2005-07-11 00:00:00************ UNSAT ************
  
 PLEASE SEE SOME NOTES FROM PREVIOUS
 REVIEW STILL NEED TO BE ADDRESSED.
 PLEASE ALSO SEE NEW NOTES.
  
 ****************************************
 PLEASE SEE A RESPONSE LETTER WOULD HELP
 IN THE REVIEW PROCESS IN ORDER TO
 CLARIFY CERTAIN CODE ITEMS.
  
 ****************************************
  
  
 1)NOTE: PLEASE PROVIDE ALL LIGHT POLE/
 LIGHT FIXTURE WIND LOADING INFORMATION
 FOR REVIEW AT THIS TIME.
 PLEASE SEE MIN FBC 140 MPH.
 IF "SITE LIGHTING" WIND LOAD INFORMATION
 AND FIXTURE INFORMATION IS NOT PROVIDED
 AT THIS TIME, A SEPARATE PERMIT MAY BE
 APPLIED FOR AT A LATER DATE.
  
 2)NOTE:PLEASE SEE FAC 61G15-23.002 FOR
 MISSING INFORMATION REQUIRED ON TITLE
 BLOCK FOR ENG FIRM. PLEASE ALSO SEE FS
 471.023.
 PLEASE SEE THIS INFORMATION IS REQUIRED
 ON ALL SHEETS AND FOR ALL TRADES
 WHEATHER OR NOT COMMENT IS MADE BY OTHER
 REVIEWER(S).
  
 3)NOTE:PLEASE SEE NOTES FOR ELECTRICAL
 REFERENCES SOME CODES FROM THE 1996 NEC.
 PLEASE SEE WE ARE CURRENTLY UNDER THE
 2002 NEC.
  
 4)NOTE: PLEASE SEE 3.03, A "PANEL" IS
 SHOWN BUT NO INDICATION OF WHAT PANEL
 IS.
  
 5)NOTE: PLEASE NOTE ON LIGHTNING
 PROTECTION PLANS FOR ALL WORK TO BE
 INSTALLED PER NFPA-780.
  
 6)NOTE: PLEASE SUBMIT ALL INFORMATION ON
 FIRE PUMP/ FIRE PUMP CONTROLLER.
 PLEASE SUBMIT MANUFACTURE SPEC SHEETS
 FOR BOTH.
 PLEASE SEE NO SUBMITTIALS/SPECS/ CUT
 SHEETS COULD BE LOCATED.
 PLEASE SEE 230.76,230.79 FOR THE
 REQUIRED MANUAL MEANS OF DISCONNECT
 REQUIRED. PLEASE SPECIFY THIS ON PLANS.
 PLEASE PLACE NOTE ONRISER DIAGRAM
 THAT THE OVERCURRENT PROTECTIVE
 DEVICE(S) SHALL BE SELECTED OR SET TO
 CARRY INDEFINITELY THE SUM OF THE
 LOCKED-ROTOR CURRENT OF THE FIRE PUMP
 MOTOR(S) AND THE PRESSURE MAINTENANCE
 PUMP MOTOR(S) AND THE FULL-LOAD CURRENT
 OF THE ASSOCIATED FIRE PUMP ACCESSORY
 EQUIPMENT WHEN CONNECTED TO THIS POWER
 SUPPLY.
 PLEASE SEE MISSING CONDUCTORS FROM FIRE
 PUMP CONTROLLER TO FIRE PUMP.
 PLEASE SEE FEEDER #9 SHOWS AN
 EQUIPMENTGROUNDING CONDUCTOR FROM FPL TO
 FIRST MEANS OF DISCONNECT. PLEASE SEE
 250.6,250.24, EQUIPMENT GROUNDS ARE ONLY
 INSTALLED AFTER THE FIRST MEANS OF
 DISCONNECT.
  
 7)NOTE: PELASE SEE 445.13 FOR SIZING OF
 CONDUCTORS FROM GENERATOR.THE AMPACITY
 OF THE CONDUCTORS FROM THE GENERATOR
 TERMINALS TO THE FIRST DISTRIBUTION
 DEVICE(S) CONTAINING OVERCURRENT
 PROTECTION SHALL NOT BE LESS THAN 115
 PERCENT OF THE NAMEPLATE CURRENT RATING
 OF THE GENERATOR.
  
 8)NOTE: PLEASE SEE FEEDER #28 ON FEEDER
 SCHEDULE, PLEASE CALRIFY # OF
 CONDUCTORS?
  
 9)NOTE: PLEASE INDICATE INFORMATION FOR
 GENERATOR, GENERATOR SIZE ETC.
 PLEASE SUBMIT MANUFACTURE SPEC SHEETS
 FOR GEN/ ATS/ GEN SUB-BASE FUEL TANKS
 ETC.
 PLEASE SEE ATS FEED AND OCP IS SHOWN AS
 100A'S,, HOWEVER LOAD SHOWN EXCEEDS
 RATING OF BRKR AND ATS.
 PLEASE SHOW SIZING OF CONDUCTORS PER
 ABOVE.
 PLEASE SEE MISSING OCP AT GENERATOR>?
 215.5
  
 10)NOTE: PLEASE SEE 695.3, THE MAIN FOR
 FIRE PUMP SHOULD NOT BE LOCATED IN THE
 SAME ROOM AS NORMAL MAINS. PLEASE SEE IF
 THERE WAS A FIRE OF SORTS IN MAIN
 ELECTRICAL RM OR EQUIPMENT THIS WOULD
 DIRECTLY AFFECT ELECTRICAL POWER TO FIRE
 PUMP.
  
 11)NOTE: PLEASE CORRELATE CIRCUTING FOR
 RECEPTS IN ELEC/MACH/ELEV RMS WITH 1/4"
 SCALE ON EACH SHEET WITH SAME RECEPTS
 SHOWN ON PLANS.
 215.5
  
 12)NOTE: PLEASE SEE NOTE #1 ON E4.10
 ELECTRICAL NOTES MENTIONS, "MAIN CIRCUIT
 BREAKERS IN PANEL BOARDS SHALL BE GROUND
 FULAT PROTECTED"
 PLEASE VERIFY THIS ? PLEASE SEE
 240.13,230.95 ETC WHEN GROUND FAULT
 PROTECTION IS REQUIRED. THIS IS STILL IN
 QUESTION. PLEASE EXPLAIN IN RESPONSE
 LTR.
  
 13)NOTE: PLEASE SHOW LOAD CALCULATIONS,
 PLEASE SHOW PER
 220.3,220.10,220.11,220.13 ETC.
 PLEASE ALSO SHOW ALL CONTINOUS LOADS
 AT 125% PER 215.3,230.42
 REQUESTED ON PREVIOUS REVIEW.
  
 14)NOTE: PLEASE SHOW OR NOTE ALL TRACK
 LIGHTING CALCULATIONS PER 220.12
 REQUESTED ON PREVISOU REVIEW.
  
 15)NOTE: PLEASE SEE NOTE #22 ON E0.03
 FOR
  
 16)NOTE: PLEASE SEE 700.16 AND 620.23A,
 620.24 FOR REQUIREMENTS IN ELEC RMS/
 ELEVATOR MACHINE RMS ETC.
 PLEASE SEE THIS WAS REQUESTED ON
 PREVIOUS REVIEW, HOWEVER NO CHANGES SEEM
 TO HAVE BEEN MADE. A SEPARATE BRANCH
 CIRCUIT SHALL SUPPLY THE MACHINE ROOM OR
 CONTROL ROOM/MACHINERY SPACE OR CONTROL
 SPACE LIGHTING AND RECEPTACLE(S).
  
 17)NOTE: PLEASE PROVIDE ALTERNATING
 CIRCUITING FOR ALL EGRESS AREAS.
 ALTERNATING CIRCUITING IS ALREADY SHOWN
 FOR STAIRWELLS.LS 101 7-9
 EMERGENCY LIGHTING SYSTEMS SHALL BE
 DESIGNED AND INSTALLED SO THAT THE
 FAILURE OF ANY INDIVIDUAL LIGHTING
 CIRCUIT, SUCH AS THE BURNING OUT OF A
 LIGHT BULB,TRIPPING OF A BREAKER OR
 TURNING OFF OF A SWICTH CANNOT LEAVE IN
 TOTAL DARKNESS ANY SPACE THAT REQUIRES
 EMERGENCY ILLUMINATION.
 WHERE HIGH-INTENSITY DISCHARGE LIGHTING
 SUCH AS HIGH- AND LOW-PRESSURE SODIUM,
 MERCURY VAPOR, AND METAL HALIDE IS USED
 AS THE SOLE SOURCE OF NORMAL
 ILLUMINATION, THE EMERGENCY LIGHTING
 SYSTEM SHALL BE REQUIRED TO OPERATE
 UNTIL NORMAL ILLUMINATION HAS BEEN
 RESTORED.
  
 18)NOTE: PLEASE SEE PLANS ARE INDICATING
 BLDG AS "HISTORIC" YET IT IS UNCLEAR IF
 BUILDING HAS "HISTORIC DESIGNATION"?
 THIS IS ONLY NOTED:
  
 PLEASE SEE POSSIBLE NOTES FROM OTHER
 REVIEWERS WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
 PLEASE SEE THERE MAY BE FURTHER COMMENTS
 SINCE NOT ALL INFORMATION WAS SUBMITTED
 FOR REVIEW.
  
 PLEASE REVMOVE ALL OLD/VOIDED SHEETS AND
 ONLY INSERT NEW REVISED SHEETS INTO
 COMPLETE SETS FOR REVIEW AND STMAPING.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
  
  
2005-07-08 00:00:00IN ELEC FOR REVIEW.