSPACES |
| LOCATED AT LAUNDRY RM IN "Q" NORTH, DO |
| NOT SHOW ANY COUNTERSPACE GFI RECEPTS. |
| PLEASE SHOW IF ANY ARE TO BE INSTALLED. |
| THIS IS ONLY A NOTE AS A MIN OF ONE |
| LAUNDRY CIRCUIT AS REQUIRED UNDER |
| 210.52C2,210.52F,220.16 |
| PLEASE SEE NO ADDITIONAL ARE REQUIRED AS |
| LONG AS ABOVE IS MET. |
| PLEASE SEE NEXT COMMENT. |
| |
| 30)NOTE: PLEASE SEE PLANS INDICATE MANY |
| OF THE UNITS PANEL SCHEDULES SHWOING TWO |
| SEPARATE CIRCUITS FOR WASHER AND DRYER. |
| PLEASE SEE MANY UNITS SHOW THIS |
| WASHER/DRYER AS ONE UNIT. PLEASE SEE |
| PREVIOUS COMMENT WITH RESPECT TO DESIGN |
| OF "DUCTLESS" DRYERS. ALSO VERIFY IF |
| LAUNDRY CIRCUIT REQUIRED IS THE SAME |
| CIRCUIT FEEDING COMBO UNIT?? |
| |
| 31)NOTE: PLEASE ALSO SEE ABOVE "Q" UNIT |
| APPEARS TO SHOW TWO PANELS, ONE WITH |
| FEED THRU LUGS? HOWEVER PANEL SCHEDULE |
| INDICATES ALL CIRCUITS IN ONE PANEL |
| SCHEDULE. |
| PLEASE SEE A MAX OF 42 OCP DEVICES ARE |
| PERMITTED IN SINGLE PANEL.408.15 |
| PLEASE INLCUDE PANEL SCHEDULE FOR |
| "FEED-THRU" PANEL. PLEASE ADJUST |
| CIRCUITING AS SHOWN ON PLANS. |
| |
| 32)NOTE: PLEASE SEE MISSING SMOKE |
| DETECTORS REQUIRED UNDER NFPA-72 |
| 8-1.4.1.6.2 , FBC ETC. |
| PLEASE SEE SD'S ARE REQUIRED INSIDE AND |
| OUTSIDE ALL SLEEPING RMS AND ON EACH |
| LEVELOF A MULTY LEVEL DWELLING. |
| PLEASE SEE SOME MISSING, DEN IN UNIT "R" |
| WILL BE REQUIRED TO AHVE A SD AS IT IS |
| SHOWN WITH AN ATTACHED BATH OR CLOSET |
| WHICH MAKES THIS AN ADAPTABLE SLEEPING |
| RM BY AHJ. PLEASE SEE MISSING SD "Q" |
| NORTH LEADING TO FLR ABOVE. |
| PLEASE SEE SD'S ARE REDLINED AT |
| LOCATIONS REQUIRED IN OTHER UNITS. |
| |
| 33)NOTE:PLEASE SEE "NOTE"FOR LV |
| SYSTEM(S)ON ALL ELECTRICAL SHEETS FOR |
| UNITS MENTIONS THE "GENERAL CONTRACTOR' |
| IS TO INSTALLED THIS LV IN HIS SCOPE OF |
| WORK? |
| PLEASE SEE FS 468 AND SCOPE WORK |
| PERMITTED. PLEASE ALSO SEE ECLB. |
| THIS APPEARS TO BE A MISPRINT.? |
| |
| 34)NOTE; PLEASE SEE BLDG/MECH/FIRE |
| REVIEW COMMENTS FOR EQUIPMENT SHOWN IN |
| ELEVATOR LOBBY'S. PLEASE ALSO SEE THESE |
| ELEVATOR LOBBY'S SHALL BE CONSIDERED |
| PART OF UNITS AS COMMON AREAS ARE NOT |
| PERMITTED TO CONTAIN CIRCUITS FROM |
| UNITS. PLEASE SEE 210.25 |
| |
| 35)NOTE: PLEASE SEE ALL SD'S ARE |
| REQUIRED TO BE WIRED "IN-LINE", PLEASE |
| SEE UNIT WLT3, WHICH SHOWS SD'S ON |
| CIRCUITS 12 AND 24. PLEASE ADJUST. |
| |
| 36)NOTE: PLEASE SEE 210.702C FOR LOFT |
| UNITS CONTAINING LANDINGS. PLEASE SEE |
| THESE UNITS INDICATE 6 OR MORE RISERS IN |
| BOTH DIRECTIONS, PLEASE SEE A 4-WAY SW |
| WILL BE REQUIRED AT LANDING LOCATION. |
| |
| 37)NOTE: PLEASE SEE ANY PROPOSED |
| LIGHTNING PROTECTION SYSTEM SHALL BE |
| INSTALLED AND ACCEPTABLE PER NFPA-780. |
| ALTHOUGH A LIGHTNING PROTECTION SYSTEM |
| IS NOT SHOWN ON ANY PLANS, PLEASE BE |
| SURE A NOTE IS PLACED ON "ROOF-TOP" |
| SHEET WITH REFERENCE TO NFPA-780. |
| AS NOTED IN MEETING , "LIGHTNING |
| PREVENTION" SYSTEMS ARE NOT PERMITTED OR |
| ACCEPTABLE IN THIS JURISTICTION. |
| |
| 38)NOTE: PLEASE SEE MAINS AS SHOWN RISER |
| WITHOUTDIRECT BUS-STAB INTO FPL VAULT |
| AND IF THERE ARE MORE THAN 8' OF |
| UNPROTECTED CONDUCTORS IN BLDG, THESE |
| CONDUITS AND SEC'S SHALL BE INCASED IN A |
| MIN OF 2" OF CONCRETE. PLEASE SEE 230.6, |
| 230.70 ALSO CITY OF WEST PALM BEACH |
| LOCAL AMENDMENTS. |
| |
| 39)NOTE: PLEASE SEE CALCUALTIONS FOR |
| BUS-DUCT #4, PLEASE INDICATE AS MAIN #4 |
| AS OTHERS ARE NOTED. |
| |
| 40)NOTE: PLEASE SEE HXDP WILL BE |
| REQUIRED TO HAVE A MCB. PLEASE SEE IF |
| ATS CONTAINS A MANUAL MEANS OF |
| DISCONNECT LOCATED ON OUTSIDE OF ATS AND |
| CAPABLE OF BEING LOCKED IN THE "OPEN" |
| POSITION, THEN A MCB IN HXDP. PLEASE SEE |
| IN EITHER CASE THE MEANS OF DISCONNECT |
| WILL BE REQUIRED TO BE IN CLOSE |
| PROXIMITY TO MAIN ELECTRICAL RM FOR |
| GROUPING OF MAINS. PLEASE SEE NEC DOES |
| MENTIONS EM MAIN TO BE LOCATED REMOTE, |
| HOWEVER A RESPONSE FROM NFPA MENTIONED |
| THIS CAN BE LOCATED AS CLOSE AS 10 FEET. |
| PLEASE SEE A CONCENSUS FROM ELECTRICAL |
| PLAN REVIEW, FIRE MARSH.'S OFFICE AND |
| CHIEF ELECTRICAL INSPECTOR RESULTS IN |
| NOT HAVING THE MAIN FROM THE SECONDARY |
| SIDE OF GENERATOR IN GENERATOR |
| ELECTRICAL ROOM. 230.72 |
| THIS LOCATION WITH A 1500KW GENERATOR |
| RUNNING AT FULL NOISE LEVEL, HEAT ETC |
| MAY DISTRACT IN SHUTTING DOWN OF EM |
| POWER IN A SAFE AND TIMELY FASHION. IT |
| IS NOTED THAT THESE MAINS AND GEN WILL |
| HAVE SHUNT TRIPS IN FIRE COMMAND RM, |
| HOWEVER THESE ARE NOT CONSIDERED AS THE |
| MEANS OF DISC. 230.76,230.79 |
| PLEASE SEE IT IS UNCLEAR AT THIS TIME IF |
| BRKR ON GEN IS LOCATED ON THE OUTSIDE OF |
| EQUIPMENT WITH A MANUAL MEANS OF |
| DISCONNECT WITH EXPOSING OF LIVE PARTS. |
| 110.27. |
| PLEASE SEE SOME OF THIS CAN NOT BE |
| VERIFIED AT THIS TIME AS SPECS FOR THIS |
| EQUIPMENT, GENERATOR ETC WAS NOT |
| SUBMITTED. |
| PLEASE SEE ROUTE, LOCATION TRAVEL |
| DISTANCE ETC MAY BE GONE IN A MEETING |
| WHICH MAY BE REQUESTED. |
| |
| 41)NOTE: PLEASE SEE MISSING LOAD |
| CALCULATIONS FOR MCVI, MCVII. |
| 215.5 |
| |
| 42)NOTE: PLEASE SHOW GROUNDING SYSTEM |
| FOR ALL TRANSFORMER. PLEASE INCLUDE |
| GROUNDING OF THESE TRANSFOMERS ON RISER |
| DIAGRAM IN NOTES/LINE DIAGRAM. |
| 250.30, 250.50 ETC. |
| |
| 43)NOTE: PLEASE INCLUDE ALL EQUIPMENT |
| GROUNDING CONDUCTORS FOR TRANSFOMERSON |
| PRIMARY SIDE. 250.110,250.30 SIZED |
| 250.122. |
| |
| 44)NOTE: PLEASE INDICATE OCP AT |
| GENERATOR. PLEASE ALSO SEE 445.13 FOR |
| SIZING OF CONDUCTORS. THIS CAN NOT BE |
| VERIFIED AT THIS TIME. |
| |
| 45)NOTE: PLEASE SEE EM MAIN INDICATES |
| GFCI PROTECTION. PLEASE SEE GFCI IS |
| PERSONNEL PROTECTION AND 277/480V OVER |
| 1000A'S 230.95,240.13. PLEASE SEE THESE |
| AS GFP, GROUND FULT PROTECTION IS NOT |
| THE SAME. |
| |
| 46)NOTE: PLEASE SEE 240.13, IF SYSTEM IS |
| GROUND FAULT PROTECTD, THE ATS WILL BE |
| REQUIRED TO BE 4-POLE AND GENERATOR WILL |
| BE REQUIRED TO BE A SEPARATELY DERIVED |
| SYSTEM. |
| PLEASE SEE GROUNDING FOR ANY SEPARATELY |
| DERIVED SYSTEMS SHALL BE SHOWN. |
| 250.50 ETC |
| |
| 47)NOTE: PLEASE CORRELATE FEEDERS FOR |
| LXRA ON RISER WITH PANEL SCHEDULE. |
| |
| 48)NOTE: PLEASE SEE PANELS LPA, LPB WITH |
| X'S FOR LOADS, INFORMATION ETC??? |
| PLEASE COMPLETE PANELS.215.5 |
| |
| 49)NOTE:PLEASE SEE SOME PANELS ARE SHOWN |
| AS POSSIBLE "FEED-THRU" PANELS WITH MORE |
| THAN THE PERMITTED 42 CIRCUITS 408.15, |
| HOWEVER RISER DOES NOTE CORRELATE, ONLY |
| SHOWS THE INDIVIDUAL PANEL. |
| 215.5 PLEASE CORRELATE. |
| |
| 50)NOTE: PLEASE SEE PANEL SCHEDULES |
| SHOWS "TYPICAL" PANELS FOR TRA, TRB , |
| TRC ETC ETC, HOWEVER THESE COULD NTO BE |
| LOCATED ON RISER DIAGRAM? |
| 215.5 |
| |
| 51)NOTE: PLEASE SEE HP ON RISER IS SHOWN |
| FEEDING LP, HOWEVER PLEASE SEE HP PANEL |
| SCHEDULE WHICH DOES NOT INDICATE ANY |
| FEEDS TO LP? 215.5 PLEASE CORRELATE. |
| |
| 52)NOTE:PLEASE SEE HG AS DOUBLE/FEED |
| THRU PANEL, HOWEVER RISER INDICATES |
| SINGLE PANEL. PLEASE SEE OTHER POSSIBLE |
| PANELS, HB, LB AND PREVIOUS NOTE. #49 |
| |
| 53)NOTE: PLEASE SEE PANEL TF IS FED FROM |
| LG AND LXG? PLEASE CORRELATE 215.5 |
| |
| 54)NOTE: PLEASE SEEA 600A MAIN FOR |
| FUTURE REST. IS SHOWN, HOWEVER NO |
| INFORMATION FOR VOLTAGE ETC WAS |
| SUBMITTED. PLEASE SEE PREVIOUS COMMENT |
| WITH RESPECT TO "CAFE".?? |
| 215.5 |
| |
| 55)NOTE: PLEASE SEE NO PANEL SCHEDULE |
| WAS SUBMITTED FOR PANEL HRA AT ROOF |
| LEVEL?? |
| 215. |
| |
| 56)NOTE: PLEASE SEE NO PANEL SCHEDULES |
| WERE SUBMITTED FOR PANELS , HS, LS, HXS, |
| LXS,,,?? |
| 215.5 |
| |
| 57)NOTE: PLEASE SEE HXG WHICH SHOWS FEED |
| TO LX6, MISPRINT? FOR LXG? |
| 215.5 |
| |
| 58)NOTE: PLEASE SEE "ELB" WHICH |
| INDICATES FEED TO LXRB ON RISER AND |
| PANEL SCHEDULE INDICATES LXRA. |
| PLEASE CORRELATE: 215.5 |
| |
| 59)NOTE: PLEASE SEE ELB FEEDS "HXRB" ON |
| RISER , HOWEVER SHOWS "HXRA" ON PANEL |
| SCHEDULE. PLEASE CORRELATE. 215.5 |
| |
| 60)NOTE: PLEASE SEE HXB FEEDS LXB ON |
| RISER , HOWEVER THIS IS LXA ON PANEL |
| SCHEDULE.215.5 |
| |
| 61)NOTE:PLEASE VERIFY2000A OCP AS |
| NOTED FOR GENERATOR , HOWEVER LOAD SHOWN |
| ON HXDP INDICATES LOADS ABOVE 2000A'S. |
| PLEASE SEE MAIN AND ATS IS INDICATED AS |
| 2500AS'. PLEASE CORRELATE. 215.5 |
| PLEASE SEE GEN AND OCP SHALL BE SIZED |
| FOR LOAD SERVED. |
| |
| 62)NOTE: PLEASE SEE MOST OF THE ABOVE |
| ITEMS ARE REDLINED ON ONE SET OF |
| ELECTRICAL PLANS, HOWEVER THESE DO NOT |
| IDICATE ALL POSSIBLE LOCATIONS OF NEEDED |
| CORRECTIONS. |
| |
| 63)NOTE: PLEASE SEE MUCH INFORMATION NOT |
| SHOWN (PANEL SCHEDULES), (SPECS) ETC CAN |
| NOT BE VERIFIED OR REVIEWED AT THIS |
| TIME. PLEASE SUBMIT ALL INFOMATION. |
| |
| 64)NOTE: PLEASE SEE POOL WILL BE |
| REQUIRED TO BE UNDER SEPARATE PERMIT. |
| PLEASE PLACE NOTE ON PLANS. |
| IF NIGHT-TIME/AFTER DUSK WILL BE |
| PROPOSED, SIGNED, SEALED PHOTOMETRICS |
| WILL BE REQUIRED TO BE SUBMITTED TO PALM |
| BEACH COUNTY HEALTH DEPT FOR REVIEW AND |
| STAMPING. |
| THIS WILL BE REQUIRED WITH POOL PERMIT. |
| |
| PLEASE SEE ANY POSSIBLE COMMENTS FROM |
| OTHER REVIEWER(S) WHICH MAY HAVE A |
| DIRECT EFFECT ON ELECTRICAL PLANS. |
| |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE AREA ANY QUESTIONS, |
| PLEASE DO NOT HESIATE IN CONTACTING THIS |
| OFFICE. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |
| |
| |
2005-08-19 00:00:00 | PLANS STILL IN ELEC FOR REVIEW. |
| UNITS, COMMON AREAS COMPLETED. |
| SERVICE STILL NEEDS TO BE REVIEWED. |
| REVIEW TO CONTINUE 8/22 |
| NOTES TO FOLLOW. |
2005-08-18 00:00:00 | 1-SET OF SPEC BOOKS AND 1-SET OF MEP'S |
| IN ELECTRIC FOR REVIEW. |
| NOTES TO FOLLOW. |