2005-08-01 00:00:00 | DENIED; |
| 1.POOL COMPLIES WITH FBC-2001 SEC 424.2 |
| PRIVATE SWIMMING POOLS (ADD TO NOTES) |
| 2.SEC. 424.2.6/1 ENGINEERING DESIGN, |
| CONSTRUCTION AND WORKMANSHIP PER. |
| ANSI/NSPI-5 (ADD TO NOTES) |
| 3.SEC.424.2.6.6.2 SHOW COMPLIANCE WITH |
| ANSI/ASME A112.19.8M. PROVIDE MODEL |
| NUMBER AND MANUF. INFORMATION FOR |
| VAC.LOCK. (GIVE DETAIL , SUBMITTLE OR |
| ADD TO NOTES) |
| 4.SEC.424.2.8/1 -4 VALVES SHALL BE |
| APPROVED BY FBC-2001.THEY WILL BE |
| READILY ACCESSIBLE FOR MAINT. AND |
| REMOVAL. FULL WAY VALVES SHALL BE |
| INSTALLED. WHERE CHECK VALVES ARE |
| INSTALLED THEY SHALL OF THE SWING OR |
| VERTICAL CHECK PATTERNS. |
| 5.SEC.424.2.9 WATER SUPPLY, LOCAL ORD. |
| #2853-95, BACKFLOW REQUIRED ON WATER |
| SERVICE. (ADD TO NOTES) |
| 6.SEC.424.2.12.1PRESSURE TESTS. PER. |
| MANUFACTURE RECOMMENDATIONS, NO AIR TEST |
| SHALL BE APPROVED FOR PVC PIPE AND |
| FITTINGS. (ADD TO NOTES) |
| 7.SEC.424.2.13.2 JOINTS AND CONNECTIONS. |
| FBC PLUMBING SEC. 605.21, PURPLE PRIMER |
| REQUIRED ON PVC PIPE. (ADD TO NOTES) |
| 8.SEC.424.2.15 GAS PIPING SHALL COMPLY |
| WITH FBC 2001 FUEL GAS. SEPARATE PLANS |
| AND PERMIT REQUIRED. |
| PLUMBING PLAN REVIEW BY; |
| JOHN LEECH |
| 805-6695 |