Date |
Text |
2005-09-21 00:00:00 | DENIED; 2ND TIME |
| 1) FBC-2001 424.2.7.2 PUMPS AND |
| EQUIPMENT SHALL BE MOUNTED ON A |
| SUBSTANTIAL BASE IN A MANNER THAT WILL |
| ELIMINATE STRAIN ON PIPING.SLAB SHALL |
| BE A NOMINAL 4" THICK. (DETAIL) |
| 2) FBC-2001 424.2.8.1 VALVES SHALL BE |
| MADE OF MATERIALS THAT ARE APPROVED IN |
| THE FLA BLDG CODE, PLUMBING.THEY WILL |
| BE READILY ACCESSIBLE FOR MAINT. AND |
| REMOVAL.SEC 424.2.8.2 FULL WAY VALVES |
| SHALL BE INSTALLED TO INSURE PROPER |
| FUNCTION OF THE FILTRATION AND PIPING |
| SYSTEMS.SEC 424.2.8.3 WHERE CHECK |
| VALVES ARE INSTALLED THEY SHALL BE OF |
| THE SWING OR VERTICAL CHECK PATTERNS. |
| SEC 424.2.8.4 COMBINATION VALVES SHALL |
| REQUIRE APPROVAL OF THE ADMINISTRATIVE |
| AUTHORITY PRIOR TO THEIR INSTALLATION. |
| 3) FBC-2001 424.2.12.1 PRESSURE TESTS. |
| PER MANUFACTURE RECOMMENDATIONS, NO AIR |
| TEST SHALL BE APPROVED FOR PVC PIPE AND |
| FITTINGS. (ADD TO NOTES) |
| 4)424.2.9 WATER SUPPLY, LOCAL ORD. |
| #2853-95, BACKFLOW REQUIRED ON WATER |
| SERVICE. (ADD TO NOTES) |
| 5)FBC-2001 424.2.13.2 JOINTS AND |
| CONNECTIONS, FBC PLUMBING SEC. 605.21, |
| PURPLE PRIMER REQUIRED ON PVC PIPING. |
| (ADD TO NOTES) |
| 6)424.2.15 GAS PIPING SHALL COMPLY WITH |
| FBC FUEL GAS. SEPARATE PLANS AND PERMIT |
| REQUIRED. (ADD TO NOTES) |
| PLANS WERE NEVER SENT BACK TO ENGINEER |
| FOR REQUESTED CHANGES. ENGINEER'S SEAL |
| DATE IS 6/12/05 FIRST REVIEW WAS DONE |
| 7/26/05. COPY OF FIRST REVIEW INCLOSED. |
| PLUMBING PLAN REVIEW BY; |
| JOHN LEECH |
| 805-6695 |
| |
| |