Plan Review Notes
Plan Review Notes For Permit 04120353
Permit Number 04120353
Review Stop E
Sequence Number 32
Notes
Date Text
2008-03-15 21:01:21PG. E2.02THE TWO A/CS IN P1 SHOW OCP THAT
 VIOLATES THE NAMEPLATE OF THE UNITS PLEASE CORRECT OCP
 FOR UNITS
  
 PG. E2.02SHOWS TWO SWITCHES TO FIXTURES ABOVE,
 ARE THESE FIXTURES IN THE SAME ROOM? PLAN IS
 CONFUSING.
  
 PG. E4.01 COMMUNICATION ROOM SHOW TAILS TO
 EQUIPMENT, HOW DO YOU KNOW TAILS WILL BE LARGE ENOUGH
 (AMPEREAGE)?
 YOU WILL NEED TO SUPPLY
 EQUIPMENT DETAILS FOR SIZING BRANCH CIRCUITS.ALSOL
 NEED TO SHOW EQUIPMENT ON PLANS.
  
 PG. E6.01LOOKING AT REV1 FOR THE GENERATOR SHOWS
 TWO BREAKERS BUILTIN, ON JOB ONE WAS ADDED TO
 GENERATOR, PLEASE HAVE GENERATOR RELISTED TO SHOW ONE
 INTERNAL
 AND ONE EXTERNAL.
  
 PG. E6.08, E6.09SHOWS TWO 4" CONDUITS STUBBING INTO
 THE CORIDOOR CEILING, DO YOU WANT ACCESS PANELS IN THE
 CORIDOOR CEILING TO BE ABLE TO ACCESS PIPES?
 SHOWS A 20 DEDICATED
 CIRCUIT TO COMMUNICATIONS PANEL IN BEDROOM CLOSET. THIS
 NEEDS TO BE AFCI PROTECTED.210.12
 SHOWS A CADWELL PLATE FOR
 GROUNDING, IS THIS JUST A TYPE OR ARE THE WIRES TO BE
 CADWELDED TO THIS BAR?
  
 PG. E7.14TRANSFORMER THAT FEEDS LGHE IS PROTECTED ON
 PRIMARY BY 3 POLE 25A BREAKER, AND SECONDARY HAS 100A.
 THERE IS NOT A 100A AVAILABLE ON THE SECONDARY SIDE
 PRIMARY HAS ROOM FOR 2.7 AMPERES. I WILL LOOK INTO THIS
 FURTHER AND GET BACK TO YOU BUT I DON'T FEEL THAT THE
 SECONDARY SHOULD BE PROTECTED BY 100A MAIN
 WHEN THERE IS NO ROOM FOR FUTURE
 EXPANSION.IF LOAD GOES TO 100% THE 25AMP MAIN SHOULD
 TRIP.