Date |
Text |
2005-08-03 00:00:00 | ****** UNSAT ******* |
| |
| 1)NOTE: PLEASE SEE FIRE PUMP INFORMATION |
| IS CURRENTLY BEING REVIEWED UNDER |
| GENERATOR PERMIT, HOWEVER FIRE PUMP WILL |
| BE REQUIRED TO BE PERMITTED SEPARATELY. |
| PLEASE SEE THIS MAY BE SUBMITTED ALONG |
| WITH GENERATOR PERMIT SO IT MAY BE |
| REVIEWED AND PERMITTED AT THE SAME TIME. |
| PLANS, SPECS WILL BE REQUIRED FOR EACH |
| AS EACH WILL BE FILED UNDER SEPRATE |
| FILES. |
| |
| 2)NOTE: PLEASE SUBMIT ALL MANUFACTURE |
| SPECS/CUT SHEETS FOR GENERATOR, ATS, |
| FIRE PUMP, FIRE PUMP CONTROLLER. |
| PLEASE SEE OTHER COMMENTS FOR FPC, AS |
| SOME INFORMATION CAN NOT VERIFIED AT |
| THIS TIME. |
| 215.5 |
| |
| 3)NOTE: PLEASE SEE CONDUCTORS FROM FPL, |
| GENERATOR TO FIRE PUMP, FIRE PUMP CONT, |
| SHALL BE BASED ON 125%. |
| PLEASE SEE 695.6(C)(2) ETC. |
| PLEASE SEE PLANS INDICATE EXSITING |
| "NAMEPLATE @ 100HP, 250 FLA'S. THIS IS |
| ONLY A NOTE FOR VERIFICATION. NO |
| CORRECTION NEEDED. |
| |
| 4)NOTE: PLEASE SEE SPECS/CUT SHEETS FOR |
| FPC WERE SUBMITTED, HOWEVER PLEASE NOTE |
| THE MANUAL MEANS OF DISCONNECT LOCATED |
| ON OUTSIDE OF EQUIPMENT, RATED FOR THE |
| LAOD SERVED SHALL BE PART OF THE FPC. |
| PLEASE SEE 230.76,230.79,NFPA-20 CHAPTER |
| 7-4. |
| 5)NOTE:PLEASESEE THE LOCATION OF FIRE |
| PUMP CONTROLLER SHALL BE ARRANGED TO |
| PREVENT ANY DAMAGE TO FPC EQUIPMENT IN |
| THE EVENT OF FIRE/EXPLOSION ETC. |
| PLEASE KNOW,IT IS KNOWN THIS IS AN |
| EXSITING ROOM AND THERE ARE SOME |
| EXISTING CONDITIONS WHICH CAN NOT BE |
| AVOIDED. HOWEVER,A STEEL REINFORCED |
| CONCRETE WALL WILL BE REQUIRED TO HELP |
| IN SHIELDING ANY SUCH FIRE /EXPLOSION |
| FROM MAIN SERVICE EQUIPMENT. |
| PLEASE SEE 695.3, NFPA-20 6-2.1.ETC |
| |
| 6)NOTE: PLEASE SEE THE LOCATION OF FIRE |
| PUMP CONTROLLER SHALL BE SUCH THE |
| LEAKING OF ANY WATERFROM FIRE PUMP , |
| FIRE SPRINKLERS ETC WILL NOT AFFECT THE |
| FPC, PLEASE SEE NFPA-20 7-2,7-3.3.1, FOR |
| ENCLOSURE TYPE ETC. |
| PLEASE SEE NOTE ON PLANS MENTIONS FOR |
| FEEDERS FROM GEN TO ENTER BLDG AS LOW AS |
| POSSIBLE INTO REAR OF FIRE PUMP |
| CONTROLLER, HOWEVER PLEASE SEE |
| 7-2.2,695.12, WHICH REQUIRES FPC TO BE |
| MOUNTED A MIN OF 12" ABOVE FLR. |
| |
| 7)NOTE: PLEASE PROVIDE NOTE FOR SIGNAGE |
| FOR ALL ELECTRICAL EQUIPMENT. |
| 695.4B3,4 ETC. |
| |
| 8)NOTE: PLEASE SEE PROTECTIVE BOLLARDS |
| WILL BE REQUIRED OUTSIDE TO PROTECT GEN |
| ENCLOSURE FROM PARKING LOT AREA. |
| PLEASE SEE ANY ZONING COMMENTS. |
| |
| 9)NOTE: PLEASE SEE PLANS MENTIONS PIPING |
| IN ROOM SHALL BE EMT, PLEASE SEE |
| 695.6(2)(E). |
| |
| 10)NOTE: PLEASE SEE 701.11(B)(2)(3) FOR |
| SOURCES OF FUEL. |
| PLEASE SEE IT IS KNOWNTO OUR OFFICE |
| THE LOCAL UTILITY COMAPNY SUPPLYING |
| NATURAL GAS SEEMS TO BE AT OVER 500% |
| CAPACITY. PLEASE SEE AN ALTERANTE FUEL |
| SOURCE WILL BE REQUIRED FOR MIN REQUIRED |
| RUN TIME. |
| |
| 11)NOTE: PLEASE SEE SITE PLAN / SURVEY |
| WILL BE REQUIRED TO INDICATE THE BASE |
| FLOOD ELEVATION (BFE). GEN SLAB SHALL BE |
| A MIN OF 6" ABOVE BFE. PLEASE SEE BLDG |
| REVIEW COMMENTS. |
| PLEASE SEE BLDG REVIEW COMMENTS FOR |
| BOLT/TIE DOWN CONNECTIONS REQUIRED. |
| |
| 12)NOTE: PLEASE SEE FBC LOCAL |
| ADMINISTRATIVE SECTION 104.6.5, PERMIT |
| VALUATION IS BASED ON ALL LABOR AND |
| MATERIALS, EVEN IF EQUIPMENT IS OWNER |
| SUPPLIED. PLEASE ADJUST. |
| |
| |
| PLEASE SEE ANY POSSIBLE COMMENTS FROM |
| OTHER TRADES WHICH MAY AFFECT ELECTRICAL |
| PLANS. |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |
| |
| |