2005-08-23 00:00:00*********** UNSAT ***************
  
 PALLADIO
 2211 N. FLAGLER DR.
 PLANS SUBMITTED AND UNDER "PLAN REVIEW"
 ONLY. BROUGHT IN FOR PERMIT,HOWEVER PLAN
 REVIEW DONE UNDER PLAN REVIEW.
  
 1)NOTE: PLEASE SUBMIT ALL MANUFACTURE
 SPECIFICATION SHEETS/ CUT SHEETS FOR
 FIRE PUMP(DIESEL) FIRE PUMP CONTROLLER,
 GENERATOR, AUTOMATIC TRANSFER SWITCH
 (ATS) AND ANY SUB BASE FUEL TANKS.
 PLEASE SURE ALL INFORMATION SUBMITTED
 MUST SHOW LISTINGS FROM A NATIONALLY
 RECOGNIZED TESTING LAB. (NRTL).
 PLEASE BE SURE ALL FIRE PUMP CONTROLLERS
 ETC COMPLY WITH NFPA-20 AND OTHER
 APPLICABLE CODES.
  
 2)NOTE: PLEASE SEE SPEC BOOKS SUBMITTED
 ARE NOTED AS ELECTRICAL MECHANICAL SPECS
 BY OTHERS?
 PLEASE BE SURE THESE ARETO BE
 SUBMITTED AT THIS TIME.
  
 3)NOTE: PLEASE SEE MAIN ELECTRICAL RM
 LOCATED ON E-PH-1 WHICH SHOWS DOORS WITH
 AN "IN-SWING", PLEASE SEE DOORS ARE
 REQUIRED TO SWING OUT AND SHALL CONTAIN
 OR "PANIC " HARDWARE AS LISTED IN 110.26
 PLEASE NOTE: PANIC HARDWARE REQUIREMENTS
 ON ELECTRICAL PLANS.
 PLEASE SEE FIRE PUMP ROOM WILL BE
 REQUIRED TO HAVE DIRECT ACCES TO
 CORRIDOR WITHOUT TRAVEL THROUGH A
 "STORAGE ROOM".
 PLEASE SEE FIRE REVIEW COMMENTS ALSO.
  
 4)NOTE: PLEASE SEE MISSING REQUIRED GFI
 RECEPT(S) TO BE LOCATED WITH/IN 20' OF
 POOL(S).PLEASE SEE 680.22
  
 5)NOTE: PLEASE SEE MIN CLEARENCES
 REQUIRED FOR LANDSCAPE LIGHTING FIXTURES
 PER 680.22(B)1 5' MIN FOR HV AND GFCI
 PROTECTION REQUIRED. PLEASE ALSO SEE
 411.4 FOR LV TYPE FIXTURES AND MIN OF
 10' FROM WATER'S EDGE.
  
 6)NOTE: PLEASE SEE ALTERNATING
 CIRCUITING FOR EMERGENCY EGRESS LIGHTING
 REQUIRED IN HALLWAYS/CORRIDORS, EGRESS
 STAIRWAYS AND ("EGRESS TUNNELS").
 PLEASE SEE NFPA-101 7-9, WHICH REQUIRES
 NOT TO LEAVE ANY EGRESS PATH IN TOTAL
 DARKNESS UPON THE SWITCHING/TRIPPING OF
 A SINGLE BREAKER. PLEASE SEE BATTERY
 BACK UP TYPE OF FIXTURES WOULD NOT
 REQUIRE ALTERNATING EM CIRUITS FOR
 EGRESS LIGHTING.
  
 7)NOTE: PLEASE SEE ALL MAIN ELECTRICAL
 ROOMS, GEN RM, FIRE PUMP RM AND ELEVATOR
 EQUIPMENT ROOMS/EQUIPMENT BOILER RM
 SHALL A BATTERY BACK UP TYPE OF LIGHTING
 FIXTURE.
 700.16, LS 101 7-9, 90.4
  
 8)NOTE: PLEASE SEE 620.23 AND 620.24
 WHICH REQUIRES EQUIPMENT ROOMS/ARES TO
 HAVE A DEDICATED BRANCH CIRCUIT FOR
 RECEPTS AND LIGHTING. PLEASE KNOW, PER
 MEETING WITH OWNERS AND DESIGN TEAM,
 THIS ALSO INCLUDES ALL EQUIPMENT LOCATED
 A-TOP HOISTWAY.
 A RECEPT IN ELEVATOR EQUIPMENT CLOSET IS
 SHOWN ON PLANS.
  
 9)NOTE: PLEASE SEE FIRE REVIEW FOR EXACT
 LOCATIONS OF ANY "KNOX BOX" LOCATION(S)
 WHICH MAY BE REQUIRED. ONE OR MORE
 LOCATIONS SHALL BE PLACED/NOTED ON
 PLANS.
  
 10)NOTE: PLEASE SHOW ALL ROOM/AREA
 DESIGNATIONS ON PLANS. PLEASE SEE THIS
 COMMENTS IS MAINLY FOR SOME COMMON AREAS
 MISSING DESIGNATIONS.
  
 11)NOTE: : PLEASE SEE 210.63 FOR
 REQUIMENTS OF GFI RECEPTS FOR ALL A/C
 EQUIPMENT. PLEASE SEE THESE COULD NOT BE
 LOCATED ON ROOF PLANS ETC.
  
 12)NOTE: PLEASE SEE ELEVATOR RMS,
 LAYOUTS ON E-09AND E-12, DOOR/OPEINGS
 FOR EQUIPMENT DO NOT SEEM TO CORRELATE.
  
 13)NOTE: PLEASE KNOW IT WAS MENTIONED IN
 MEETING THE "CAFE" WOULD BE A "SHELL"
 AREA ONLY, HOEVER PLEASE SEE PLANS SHOW
 ALL ELECTRICAL DEVICES BEING INSALLED?
 PLEASE SEE RISER SHOWS CONDUIT FOR
 "FUTURE" RESTAURANT. IS THIS THE SAME ?
 PLEASE CLARIFY.
  
 14)NOTE: PLEASE SEE SOME AREAS OF PLANS
 FOR COMMON AREA LIGHTING ETC WHICH ARE
 NOT "LEGALLY REQUIRED" SEEM TO BE ON THE
 EM LEGALLY REQUIRED STAND-BY POWER
 SYSTEM.
 PLEASE SEE THAT ANY "OPTIONAL STAND-BY"
 LOADS NOT LEGALLY REQUIRED MUST BE FED
 FROM A DIFFERENT TRANSFER SWITCH AND EM
 DISTRABUTION SYSTEM. PLEASE SEE 700.6D
  
 15)NOTE: PLEASE SEE AS PER MEETING WITH
 OWNERS REP/DESIGN TEAM, DRYER BOOSTER
 FANS SHALL NOT BE USED, HOWEVER THESE
 ARE STILL BEING SHOWN?
 PLEASE CORRELATE AND PLEASE SEE
 MECHANICAL REVIEW COMMENTS.
  
 16)NOTE: PLEASE SEE 210.52C2 AND 4 WITH
 REGARDS TO "SEPARATE" COUNTERSPACES FOR
 ISLANDS. PLEASE VERFIY SIZE OF COOKTOP
 AND A SAFE COUNTERSPACE FOR NTO
 EXTENDING CORDS NEAR HEAT SOURCES ETC.
 PLEASE SEE GFI RECEPTS AS SHOWN ON
 ISLANDS AT THIS TIME, APPEAR TO MEET
 CODE,PLEASE SEE THIS IS ONLY A NOTE FOR
 SIZING ETC TO BE VERIFIED.
 PLEASE SEE IF IF UNIT IS LARGER THAN IS
 SHOWN, A SEPARATE GFI AT OTHER END WILL
 BE REQUIRED.
 PLEASE BE SURE ALL ISLANDS SHOW A RECEPT
 AS REQUIED. PLEASE SEE REDLINED SETS FOR
 ANY MISSING.
  
 17)NOTE: PLEASE SEE SOME MISSING GFI
 COUNTERSPACE RECEPTS AS REQUIRED ALONG
 WALL/COUNTERSPACE. 210.52C1
 PLEASE SEE REDLINED SETS FOR LOCATIONS
 IN SOME UNITS.
 "B",DMOD, C, S.
  
 18)NOTE: PLEASE SEE SOME UNITS MISSING
 RECEPTS PER 210.52.
 PLEASE SEE REDLINED SET.
  
 19)NOTE: PLEASE SEE CIRCUITING MISSING
 FROM SOME DEVICES SHOWN IN SOME OF THE
 UNITS. PLEASE SEE GFI'S IN SOME BATHS.
 PLEASE SEE REDLINED PLANS AS MOST ARE
 CIRCIRLED. PLEASE SEE UNITS, G NORTH, L
 NORTH, E, F D NORTH MOD ETC.
  
 20)NOTE: PLEASE SEE UNIT "B" SOUTH WHICH
 DOES NOT APPEAR TO SHOW ANY DINING RM/
 AREA ON PLANS. PLEASE SEE POSSIBLE ARE
 SHOWN AS MEDIA/DEN?
 PLEASE VERIFY AS DINING RM/AREA AND THE
 LIKE SHALL BE FED FROM ONE OR MORE OF
 THE REQUIRED SMALL APPLIANCE CIRCUITS.
 210.52B1, 210.11C1 20A AND #12.
  
 21)NOTE: PLEASE SEE "D" NORTH WHICH
 SHOWS ISLAND RECEPT ON CIRCUIT #6,
 HOWEVER 6/8 IS SHOWN ON PANEL SCHEDULE
 AS OVEN. PLEASE ADJUST.
  
 22)NOTE: PLEASE SEE "L" SOUTH WHICH
 SHOWS "FRIG" ON SM APPLIANCE CIRCUIT #8,
 HOWEVER FRIG IS LISTED AS #4 ON PANEL
 SCHEDULE. FRIG CIRCUIT NOT SHOWN ON
 PLANS. PLEASE ADJUST.
  
 23)NOTE: PLEASE SEE SOME BATH(S) ARE
 MISSING THE REQUIRED GFI RECEPT WITHIN
 3' OF LAV EDGE. PLEASE SEE "N", PLEASE
 ALSO SEE PLANS FOR ANY OTHER REDLINED
 LOCATIONS.
 210.52D,210.11C3
  
 24)NOTE: PLEASE SEE SEE SOME
 "HYDRO-MASSAGE" CIRCUITS ARE NOTED ON
 PANEL SCHEDULE(S), HOWEVER THESE
 ELECTRICAL DEVICE LOCATIONS COULD NOT BE
 LOCATED ON PLANS. PLEASE SEE "K"
 NORTH,"H" NORTH AND ANY OTHER POSSIBLE
 REDLINES.
  
 25)NOTE: PLEASE SEE THAT ALL RECEPTS
 SHOWN IN CLOSETS FOR LV TRNSFORMERS TO
 BE "PLUGGED IN" SHALL BE LOCATED ATLEAST
 12" MIN FROM SHELVING. THESE MAY BE
 LOCATED ABOVE DOOR WAYS.
 PLEASE SEE PLUG-IN TYPE TRANSFORMERS
 CREATE VERY HIGH TEMPS AND SOME IN THIS
 JURISTICTION HAVE HEATED TO THE POINT OF
 MELTING, AND CUSE OF FIRE IN CLOSETS AND
 CLOSE PROIMITY TO COMBUSTIBLES. PLEASE
 SEE THIS CREATES A LIFE-SAFETY SITUATION
 AND ANY UNITS CONTAININGOCP, THERMAL
 CUT-OUT DEVICES WILL BE REQUIRED TO BE
 LOCATED AS ABOVE. 110.26,240.24D
  
 26)NOTE: PLEASE SEE MISSING ISLAND
 RECEPT(S) FOR ISLAND IN UNIT "P".
 210.52C2
 AS REDLINED.
  
 27)NOTE: PLEASESEE UNIT "N" WHICH
 APPEARS TO SHOW A FRIG #37, HOWEVER
 PLEASE SEE POSSIBLE SPACING FOR KITCHEN
 COUNTERSPACE DEPENDING ON FRIG SIZE AS
 SHOWN. PLEASE SEE "P", 210.52C1
 LOCATIONS REDLINED.
  
 28)NOTE: PLEASE SEE UNIT "P"SOUTH AND
 "Q" NORTH. PLEASE SEEUNIT "P" WITH
 LESS SQ FT SHOWS 3-HEAT-PUMPS SYSTEMS,
 HOWEVER UNIT "Q" WITH MUCH MORE SQ FT
 ONLY SHOWS 2-HEAT PUMP SYSTEMS.
 PLEASE SEE THIS IS ONLY A COMMENT AND NO
 ELECTRICAL CODE ISSUE EXISTS.
  
 29)NOTE: PLEASE SEE COUNTERSPACES
 LOCATED AT LAUNDRY RM IN "Q" NORTH, DO
 NOT SHOW ANY COUNTERSPACE GFI RECEPTS.
 PLEASE SHOW IF ANY ARE TO BE INSTALLED.
 THIS IS ONLY A NOTE AS A MIN OF ONE
 LAUNDRY CIRCUIT AS REQUIRED UNDER
 210.52C2,210.52F,220.16
 PLEASE SEE NO ADDITIONAL ARE REQUIRED AS
 LONG AS ABOVE IS MET.
 PLEASE SEE NEXT COMMENT.
  
 30)NOTE: PLEASE SEE PLANS INDICATE MANY
 OF THE UNITS PANEL SCHEDULES SHWOING TWO
 SEPARATE CIRCUITS FOR WASHER AND DRYER.
 PLEASE SEE MANY UNITS SHOW THIS
 WASHER/DRYER AS ONE UNIT. PLEASE SEE
 PREVIOUS COMMENT WITH RESPECT TO DESIGN
 OF "DUCTLESS" DRYERS. ALSO VERIFY IF
 LAUNDRY CIRCUIT REQUIRED IS THE SAME
 CIRCUIT FEEDING COMBO UNIT??
  
 31)NOTE: PLEASE ALSO SEE ABOVE "Q" UNIT
 APPEARS TO SHOW TWO PANELS, ONE WITH
 FEED THRU LUGS? HOWEVER PANEL SCHEDULE
 INDICATES ALL CIRCUITS IN ONE PANEL
 SCHEDULE.
 PLEASE SEE A MAX OF 42 OCP DEVICES ARE
 PERMITTED IN SINGLE PANEL.408.15
 PLEASE INLCUDE PANEL SCHEDULE FOR
 "FEED-THRU" PANEL. PLEASE ADJUST
 CIRCUITING AS SHOWN ON PLANS.
  
 32)NOTE: PLEASE SEE MISSING SMOKE
 DETECTORS REQUIRED UNDER NFPA-72
 8-1.4.1.6.2 , FBC ETC.
 PLEASE SEE SD'S ARE REQUIRED INSIDE AND
 OUTSIDE ALL SLEEPING RMS AND ON EACH
 LEVELOF A MULTY LEVEL DWELLING.
 PLEASE SEE SOME MISSING, DEN IN UNIT "R"
 WILL BE REQUIRED TO AHVE A SD AS IT IS
 SHOWN WITH AN ATTACHED BATH OR CLOSET
 WHICH MAKES THIS AN ADAPTABLE SLEEPING
 RM BY AHJ. PLEASE SEE MISSING SD "Q"
 NORTH LEADING TO FLR ABOVE.
 PLEASE SEE SD'S ARE REDLINED AT
 LOCATIONS REQUIRED IN OTHER UNITS.
  
 33)NOTE:PLEASE SEE "NOTE"FOR LV
 SYSTEM(S)ON ALL ELECTRICAL SHEETS FOR
 UNITS MENTIONS THE "GENERAL CONTRACTOR'
 IS TO INSTALLED THIS LV IN HIS SCOPE OF
 WORK?
 PLEASE SEE FS 468 AND SCOPE WORK
 PERMITTED. PLEASE ALSO SEE ECLB.
 THIS APPEARS TO BE A MISPRINT.?
  
 34)NOTE; PLEASE SEE BLDG/MECH/FIRE
 REVIEW COMMENTS FOR EQUIPMENT SHOWN IN
 ELEVATOR LOBBY'S. PLEASE ALSO SEE THESE
 ELEVATOR LOBBY'S SHALL BE CONSIDERED
 PART OF UNITS AS COMMON AREAS ARE NOT
 PERMITTED TO CONTAIN CIRCUITS FROM
 UNITS. PLEASE SEE 210.25
  
 35)NOTE: PLEASE SEE ALL SD'S ARE
 REQUIRED TO BE WIRED "IN-LINE", PLEASE
 SEE UNIT WLT3, WHICH SHOWS SD'S ON
 CIRCUITS 12 AND 24. PLEASE ADJUST.
  
 36)NOTE: PLEASE SEE 210.702C FOR LOFT
 UNITS CONTAINING LANDINGS. PLEASE SEE
 THESE UNITS INDICATE 6 OR MORE RISERS IN
 BOTH DIRECTIONS, PLEASE SEE A 4-WAY SW
 WILL BE REQUIRED AT LANDING LOCATION.
  
 37)NOTE: PLEASE SEE ANY PROPOSED
 LIGHTNING PROTECTION SYSTEM SHALL BE
 INSTALLED AND ACCEPTABLE PER NFPA-780.
 ALTHOUGH A LIGHTNING PROTECTION SYSTEM
 IS NOT SHOWN ON ANY PLANS, PLEASE BE
 SURE A NOTE IS PLACED ON "ROOF-TOP"
 SHEET WITH REFERENCE TO NFPA-780.
 AS NOTED IN MEETING , "LIGHTNING
 PREVENTION" SYSTEMS ARE NOT PERMITTED OR
 ACCEPTABLE IN THIS JURISTICTION.
  
 38)NOTE: PLEASE SEE MAINS AS SHOWN RISER
 WITHOUTDIRECT BUS-STAB INTO FPL VAULT
 AND IF THERE ARE MORE THAN 8' OF
 UNPROTECTED CONDUCTORS IN BLDG, THESE
 CONDUITS AND SEC'S SHALL BE INCASED IN A
 MIN OF 2" OF CONCRETE. PLEASE SEE 230.6,
 230.70 ALSO CITY OF WEST PALM BEACH
 LOCAL AMENDMENTS.
  
 39)NOTE: PLEASE SEE CALCUALTIONS FOR
 BUS-DUCT #4, PLEASE INDICATE AS MAIN #4
 AS OTHERS ARE NOTED.
  
 40)NOTE: PLEASE SEE HXDP WILL BE
 REQUIRED TO HAVE A MCB. PLEASE SEE IF
 ATS CONTAINS A MANUAL MEANS OF
 DISCONNECT LOCATED ON OUTSIDE OF ATS AND
 CAPABLE OF BEING LOCKED IN THE "OPEN"
 POSITION, THEN A MCB IN HXDP. PLEASE SEE
 IN EITHER CASE THE MEANS OF DISCONNECT
 WILL BE REQUIRED TO BE IN CLOSE
 PROXIMITY TO MAIN ELECTRICAL RM FOR
 GROUPING OF MAINS. PLEASE SEE NEC DOES
 MENTIONS EM MAIN TO BE LOCATED REMOTE,
 HOWEVER A RESPONSE FROM NFPA MENTIONED
 THIS CAN BE LOCATED AS CLOSE AS 10 FEET.
 PLEASE SEE A CONCENSUS FROM ELECTRICAL
 PLAN REVIEW, FIRE MARSH.'S OFFICE AND
 CHIEF ELECTRICAL INSPECTOR RESULTS IN
 NOT HAVING THE MAIN FROM THE SECONDARY
 SIDE OF GENERATOR IN GENERATOR
 ELECTRICAL ROOM. 230.72
 THIS LOCATION WITH A 1500KW GENERATOR
 RUNNING AT FULL NOISE LEVEL, HEAT ETC
 MAY DISTRACT IN SHUTTING DOWN OF EM
 POWER IN A SAFE AND TIMELY FASHION. IT
 IS NOTED THAT THESE MAINS AND GEN WILL
 HAVE SHUNT TRIPS IN FIRE COMMAND RM,
 HOWEVER THESE ARE NOT CONSIDERED AS THE
 MEANS OF DISC. 230.76,230.79
 PLEASE SEE IT IS UNCLEAR AT THIS TIME IF
 BRKR ON GEN IS LOCATED ON THE OUTSIDE OF
 EQUIPMENT WITH A MANUAL MEANS OF
 DISCONNECT WITH EXPOSING OF LIVE PARTS.
 110.27.
 PLEASE SEE SOME OF THIS CAN NOT BE
 VERIFIED AT THIS TIME AS SPECS FOR THIS
 EQUIPMENT, GENERATOR ETC WAS NOT
 SUBMITTED.
 PLEASE SEE ROUTE, LOCATION TRAVEL
 DISTANCE ETC MAY BE GONE IN A MEETING
 WHICH MAY BE REQUESTED.
  
 41)NOTE: PLEASE SEE MISSING LOAD
 CALCULATIONS FOR MCVI, MCVII.
 215.5
  
 42)NOTE: PLEASE SHOW GROUNDING SYSTEM
 FOR ALL TRANSFORMER. PLEASE INCLUDE
 GROUNDING OF THESE TRANSFOMERS ON RISER
 DIAGRAM IN NOTES/LINE DIAGRAM.
 250.30, 250.50 ETC.
  
 43)NOTE: PLEASE INCLUDE ALL EQUIPMENT
 GROUNDING CONDUCTORS FOR TRANSFOMERSON
 PRIMARY SIDE. 250.110,250.30 SIZED
 250.122.
  
 44)NOTE: PLEASE INDICATE OCP AT
 GENERATOR. PLEASE ALSO SEE 445.13 FOR
 SIZING OF CONDUCTORS. THIS CAN NOT BE
 VERIFIED AT THIS TIME.
  
 45)NOTE: PLEASE SEE EM MAIN INDICATES
 GFCI PROTECTION. PLEASE SEE GFCI IS
 PERSONNEL PROTECTION AND 277/480V OVER
 1000A'S 230.95,240.13. PLEASE SEE THESE
 AS GFP, GROUND FULT PROTECTION IS NOT
 THE SAME.
  
 46)NOTE: PLEASE SEE 240.13, IF SYSTEM IS
 GROUND FAULT PROTECTD, THE ATS WILL BE
 REQUIRED TO BE 4-POLE AND GENERATOR WILL
 BE REQUIRED TO BE A SEPARATELY DERIVED
 SYSTEM.
 PLEASE SEE GROUNDING FOR ANY SEPARATELY
 DERIVED SYSTEMS SHALL BE SHOWN.
 250.50 ETC
  
 47)NOTE: PLEASE CORRELATE FEEDERS FOR
 LXRA ON RISER WITH PANEL SCHEDULE.
  
 48)NOTE: PLEASE SEE PANELS LPA, LPB WITH
 X'S FOR LOADS, INFORMATION ETC???
 PLEASE COMPLETE PANELS.215.5
  
 49)NOTE:PLEASE SEE SOME PANELS ARE SHOWN
 AS POSSIBLE "FEED-THRU" PANELS WITH MORE
 THAN THE PERMITTED 42 CIRCUITS 408.15,
 HOWEVER RISER DOES NOTE CORRELATE, ONLY
 SHOWS THE INDIVIDUAL PANEL.
 215.5 PLEASE CORRELATE.
  
 50)NOTE: PLEASE SEE PANEL SCHEDULES
 SHOWS "TYPICAL" PANELS FOR TRA, TRB ,
 TRC ETC ETC, HOWEVER THESE COULD NTO BE
 LOCATED ON RISER DIAGRAM?
 215.5
  
 51)NOTE: PLEASE SEE HP ON RISER IS SHOWN
 FEEDING LP, HOWEVER PLEASE SEE HP PANEL
 SCHEDULE WHICH DOES NOT INDICATE ANY
 FEEDS TO LP? 215.5 PLEASE CORRELATE.
  
 52)NOTE:PLEASE SEE HG AS DOUBLE/FEED
 THRU PANEL, HOWEVER RISER INDICATES
 SINGLE PANEL. PLEASE SEE OTHER POSSIBLE
 PANELS, HB, LB AND PREVIOUS NOTE. #49
  
 53)NOTE: PLEASE SEE PANEL TF IS FED FROM
 LG AND LXG? PLEASE CORRELATE 215.5
  
 54)NOTE: PLEASE SEEA 600A MAIN FOR
 FUTURE REST. IS SHOWN, HOWEVER NO
 INFORMATION FOR VOLTAGE ETC WAS
 SUBMITTED. PLEASE SEE PREVIOUS COMMENT
 WITH RESPECT TO "CAFE".??
 215.5
  
 55)NOTE: PLEASE SEE NO PANEL SCHEDULE
 WAS SUBMITTED FOR PANEL HRA AT ROOF
 LEVEL??
 215.
  
 56)NOTE: PLEASE SEE NO PANEL SCHEDULES
 WERE SUBMITTED FOR PANELS , HS, LS, HXS,
 LXS,,,??
 215.5
  
 57)NOTE: PLEASE SEE HXG WHICH SHOWS FEED
 TO LX6, MISPRINT? FOR LXG?
 215.5
  
 58)NOTE: PLEASE SEE "ELB" WHICH
 INDICATES FEED TO LXRB ON RISER AND
 PANEL SCHEDULE INDICATES LXRA.
 PLEASE CORRELATE: 215.5
  
 59)NOTE: PLEASE SEE ELB FEEDS "HXRB" ON
 RISER , HOWEVER SHOWS "HXRA" ON PANEL
 SCHEDULE. PLEASE CORRELATE. 215.5
  
 60)NOTE: PLEASE SEE HXB FEEDS LXB ON
 RISER , HOWEVER THIS IS LXA ON PANEL
 SCHEDULE.215.5
  
 61)NOTE:PLEASE VERIFY2000A OCP AS
 NOTED FOR GENERATOR , HOWEVER LOAD SHOWN
 ON HXDP INDICATES LOADS ABOVE 2000A'S.
 PLEASE SEE MAIN AND ATS IS INDICATED AS
 2500AS'. PLEASE CORRELATE. 215.5
 PLEASE SEE GEN AND OCP SHALL BE SIZED
 FOR LOAD SERVED.
  
 62)NOTE: PLEASE SEE MOST OF THE ABOVE
 ITEMS ARE REDLINED ON ONE SET OF
 ELECTRICAL PLANS, HOWEVER THESE DO NOT
 IDICATE ALL POSSIBLE LOCATIONS OF NEEDED
 CORRECTIONS.
  
 63)NOTE: PLEASE SEE MUCH INFORMATION NOT
 SHOWN (PANEL SCHEDULES), (SPECS) ETC CAN
 NOT BE VERIFIED OR REVIEWED AT THIS
 TIME. PLEASE SUBMIT ALL INFOMATION.
  
 64)NOTE: PLEASE SEE POOL WILL BE
 REQUIRED TO BE UNDER SEPARATE PERMIT.
 PLEASE PLACE NOTE ON PLANS.
 IF NIGHT-TIME/AFTER DUSK WILL BE
 PROPOSED, SIGNED, SEALED PHOTOMETRICS
 WILL BE REQUIRED TO BE SUBMITTED TO PALM
 BEACH COUNTY HEALTH DEPT FOR REVIEW AND
 STAMPING.
 THIS WILL BE REQUIRED WITH POOL PERMIT.
  
 PLEASE SEE ANY POSSIBLE COMMENTS FROM
 OTHER REVIEWER(S) WHICH MAY HAVE A
 DIRECT EFFECT ON ELECTRICAL PLANS.
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE AREA ANY QUESTIONS,
 PLEASE DO NOT HESIATE IN CONTACTING THIS
 OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
  
2005-08-19 00:00:00PLANS STILL IN ELEC FOR REVIEW.
 UNITS, COMMON AREAS COMPLETED.
 SERVICE STILL NEEDS TO BE REVIEWED.
 REVIEW TO CONTINUE 8/22
 NOTES TO FOLLOW.
2005-08-18 00:00:001-SET OF SPEC BOOKS AND 1-SET OF MEP'S