Date |
Text |
2005-04-20 00:00:00 | DENIED |
| REFERENCE: FBC-2001 FUEL GAS |
| FBC-2001 CHAPTER 1 |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER FBC-2001 |
| FUEL GAS CODE. |
| 2. BTU LOAD OF EACH APPLIANCE AND THE |
| TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| THRU 402.5.2 AND TABLES 402(1) THRU |
| 402(34). |
| 3. SHOW THE DISTANCE FROM THE POINT OF |
| DELIVERY, (METER), TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| OF CAPACITY TABLES (A)(3). |
| 4) A GENERATOR PERMIT SHALL BE APPLIED |
| FOR PRIOR TO GAS PERMIT BEING ISSUED. A |
| SURVEY WILL BE SUBMITTED WITH THE |
| GENERATOR PERMIT APPLICATION. THERE WILL |
| BE A REVIEW BY STRUCTURAL, ELECTRICAL, |
| ZONING, MECHANICAL, AND GAS PLAN REVIEW |
| PERSONAL. |
| 5) SEARCH OF RECORDS INDICATE THAT THE |
| POOL PLUMBING HAS NOT PASSED THE |
| PERIMETER INSPECTION, NOR HAS IT HAD A |
| FINAL PLUMBING INSPECTION. - A POOL |
| PLUMBING PERMIT WILL BE REQUIRED TO DO |
| THE PLUMBING TO THE POOL HEATER PRIOR TO |
| GAS PERMIT BEING ISSUED. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 653-2692 |
| E-MAIL [email protected] |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| PER N. MELICK MANUFACTURE INFO |
| NOT REQUIRED FOR 1 & 2 FAMILY HOMES. |
| JULY 17, 2002 OFFICAL INTERPRETATION. |
| THE FIELD INSPECTOR SHALL VERIFY THE |
| INSTALLED EQUIPMENT INPUT DOES NOT EX- |
| CEED THE PIPE SIZING. |
| |