Plan Review Notes
Plan Review Notes For Permit 04120353
Permit Number 04120353
Review Stop E
Sequence Number 4
Notes
Date Text
2005-12-31 00:00:00REVIEW STARTED, IN PROGRESS
 ** SEE ALL NOTES BELOW FOR CONDITIONS **
  
  
 ** PLANS TO REMAIN IN "F" STATUS UNTILL
 THE FOLLOWING NOTES ARE ADDRESSED TO
 CHANGE PROJECT TO "P" (PASSED) STATUS.
  
 1)NOTE: PLEASE SEE ONE SET IS MISSING
 SHEET E1.05
  
 2)NOTE: PLEASE SEE ALL THREE SETS ARE
 MISSING SHEETS E8.06-8.14 AS INDICATED
 ON COVER SHEET.?? THESE WERE IN PREVIOUS
 SETS? SEE PROVISO ALSO.
  
 2)NOTE: PLEASE SEE PREVIOUS REVIEWS
 WHICH REQUESTED ALL SUBMITTALS FOR ALL
 EQUIPMENT SPECS:
 PLEASE SEE THE FIRE PUMP AND FIRE PUMP
 CONTROLLER SPECS WERE SUBMITTED, HOWEVER
 THERE APPEARS TO BE ONLY ONE SET AND
 THEY ARE LOCATED IN THE REPSONSE PACKAGE
 BY THE ENGINEER. PLEASE SEE THE
 "EQUIPMENT SPEC BOOKS" SHOULD CONTAIN
 THREE SETS OF SAID SPECS FOR FP AND FPC.
  
 3)NOTE: PLEASE ALSO SEE NOTES PERTAINING
 TO "COLOR CODING SPEC SHEET" AND
 BUS-DUCT SPEC SHEET" WHICH WERE TO BE
 REVISED IN " JOBSITE SPEC BOOKS". THESE
 SHEETS WERE REVISED, HOWEVER THE ONE
 COPY OF THESE (BUS-DUCT) WAS SUBMITTED
 IN THE SAME PACKAGE WITH THE ENGINEER'S
 RESPONSES AND THE OTHER REVISED COPIES
 OF COLOR CODING WERE SUBMITTED IN EQUIP
 SPEC BKS..
 PLEASE SEE THREE COPIES OF THE REVISED
 16120-2 WERE PLACED IN EQIP SPEC BK
 INSTEAD IF JOBSITE SPEC BOOK.
  
 ** PLEASE BRING IN SHEETSNEEDED TO
 COMPLETE ALL THREE "JOBSITE SPEC BOOKS"
 AND THE THREE COPIES OF "EQUIPMENT SPEC
 BOOKS".
 THESE BOOKS WILL BE STAMPED AT THAT
 TIME.
  
 ****************************************
 PLEASE SEE THE FOLLOWING WILL BE SET UP
 AS A "PROVISO" WHICH WILL REQUIRE SOME
 SHEETS TO BE REVISED "BEFORE ANY ROUGH
 ELECTRICAL INSPECTION" OR 6 MONTHS WHICH
 EVER COMES FIRST.
 THESE ITEMS HAVE ALSO BEEN REDLINED ON
 PLANS.
 ITEMS FROM PREVIOUS REVIEWS AND
 INFORMATION TO BE FORTH COMING.
  
  
 ********** PROVISO/REVISION ***********
  
 1)NOTE: PLEASE SEE MISSING RECEPTS IN
 UNITS
 "A", "G","D","HD". 210.52
 REDLINED
  
 2)NOTE:PLEASE SEE SOME AREAS LABLED AS
 "FOYER CONTAIN RECEPTS ON SMALL
 APPLIANCE CIRCUITS. SEE 210.52B1 UNIT
 G-1,E-1, VV1
 REDLINED.
  
 3)NOTE:PLEASE SEE THE FOLLOWING UNITS
 WHICH SMOKE DETECTORS ARE STILL SHOWN ON
 MORE THAN ONE CIRCUIT. SEE UNIT #4, C-1
 REDLINED.
  
 4)NOTE: PLEASE SEE UNIT "S" DINING RM
 DESIGNATION REMOVED.
 REDLINED
  
 5)NOTE: PLEASE SEE SHEET 7.09 DOES NOT
 CONTAIN THE FEEDER SCHEDULE FOR THE 225A
 PANEL "N", THIS WAS REVISED ON 7.08.
 REDLINED.
  
 6)NOTE: PLEASE SEE PANEL SCHEDULE FOR
 UNIT "D-2" WAS SUBMITTED, HOWEVER
 CIRCUIT #15 FOR SD'S DOES NOT INDICATE
 THE REQUIRED ARC FAULT PROTECTION NOTE.
 REDLINED ON PANEL SCHEDULE, UNIT.210.12
  
 7)NOTE:POOL AREA LIGHTING TO MEET MIN
 CLEARENCES PER 680.22 AND 411.4
 SOME FIXTURES SHOWN CLOSER THAN
 PERMITTED.
 REDLINED.
  
 8)NOTE:PLEASE SEE LS101 7.8.1.3 (1)
 WHICH REQUIRES A MIN OF 10FT
 CANDLES(108LUX) IN STAIR TOWERS. THIS
 LEVEL OF LIGHTING IS REQUIRED ON THE
 WALKING SURFACES DURING NOMRAL POWER
 CONDITIONS.(1FT CANDLE IN EMERGENCY
 CONDITIONS. PHOTO-METRICS WILL BE
 REQUIRED OF STAIR-
 TOWERS.
  
 PLEASE SEE LS101 7.9.2.2 WHICH MENTIONS
 IN THE EVENT OF THE TRIPPING OF ANY
 SINGLE MEANS OF OCP WSHOULD NOT LEAVE
 ANY EGRESS AREA IN TOTAL DARKNESS.
 PLEASE ALSO SEE A MIN OF SOME SORT OF
 BATTERY BACK UP FIXTURE FOR CORRIDOR'S
 AND PARKING GARAGE WILL BE REQUIRD TO
 PROVIDE MEANS OF EGRESS AT A LIGHTING
 LEVEL OF 1FT CANDLE.
  
 9)NOTE: PLEASE SEE 230.95,707.7D,700.26
 ETC.
 PLEASE SEE A 4-POLE ATS WILL BE
 REQUIRED.
 PLEASE KNOW, THE GFP IS NOT REQUIRED ON
 THE EMERGENCY/ GENERATOR SIDE OF THE EM
 DISTRIBUTION SYSTEM, HOWEVER PLEASE SEE
 THE ABOVE REFERENCES WHICH DO REQUIRE GF
 SENSING. PLEASE SEE THE FOLLOWING IS
 TAKEN DIRECTLY FROM ASCO DOCUMENTS
 FORWARD TO ME.
 "WHERE GROUND FAULTPROTECTION IS
 TRIGGERED BY THE CODE AND AN ALTERNATE
 POWER SUPPLY IS INCLUDED,SWITCHING OF
 THE NEUTRAL BECOMES NECESSARY.THE
 SERVICE IS LARGER THAN 1,000 AMPS.
 CONSEQUENTLY, GROUNDFAULT PROTECTION
 IS REQUIRED AT THE MAIN SERVICE
 DISCONNECT AT A MINIMUM. IF ITIS
 INSTALLED THERE AND THE GENERATOR
 NEUTRAL GROUNDING WAS THROUGH A SOLID
 CONNECTION TO THE MAIN SERVICE NEUTRAL,
 A GROUND FAULT WHEN THE GENERATOR IS
 FEEDING THE LOAD WILL CAUSE THE MAIN
 SERVICE DISCONNECT TO OPEN. THIS WILL
 NOTDISCONNECT THE ARCING FAULT FROM
 THE GENERATOR. COORDINATION IS THUS
 LOST."
 PLEASE KNOW, IF THE MAIN IS IN THE
 OPENING POSITION WHEN POWERM COMES BACK
 ON, THE SENSING OF THE FPL WOULD CAUSE
 THE ATS TO SWITCH BACK, HOWEVER THERE
 WOULD NOT BE ANY POWER THROUGH THE
 ELECTRICAL SYSTEM AS THE MAIN FOR THE EM
 SYSTEM WOULD HAVE TRIPPED/OPENED.
 PLEASE REVISE RISER AND REVISE NOTES TO
 REFERENCE A 4-POLE TRANSFER SWITCH AND
 INDICATING THE SEPARATELY DERIVED
 SYSTEM.
  
  
 **PLEASE SEE THE ABOVE REDLINES/PROVISO
 ITEMS WILL NEED TO BE ADDRESSED BEFORE
 ANY ROUGH ELECTRICAL INSPECTION IS
 SCHEDULED.
 ** PLEASE KNOW, ELECTRICAL PERMIT MAY BE
 PLACED IN A "HOLD" STATUS UPON 6 MONTHS
 TIME TABLE AND "PROVISO" HAS NOT BEEN
 SUBMITTED.
  
 ** PLEASE KNOW, ANY OTHER
 REVISIONS/DESIGN CHANGES MAY ALSO BE
 SUBMITTED AT THAT TIME.
  
  
 ** PLEASE CALL TO GO OVER SUCH ITEMS
 LISTED ABOVE TO HELP IN EXPEDITING THIS
 PROJECT TO A "P" STATUS.
  
 IF THERE ARE ANY QUESTIONS, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
 ?
2005-12-30 00:00:00REVIEW IN PROGRESS, FINISH FOR 12/30
 WILL CONTINUE ON 12/31
2005-12-25 00:00:00IN ELECTRIC FOR REVIEW.