Date |
Text |
2005-07-20 00:00:00 | ******DENIED****** |
| |
| IN ADDITION TO THE 1ST FIRE PLAN REVIEW |
| COMMENTS THAT REQUIRE YOUR RESPONSE, |
| PLEASE SEE THE FOLLOWING THAT WILL NEED |
| TO BE ADDRESSED. |
| |
| 1) ALL LIFE SAFETY TO COMPLY WITH NFPA |
| 101, 2003 EDITION, AND NFPA 1, 2003 |
| EDITION. |
| |
| 2) SEPARATE SHOP DRAWINGS AND PERMITS |
| WILL BE REQUIRED FOR THE GENERATOR |
| INSTALLATION AND FUEL SUPPLY. |
| |
| 3) FIRE DEPARTMENT CONNECTION AND DOUBLE |
| CHECK DETECTOR ASSEMBLY SHALL REMAIN |
| UNOBSTRUCTED BY VEGETATION AND REMAIN |
| ACCESSABLE. |
| |
| 4) TEMPORARY STANDPIPES ARE REQUIRED |
| WHEN BUILDING HEIGHT REACHES 3 STORIES |
| OR 30'. |
| |
| 5) PLEASE EXPLAIN FIRE ACCESS LANE SHOWN |
| ON SHEET A-0.02. |
| |
| 6) PANIC HARDWARE IS REQUIRED ON DOORS |
| SERVING AN ASSEMBLY AREA WITH OCCUPANT |
| LOAD GREATER THAN 100 PERSONS. |
| |
| 7) PLEASE ILLUSTRATE INTERIOR FINISH |
| CLASSIFICATION OF WALLS AND CEILINGS. |
| |
| 8) 2A-10B,C FIRE EXTINGUISHERS SHALL VBE |
| MOUNTED NOT TO EXCEED 75' TRAVEL |
| DISTANCE. |
| |
| 9) PLEASE NOTE THAT PENETRATIONS AND |
| OPENINGS INTO EXIT ENCLOSURE ASSEMBLIES |
| SHALL COMPLY WITH NFPA 101, SECTION |
| 7.1.3.2.1. |
| |
| 10) SOME OF THE DOOR SWINGS APPEAR TO |
| OBSTRUCT THE HALLWAYS BY GREATER THAN |
| 1/2 THE WIDTH OF THE EXIT ACCESS. |
| |
| 11) DUCT SMOKE DETECTORS WHERE PROVIDED |
| SHALL BE INSTALLED TO INITIATE A GENERAL |
| FIRE ALARM WHEN ACTIVATED. |
| |
| 12) ELEVATION DRAWINGS SHOW HANDRAILS IN |
| THE MIDDLE OF THE ENTRANCE STAIRS. IN |
| ADDITION, HANDRAILS ARE REQUIRED ON BOTH |
| SIDES OF STAIRS. |
| |
| 13) PLEASE PROVIDE FLAME RETARDANT |
| INFORMATION ON AWNINGS. |
| |
| 14) AS PREVIOUSLY NOTED, NEW FIRE ALARM |
| SYSTEMS SHALL BE UL CERTIFIED FOR |
| CENTRAL STATION SERVICE. |
| |
| |
| MIKE WENNERGREN, CAPTAIN |
| WPBFR(561) 805-6722 OR 804-4756 |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |