2007-10-25 18:10:05 | REVISION 15 |
| |
| FBC 2001 CODES W/ 2003 SUPPLEMENTS |
| |
| THE FOLLOWING PAGES WERE NOT REVIEWED AS PART OF REV15 |
| BECAUSE THEY WERE SUPERCEDED PRIOR TO REVIEW: |
| M2.27 SUPERCEDED BY REV16 |
| M2.29 SUPERCEDED BY REV16 |
| M2.32A SUPERCEDED BY REV16 |
| M2.32C SUPERCEDED BY REV16 |
| M6.03 SUPERCEDED BY REV16 |
| |
| THE FOLLOWING PAGES WERE REVIEWED FOR CODE COMPLIANCE |
| AND PASSED: |
| M2.05 |
| M2.06 |
| M2.19 |
| M2.19B |
| M2.20A |
| M2.28 |
| M3.02 |
| M3.03 |
| M3.04 |
| M4.02 |
| |
| THE FOLLOWING PAGE(S) WERE REVIEWED FOR CODE COMPLIANCE |
| AND DENIED WITH COMMENTS: |
| |
| M2.18: TOILET AND DRYER EXHAUST IN UNIT V1 ARE |
| TERMINATING AT "CUBE CORE" GRILLS. ARE THESE LISTED FOR |
| USE ON DRYER EXHAUST? WHERE WILL THE BACKDRAFT DAMPER |
| FOR THE DRYER EXHAUST BE LOCATED? WHY IS THERE AN |
| INLINE BACKDRAFT DAMPER IN THE TOILET EXHAUST DUCT? |
| THERE IS NO DETAIL FOR THIS TYPE OF TERMINATION AT |
| DRYER AND TOILET EXHAUST. THIS IS THE SECOND TIME THIS |
| INFORMATION IS BEING REQUESTED. SHOW COMPLIANCE WITH |
| FBC,M 401.5 AND 504.4. |
| |
| M2.20: MECHANICAL CLOSET FOR HPU-5-3 IS SHOWN AS A |
| PLENUM. DISCHARGE EXHAUST DUCT FOR EF-5-2 IS ROUTED |
| THROUGH THIS PLENUM. EXHAUST DUCTS UNDER POSITIVE |
| PRESSURE SHALL NOT BE LOCATED IN A PLENUM IN ACCORDANCE |
| WITH FBC,M 601.3. SHOW HOW THIS DUCT IS TO BE ISOLATED |
| FROM PLENUM. |
| |
| M2.30: UNIT-P, HPU-1 AND HPU-5 REQUIRE FAN SHUT DOWN BY |
| SMOKE DETECTOR IN ACCORDANCE WITH FBC,M 606.2.2. |
| |
| M2.31: UNIT-T, NOTE ON PLAN CALLS FOR EXHAUST DUCT TO |
| BE BOXED OUT OF PLENUM TO COMPLY WITH FBC,M 601.3. |
| HOWEVER, THIS MAY NOT BE FEASIBLE WHEN THE CEILING |
| MOUNTED EXHAUST FAN IS ALSO IN THE PLENUM. PLEASE SHOW |
| HOW THIS IS TO BE ACCOMPLISHED. |
| |
| M2.32: UNIT-U, 12X6 RETURN DUCT IN BEDROOM 2 DOES NOT |
| ATTACH TO PLENUM. HOW WILL RETURN AIR GET FROM BEDROOM |
| TO PLENUM? SHOW COMPLIANCE WITH FBC,M 601.4. ALSO, WHY |
| US THERE A RETURN IN THE LAUNDRY ROOM? BALANCED RETURN |
| IS NOT REQUIRED FROM THIS AREA UNDER THIS SECTION. |
| |
| M2.32B: UNIT P2, SUPPLY FLEX IN BEDROOM 2 IS MISSING |
| SIZE. PLEASE CORRECT. FBC,M 601.1 |
| |
| M2.23D: UNIT P, RETURN TRANSFERS FROM MASTER BEDROOM |
| AND BEDROOM 2 ARE TOO SMALL TO MEET THE BALANCED RETURN |
| EXCEPTIONS UNDER FBC,M 601.4. IF TRANSFERS ARE NOT |
| DESIGNED TO MEET THESE EXCEPTIONS, A FIELD TEST WILL BE |
| REQUIRED AT FNAL INSPECTION TO VERIFY PRESSURE |
| DIFFERENTIALS ARE LESS THAN 0.01 INCHES W.C AS REQUIRED |
| BY THIS SECTION. ALSO, NOTE ON PLAN CALLS FOR EXHAUST |
| DUCT TO BE BOXED OUT OF PLENUM TO COMPLY WITH FBC,M |
| 601.3. HOWEVER, THIS MAY NOT BE FEASIBLE WHEN THE |
| CEILING MOUNTED EXHAUST FAN IS ALSO IN THE PLENUM. |
| PLEASE SHOW HOW THIS IS TO BE ACCOMPLISHED. |
| |
| M2.32D: UNIT R, RETURN TRANSFER FOR MASTER BEDROOM IS |
| TOO SMALL TO MEET THE BALANCED RETURN EXCEPTIONS UNDER |
| FBC,M 601.4. IF TRANSFERS ARE NOT DESIGNED TO MEET |
| THESE EXCEPTIONS, A FIELD TEST WILL BE REQUIRED AT FNAL |
| INSPECTION TO VERIFY PRESSURE DIFFERENTIALS ARE LESS |
| THAN 0.01 INCHES W.C AS REQUIRED BY THIS SECTION. |
| |
| M2.32D: UNIT S, THE RETURN TRANSFER FOR BEDROOM 2 IS |
| GOING INTO THE BATHROOM, THEREFORE THE AIR IS NOT BEING |
| RETURNED TO THE HPU. PLEASE CORRECT AND SHOW COMPLIANCE |
| WITH FBC,M 601.3. ALSO, THE PLENUM AREA ABOVE THE |
| CEILING IS NOT DEFINED ON THE FLOOR PLAN. PLEASE |
| CORRECT. FBC,M 602.2 |
| |
| M2.32E: UNIT T, NOTE ON PLAN CALLS FOR EXHAUST DUCT TO |
| BE BOXED OUT OF PLENUM TO COMPLY WITH FBC,M 601.3. |
| HOWEVER, THIS MAY NOT BE FEASIBLE WHEN THE CEILING |
| MOUNTED EXHAUST FAN IS ALSO IN THE PLENUM. PLEASE SHOW |
| HOW THIS IS TO BE ACCOMPLISHED. |
| |
| M2.32F: UNIT U, 12X6 RETURN DUCT IN BEDROOM 2 IS NOT |
| ATTACHED TO PLENUM. PLEASE CORRECT AND SHOW COMPLIANCE |
| WITH FBC,M 601.3. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |
| |
| |
| |
| |