Plan Review Notes
Plan Review Notes For Permit 05010662
Permit Number 05010662
Review Stop G
Sequence Number 1
Notes
Date Text
2005-02-07 00:00:00DENIED
 REFERENCE: FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
 1) ELECTRIC PERMIT WILL BE REQUIRED FOR
 THE GENERATOR PRIOR TO GAS FINAL.
 SECTION 104.1.1
 2) ZONING APPROVAL REQUIRED FOR
 GENERATOR LOCATED OUTSIDE BUILDING.
 3) SUBMIT REGULATOR MANUFACTURE
 SPECIFICATION SHEETS.
 4) INDICATE LOCATION OF REGULATORS ON
 GAS ISOMETRIC. SHUT OFF VALVE REQUIRED
 UPSTREAM OF THE REGULATORS. SECTION
 5) INDICATE IF THIS IS A SEPARATE METER
 FOR THE GENERATOR. IF NOT SHOW EXISTING
 GAS PIPING DIAGRAM SHOWING ALL PIPE
 SIZES, EXISTING GAS APPLIANCES, EXISTING
 BTU LOAD FOR EACH APPLIANCES AND TOTAL
 BTU LOAD EXISTING. SECTION 404.2
 6) VALUE OF GAS PERMIT SHALL REFLECT THE
 PRICE OF THE GENERATOR, ALL PIPING
 MATERIAL, AND LABOR. SECTION 104.6.5
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved