Date |
Text |
2005-07-01 00:00:00 | BUILDING REVIEW PROVISO: |
| 1- PROVIDE REVISED ENERGY CALCULATIOS |
| FOR WORST CASE SCENARIO CALCS. |
| 2- SHUTTERS UNDER A SEPARATE PERMIT. |
| 3- ROOF FRAMING PLAN: REVISE CONNECTOR |
| SPECIFIED AT FRONT PORCH MASONRY BEAMS. |
| NEED MASONRY CONNECTORS. SEE DETAILS |
| 4/D1 AND 5/D1 AND REVISE AS REQUIRED. |
| 4- TRUSS ANCHOR SCHEDULE: REVISE NAIL |
| SIZE FOR HUS26. SEE CATALOGUE. |
| 5- PROVIDE PRODUCT APPROVAL FOR: |
| A) 1 HOUR FIRE RATED DOOR AT EGRESS |
| ASSEMBLY. |
| B) FIXED WINDOW: NEED FLORIDA PRODUCT |
| APPROVAL COVER PAGE. |
| C) SINGLE HUNG WINDOWS NEED FLORIDA |
| PRODUCT APPROVAL COVER PAGE. |
| D) ROOF TILE NEEDS MATCHING FLORIDA |
| PRODUCT APPROVAL. |
| 6- WINDOW MULLIONS FOR FIXED WINDOWS: |
| CLEARLY SPECIFY SIZE OF MULLIONS AND |
| ANCHORS TO BE USED AT GREAT ROOM FIXED |
| WINDOW TO MEET THE CALCULATED DESIGN |
| PRESSURES. SEC. 104.2.1.2 CITY |
| AMENDMENTS TO FBC 2001. |
| 7- PROVIDE CLEAR WINDOW & DOOR SCHEDULES |
| WITH SIZES MATCHING PLANS. AND, SYMBOL |
| USED FOR REFERENCE. |
| 8- ENTRY DOORS IN DOOR SCHEDULE CALLS |
| FOR IMPACT GLASS. ELEVATION CALLS FOR |
| SOLID CORE. REVISE AS REQUIRED. |