Date |
Text |
2005-09-07 00:00:00 | ************ UNSAT 3ND REVIEW ********* |
| |
| PLEASE SEENOTES FROM PREVIOUS |
| REVIEW STILL NEED TO BE ADDRESSED. |
| |
| PLEASE ALSO SEESOME NEW NOTES. |
| |
| *************************************** |
| PLEASE SEE FIRST AND SECOND PART OF |
| NOTES IS DIRECTLY TAKEN FROM FIRST TWO |
| REVIEW. PART 3 WILL BE NEW NOTES. |
| *************************************** |
| |
| 1)NOTE: NOTE #1, OK, HOWEVER PLEASE SEE |
| NOTE #19FROM SECOND REVIEW WHICH STILL |
| HAS ONE COMMENT. |
| |
| 2)NOTE: NOTE #2 OK |
| |
| 3)NOTE: NOTE #3 OK |
| |
| 4)NOTE: NOTE #4 OK. |
| |
| 5)NOTE: NOTE #5 OK ON PREVIOUS REVIEW, |
| HOWEVER PLEASE NOW SEE 2.04 WHICH SHOWS |
| BOTH FPL VAULT AND MAIN ELECTRICAL RM |
| BEING THE SAME ROOM? |
| |
| 6)NOTE: NOTE #6 OK, NO, PLEASE SEE |
| RESPONSE LTR FROM ENGINEER STATES |
| SIGNAGE AND LOCATIONS, HOWEVER PLEASE |
| SEE NOTES ADDED TO PLANS SEEMS TO HAV |
| MISSED /OR HAVE FIRE COMMAND ROOM |
| REMOVED FROM NOTE. PLEASE SEE NOTE FOR |
| "ARC FLASH" COULD NOT BE LOCATED. |
| |
| 7)NOTE: NOTE #7,OK |
| |
| 8)NOTE: NOTE #8 OK. CORRECT, ADDED |
| CIRCUITS. |
| |
| 9)NOTE: NOTE #9 OK. |
| |
| 10)NOTE: NOTE #10 OK, |
| PLEASE SEE NEW NOTES PERTAINING TO FIRE |
| ALAEM SHEETS AND CODES REFEERNCED. |
| |
| 11)NOTE: NOTE #11 OK. |
| |
| 12)NOTE: NOTE #12 OK, ARCHITECTURUAL |
| RESPONSE MENTIONS FULL ACCESSIBILTY FROM |
| GARAGE TO UNITS BY WAY OF RAMPS FOR THE |
| ENTIRE LENGTH OF TRAVEL. THIS COMMENT |
| NOW BECOMES A BUILDING COMMENT AS NEC |
| DOES NOT APPLY. IF THERE ARE ANY CHANGES |
| TO DESIGN, PLEASE CORRELATE WITH |
| ELECTRICAL PLANS. |
| |
| 13)NOTE: NOTE: OK |
| |
| 14)NOTE: NOTE: OK. |
| |
| 15)NOTE: NOTE #15 NO,PLEASE SEE NOTE #44 |
| FROM SECOND REVIEW. CIRCUITING FOR SD'S. |
| |
| 16)NOTE: NOTE #16 OK. |
| |
| 17)NOTE: NOTE #17 OK. |
| |
| 18)NOTE: NOTE #18 OK, HOWEVER PLEASE SEE |
| NOTE# 49 FROM 2ND REVIEW. |
| PLEASE ALSO SEE NEW NOTES ABOUT CATV AND |
| TELEPHONE CABINETS. |
| |
| 19)NOTE: NOTE #19 NO, PLEASEUNIT "M" |
| STILL INDICATES AN ADDITIONAL PANEL, |
| SEEM S TO BE A MISPRINT/OVERLAY PROBLEM. |
| PANEL IN "LT GRAY". |
| |
| 20)NOTE: NOTE #20 OK, SEE PREVIOUS NOTE |
| FOR PANEL IN UNIT "M". |
| |
| 21)NOTE: NOTE #21 OK. |
| |
| 22)NOTE: NOTE #22 NO, PLEASE SEE MANY |
| UNITS HAVE BEEN REDLINED FOR AREAS IN |
| QUESTION. PLEASE SEE 210.52C1-5 FOR |
| REQUIRED LOCATIONS OF GFI RECEPTS ALONG |
| KITCHEN COUNTERSPACES, INCLUDING |
| PENINSULARS AND " SEPARATE SPACES". |
| 210.52C2,4 |
| PLEASE SEE MANY OF THESE WERE CORRECTED |
| AND RECEPTS WERE ADDED, HOWEVER PLEASE |
| SEE PLANS WHICH HAVE BEEN REDLINED FOR |
| OTHER LOCATIONS. |
| PLEASE SEE UNITS, V-1,E-1,A,J,H,P,P1,U, |
| O, N. |
| |
| 23)NOTE: NOTE #23 NO, COULD NOT LOCATE |
| NOTE REQUESTED FOR SD PLACEMENT ON |
| PLANS. |
| PLEASE CLARIFY WHERE THIS IS. |
| PLEASE SEE RESPONSE LTR MENTIONS NOTE |
| ADDED TO FIRE ALARM SHEET. |
| PLEASE SEE E0.01, WHICH DID HAVE A NOTE |
| FOR 3' MIN CLEARENCE FROM AIR DIFFUSERS, |
| HOWEVER, PLEASE LIST 3' MIN FROM BATH |
| AND KITCHEN DOORS, 20' FROM COOKING |
| APPLIANCES. PLEASE SEE THERE ARE SD'S |
| SHOWN W/IN 3' OF BATHROOM DOORS. |
| PLEASE SEE REFERENCE TO NFPA-72 WAS |
| INCORRECT. PLEASE SEE PROJECT WAS |
| SUBMITTED FOR PERMIT AFTER JAN 1ST 2005, |
| WHICH BRINGS NFPA-72 TO THE 2002 |
| EDITION.PLEASE SEE CHAPTER 11.8.3.5 |
| INSTALLATION SPEACIFICS. |
| WRONG CODE WAS REFERENCED DUE TO PLANS |
| ONLY BEING SUBMITTED FOR "PLAN REVIEW" |
| BEFORE THE CODE CHANGE. THE REQUIREMENTS |
| HAVE NOT CHANGED FOR THIS, ONLY THE |
| CHAPTER NUMBER. |
| PLEASE SEE NEW COMMENTS PERTAINING TO |
| 2003 NFPA-101 |
| |
| 24)NOTE: NOTE #24 OK. |
| |
| 25)NOTE: NOTE #25 OK, NO JACUZZI TUBS AT |
| THIS TIME PER ENGINNER. |
| |
| 26)NOTE: NOTE #26NO. PLEASE SEE NOTE |
| WAS ADDED FOR FIRE PUMP AND LOCKED |
| ROTOR, HOWEVER PLEASE SEE NO SPECS WERE |
| SUBMITTED FOR FIRE PUMP OR FIRE PUMP |
| CPNTROLLER. PLEASE ALSO SEE OTHER |
| COMMENTS FROMFIRST AND SECOND REVIEW |
| AND THIS REVIEW WHICH REQUESTED THIS |
| WILL BE THE THIRD REVIEW REQUESTING |
| THESE TO BE SUBMITTED IN TO REVIEW THESE |
| DEVICES FOR CODE COMPLIANCE. |
| ********SEE NEW NOTES FOR THIS**** |
| |
| 27)NOTE: NOTE #27 NO, PLEASE SEE ABOVE |
| NOTE. PLEASE SEE NO SPECS FOR GENERATOR, |
| SUB BASE FUEL TANK ATS WERE SUBMITTED. |
| PLEASE SEE ABOVE NOTE AND NEW NOTES FOR |
| 3RD REVIEW. |
| PLEASE SEE NEW NOTES FOLLOWING. |
| |
| 28)NOTE: NOTE #28 OK. |
| |
| |
| 29)NOTE: NOTE #29 OK. |
| |
| 30)NOTE: NOTE #30 OK. |
| PLEASE SEE NEW NOTES: |
| |
| 31)NOTE: NO, PLEASE SEE RESPONSE LTR |
| MENTIONS "WILL COMPLY" HOWEVER PLEASE |
| SEE NEW NOTES PERTAINING TO NOTES ON |
| PLANS AND SPECS. |
| NO SEE NEW NOTES FROM SECOND REVIEW AND |
| NEW FROM THIRD REVIEW. |
| |
| 32)NOTE: NOTE #32 OK, (NO)NOTE ADDED , |
| GENERATOR WILL NOT BE SEPARATELY |
| DERIVED. THIS WILL BE VERIFIED ONCE |
| MANUFACTURE SPECS ARE SUBMITTED. |
| SEE NEW NOTES AND PREVIOUS NOTES WITH |
| RESPECT TO SHEETS FOR ALL REQUESTED |
| EQUIPMENT AND CORRELATING WITH PLANS AND |
| CODE COMPLIANCE. |
| |
| 33)NOTE: NOTE #33 OK. |
| |
| 34)NOTE: NOTE #34 NO, PLEASE SEE RISER |
| DIAGRAM STILLDOES NOT INCLUDE A |
| REDUCED "KEYED NOTES" OR RECDUCED |
| "FEEDER SCHEDULE FOR REFERENCE WITHOUT |
| HAVING TO TURN BACK AND FORTH FROM RISER |
| DIAGRAM PAGE TO E-6.13. |
| PLEASE SEE ONLY "KEYED NOTES ARE ON |
| RISER SHEETS. PLEASE SEE REDLINED SET OF |
| PLANS IN-WHICH A COPY OF THE FEEDER |
| SCHEDULE WAS REDUCED AND PLACED ON RISER |
| SHEETS 6.13. |
| PLEASE MAKE CHANGES TO THIS , PLEASE SEE |
| NEW COMMENTS PERTAINING TO "F" SCHEDULE |
| AND CORRELATION WITH RISER AND PANEL |
| SCHEDULES. |
| 2ND PART TO NOTE#34, NO. PLEASE SEE |
| NEW COMMENTS AS RISERS, BUS DUCT ETC |
| STILL DO NOT CORRELATE. |
| |
| 35)NOTE: NOTE #35 OK. |
| |
| 36)NOTE: NOTE # 36 OK. |
| |
| 37)NOTE: NOTE #37 OK, PLEASE SEE |
| FOLLOWING COMMENT WHICH STILL NEEDS TO |
| BE ADDRESSED. |
| |
| 38)NOTE: NOTE #38 NO, PLEASE SEE |
| PANELS STILL SHOWN AS 200A WITH 225A OCP |
| FEEDING PANEL(S). |
| PLEASE SEE PANEL FOR UNIT "M". |
| |
| 39)NOTE: NOTE #39 NO, PLEASE SEE WATER |
| HEATERS SHOWN WITH 2P50A OCP FOR 4500VA |
| UNITS ON #10 AWG.PLEASE SEE PANEL |
| SCHEDULES, PANEL SCHEDULE "S" STILL |
| SHOWS 50A OCP FOR 4.5KW WATER HEATER. |
| PLEASE SEE NEW COMMENTS PERTAINING TO |
| PANEL FOR UNIT "N". |
| PLEASE SEE 422.13,422.11,240.4, 310.16 |
| ETC. |
| |
| *************************************** |
| NEW NOTES FOR REVIEW ** (2ND REVIEW) **. |
| |
| 40)NOTE: OK. |
| |
| 41)NOTE: OK, PLEASE SEE AN EMERGENCY |
| BATTERY BACK UP TYPE OF FIXTURE WILL BE |
| REQUIRED FOR FIRE COMMAND ROMM. SEE THIS |
| AS NEW NOTE. |
| |
| 42)NOTE: NO, PLEASE SEE SOME UNITS FOR |
| 2' OF WALL SPACE REDLINED AT LOCATIONS. |
| (KITCHENS WALL SPACE 2' OR MORE. MOST |
| BEDRM WERE DONE, PLEASE SEE ANY POSSIBLE |
| LOCATIONS REDLINED FOR THESE. |
| PLEASE SEE P, P1, P2. |
| |
| 43)NOTE: OK, NO FAN FOR DRYER TO BE |
| ADDED PER ENGINEER. |
| |
| 44)NOTE: NO,PLEASE SEE MANY UNITS WHERE |
| CIRCUITING WAS UPDATED DUE TO PREVIOUS |
| COMMENTS FOR ARC FAULT PROTECTION, |
| HOWEVER PLEASE SEE NOW MANY SMOKE |
| DETECTORS ARE BEINGSHOWN TWO DIFFERENT |
| CIRCUITS IN THE SAME UNITS. PLEASE SEE |
| NFPA-72 11.5.1.1 WHICH REQUIRES SD'S TO |
| BE WIRED "IN-LINE". MUTIPLE CIRCUITS FOR |
| SD'S CAN NOT BE DONE. |
| 2002 NEC 210.12 PLEASE BE SURE ARC FAULT |
| CIRCUITS STILL CORRELATE AFTE UPDATING |
| ANY CIRCUITING. |
| PLEASE SEE ALL "OUTLETS" INCLUDING SD'S, |
| LTS, FANS AND RECEPTS REQUIRED THIS. |
| PLEASE SEE MANY OF THESE CIRCUIT #'S |
| HAVE BEEN REDLINED ON PLANS, BUT NOT |
| ALL. SEE UNITS, 15,V, V1, L, K, G, |
| M,J,,, |
| |
| 45)NOTE: OK. FIXTURES REMOVED. |
| |
| 46)NOTE: OK, FIXTURE TYPE NOTED. |
| |
| 47)NOTE: OK. |
| |
| 48)NOTE: OK. |
| |
| 49)NOTE:OK. |
| |
| 49)NOTE:YE/ NO,PLEASE SEE MOST UNITS |
| HAVE BEEN REVISED TO RE-LOCATE THESE |
| PANELS, HOWEVER PLEASE SEE UNIT "Q" |
| WHICH SHOWS THESE INWHAT APPEARS TO BE |
| THE LINEN CLOSET. |
| PLEASE SEE MANY CLOTHES CLOSETS |
| CONTAINING COMBUSTIBLES ARE SHOWN WITH |
| CATV AND TELEPHONE CABINETS. PLEASE SEE |
| IF THESE UNITS WILL REQUIRE ANY "LV |
| PLUG-IN" TYOE TRANSFORMERS THEN THESE |
| RECEPTS WHICH ARE NOT SHOWN AT THIS TIME |
| WOULD ONLY BE ALLOWED DIRECTLY OVER |
| DOORS. |
| |
| 50)NOTE:NO, PLEASE SEE2002 210.8B3 |
| FOR KITCHENS IN OTHER THAN DWELLING |
| UNITS WHICH REQUIRES ALL 15- AND |
| 20-AMPERE, 125-VOLT RECEPTACLES IN |
| NON-DWELLING-TYPE KITCHENS TO BE GFCI |
| PROTECTED. THIS REQUIREMENT APPLIES TO |
| EACH AND EVERY 15- AND 20-AMPERE, |
| 125-VOLT KITCHEN RECEPTACLE, WHETHER OR |
| NOT THE RECEPTACLE SERVES COUNTERTOP |
| APPLIANCES. |
| THIS WOULD BE FOR "HOUSE KITCHEN". |
| |
| 51)NOTE: OK, PLEASE SEE NOTES PERTAING |
| TO 210.52, 210.52C1-5 |
| |
| 52)NOTE: OK. |
| SEE NOTE WHICH WILL REQUIRE THE BATTERY |
| BACK UP FIXTURE. |
| |
| 53)NOTE: OK, HOWEVER NOTES WITH RESPECT |
| TO SPECS,/MANUFACTURE CUT SHEETS. PLEASE |
| ALSO NEW NOTES WITH RESPECT TO DPHE. |
| |
| 54)NOTE: OK. |
| |
| 55)NOTE: OK, DETAIL SUBMITTED WHICH |
| NOTES NEW GROUNDING TO BLDG GROUNDING |
| ELECTRODE SYSTEM. |
| |
| 56)NOTE: OK, PLEASE KNOW, INFORMATION |
| FOR ALL THIS ELEVATOR |
| EQUIPMENT.DISCONNECTS ETC WILL BE |
| REQUIRED TO BE REVISED BEFORE |
| INSPECTIONS. NO CORRECTIONS NEEDED AT |
| THIS TIME. |
| |
| 57)NOTE: OK. |
| |
| 58)NOTE: OK, HOWEVER SEE NEW NOTES TO |
| FIRE PUMP FEEDERS NOW INDICATED. |
| |
| 59)NOTE: NO, PLEASE SEE BUST DUCTKEY |
| NOTES ON 6.02 AND 6.03. PLEASE SEE K-3 |
| WHICH MENTIONS CORRECTION, HOWEVER |
| PLEASE SEE "K-7" WHICH SHOWS OLD. PLEASE |
| SEE "SPEC BOOK", 16465 |
| 2.2C WHICH MENTIONS ALUM BUS-DUCT WAS |
| NOT REVISED. |
| PLEASE SEE PREVIOUS NOTES IN REFERENCE |
| TO EQUIPMENT GROUNDING METHOD OF |
| BUS-DUCT. DOES THIS BUS-DUCT CONTAIN A |
| SEPARATE ALUM BUS FOR GROUNDING? OR IS |
| THE EQUIPMENT GROUNDING THAT IS GOING TO |
| BE USED "PART" OF THE BUS-DUCT. |
| *************************************** |
| PLEASE SEE 2ND PART OF THIS NOTE COULD |
| NOT BE LOCATED ON PLANS? |
| *************************************** |
| PLEASE ALSO PLACE NOTE ON PLANS FOR |
| REQUIRED CURBS FOR FLOOR PENATRATIONS. |
| PER 368.6BFLOOR PENETRATIONS SHALL |
| COMPLY WITH (1) AND (2): |
| BUSWAYS SHALL BE PERMITTED TO BE |
| EXTENDED VERTICALLY THROUGH DRY FLOORS |
| IF TOTALLY ENCLOSED (UNVENTILATED) WHERE |
| PASSING THROUGH AND FOR A MINIMUM |
| DISTANCE OF 1.8 M (6 FT) ABOVE THE FLOOR |
| TO PROVIDE ADEQUATE PROTECTION FROM |
| PHYSICAL DAMAGE. |
| IN OTHER THAN INDUSTRIAL ESTABLISHMENTS, |
| WHERE A VERTICAL RISER PENETRATES TWO OR |
| MORE DRY FLOORS, A MINIMUM 100 MM (4 |
| IN.) HIGH CURB SHALL BE INSTALLED AROUND |
| ALL FLOOR OPENINGS FOR RISER BUSWAYS TO |
| PREVENT LIQUIDS FROM ENTERING THE |
| OPENING. THE CURB SHALL BE INSTALLED |
| WITHIN 300 MM (12 IN.) OF THE FLOOR |
| OPENING. ELECTRICAL EQUIPMENT SHALL BE |
| LOCATED SO THAT IT WILL NOT BE DAMAGED |
| BY LIQUIDS THAT ARE RETAINED BY THE |
| CURB. |
| |
| 60)NOTE: NO, THIS WAS NOT CORRECT. |
| PLEASE SEE "SPEC BOOK" 16120 |
| 2.3A5, PLEASE SEE COLOR CODING FOR |
| 277/480V SHALL BE BROWN, PURPLE, YELLOW. |
| 215.8 LOCAL AMENDMENTS. |
| |
| 61)NOTE:OK. |
| |
| 62)NOTE: OK. |
| HOWEVER PLEASE SEE NEW NOTES. |
| |
| 63)NOTE: OK. |
| HOWEVER SEE NEW NOTES. |
| |
| 64)NOTE:OK. |
| |
| 65)NOTE: OK. |
| SEE NEW NOTES FOR OTHER "F" FEEDER |
| SCHEDULE AND CORRELATION WITH PANE |
| SCHEDULES.L |
| |
| 66)NOTE: OK. |
| |
| 67)NOTE: OK, HOWEVER GEN INFORMATION, |
| FUEL SUB-BASE TANK STILL NOT SUBMITTED. |
| |
| |
| 68)NOTE:NO, SPECS FOR FIRE PUMP |
| CONTROLLER ETCRATING S STILL TO BE |
| VERIFIED.PLEASE SUBMIT AIC RATINGS FOR |
| ALL NEW SERVICE EQUIPMENT BEING INSTALL- |
| ED. MAINS/BRKRS AND PANELS ARE ALL TO BE |
| RATED FOR THE AVAILABLE FAULT CURRENT. |
| PER 110.9/215.5 |
| AIC RATINGS SHOULD BE NOTED ON ALL |
| EQUIPMENT. |
| |
| 69)NOTE:OK, ENGINEER'S RESPONSE LETTER |
| MENTIONS, "LIGHTNING PROTECTION SYSTEM" |
| WILL BE UNDER SEPARATE PERMITS. |
| PLEASE SEE ALL INFORMATION FOR |
| |
| 70)NOTE: NO, INFORMATION NEEDS TO BE |
| SUBMITTED FOR VERIFICATION OF CODE |
| COMPLIANCE WITH SAID SYSTEMS.PLEASE ALSO |
| SEEIF ALL INFORMATION FOR FIRE PUMP, |
| FIRE PUMP CONTROLLER,GENERATOR, ATS, |
| ETC WAS NOT SUBMITTED FOR REVIEW WITH |
| BASE BLDG. |
| PLEASE SEE FIRE REVIEW COMMENTS. |
| |
| 71)NOTE: OK, NO RESPONSE NEEDED. |
| |
| 72)NOTE:OK. NO RESPONSE NEEDED. |
| |
| 73)NOTE: PLEASE KNOW, AS NOTED IN SOME |
| NOTES, DUE TO SOME INFORMATION MISSING |
| ON PLANS AND WITH PLANS, SOME COMMENTS |
| ARE NEW AND SOME ARE REPEAT. |
| *************************************** |
| |
| 3RD REVIEW |
| NEW COMMENTS/AND REPEAT COMMENTS WITH |
| FURTHER EXPLANATION IN ORDER FOR |
| COMMENTS TO BE ADDRESSED FOR A FINAL |
| REVIEW. |
| |
| |
| 74) NOTE: PLEASE SEE PREVOUS NOTES |
| PERTAINING TO BUS DUCT. |
| PLEASE CORRELATE BUS-DUCT SIZES ON RISER |
| DIAGRAM AND BLDG RISER UP THROUGH THE |
| BLDG. |
| A) PLEASE SEE MAIN RISER NOW HAS BEEN |
| REVISED FOR BUS-STABS INTO FPL VAULT FOR |
| MAINS, HOWEVER PLEASE NOW SEE 1SMCN AND |
| 2SMCN WHICH SHOWS 4000A BUS-DUCT INTO |
| BOTH 3000A MAINS. (SEE KEY NOTE K-4) |
| THIS OK, HOWEVER PLEASE CORRECT OF |
| INDEED ONLY 3000A BUS IS GOING TO BE |
| USED. |
| B) PLEASE SEE 6.02, AND 6.03 FOR "KEY |
| NOTES". PLEASE SEE 6.02 HAS NOW BEEN |
| REVISED FOR 1SMCN RISER WHICH CONTAINS |
| REVISION "K-3", PLEASE SEE THIS WAS |
| CHANGED TO 4000A ON A 3000A MAIN, THIS |
| IS OK, HOWEVER PLEASE SEE 6.03 "KEY |
| NOTE" FOR SAME BUS DUCT RISER. PLEASE |
| SEE KEY NOTES REF K-7 FOR THE SAME RISER |
| WHICH IS SHOWN AS 3000A'S?? |
| PLEASE VERIFY SIZING OF BUST DUCT 3OR 4K |
| AND IF THERE ARE TWO DIFFERENT SIZES |
| BEING INSTALLED FOR THIS 3K MAIN.? |
| PLEASE SEEFEEDERS AS NOTED ARE FOR |
| 3000A'S. |
| |
| 75)NOTE: PLEASE SEE PREVIOUS NOTED A |
| REQUEST TO PROVIDE "FEEDER SCHEDULE" ON |
| RISER DIAGRAM AND TO NOTES TO CORRELATE |
| FEEDERS. |
| PLEASE SEE THE FOLLOWING: |
| |
| A) DPHREL, SHOWS F-9 ON RISER, F-10 ON |
| PANEL SCHEDULE AND F-10 ON SHE. REDLINED |
| LOCATION. |
| |
| B)DPHRE, SHOWS F-11 ON RISER, F-13 ON |
| PANEL SCHEDULE. REDLINED LOCATION. |
| |
| C)DPHRN, SHOWS F-4 ON RISER, F-5 ON SHN, |
| REDLINED LOCATION. PLEASE NOTE F-4 IS |
| FOR 2500A'S? |
| |
| D)HRHN, SHOWS F-15 ON RISER, F-19 ON |
| SHN, REDLINED LOCATION. |
| |
| E)HGME, SHOWS BLANK ON RISER, SHOWS F-12 |
| ON PANEL SCHEDULE DPHE. |
| |
| F)H5ME, SHOWS F-18 ON RISER, SHOWS F-20 |
| ON DPHE, REDLINED LOCATION. |
| |
| G)FIRE PUMP FEEDERS, F-10 INDICATE AN |
| "EQUIPMENT GROUNDING CONDUCTOR" FROM |
| FPL. PLEASE SEE 250.6 AND EQUIPMENT |
| GROUNDING CONDUCTOR IS ONLY INSTALLED |
| AFTER THE FIRST MEANS OF DISC. |
| (IT IS NOTED, FEEDERS NOT TO HAVE EQP |
| GRND). |
| PLEASE SEE FEEDERS LISTED AS K-24 WHICH |
| INDICATES 6-SETS OF 3-3/0'S AND 3/0 GRND |
| FOR FEEDERS TO FIRE PUMP FROM FIRE PUMP |
| CONTROLLER?? PLEASE VERIFY THE SIZES AND |
| NUMBER OF PARALLEL RUNS. |
| |
| H)SHN AND SHE ON RISER DIAGRAM INDICATES |
| A "BUS-STAB" INOT FPL VAULT, HOWEVER, |
| PANEL SCHEDULES FOR EACH OF THESE ON |
| 7.12 INDICATES "FEEDERS" AS F-3 AND F-6. |
| PLEASE CORRELATE, LOCATION REDLINED. |
| |
| 76)NOTE: PLEASE SEE SPECS FOR ATS NOT |
| SUBMITTED TO VERIFY MEANS OF DISCONNECT, |
| MANUAL, LOCATED ON OUTSIDE OF EQUIPMENT |
| ETC. |
| PLEASE SEE DPHE WILL BE REQUIRED TO HAVE |
| A MAIN CIRCUIT BREAKER FOR SERVICE |
| DISCONNECT FROM FPL AND GENERATOR. |
| THIS WAS REDLINED ON SETS FROM PREVIOUS |
| REVIEW, BUT UNABLE TO VERIFY MEANS OF |
| DISCONNECT FROM OTHER REVIEWS DUE TO NO |
| SPECS ETC SUBMITTED FOR ATS. |
| NO OCP COULD BE LOCATED FOR SEC'S COMING |
| INOT BLDG FROM FPL ON THIS. |
| 230.70,230.76,230.79,230.72,240.4. |
| |
| 77)NOTE: PLEASE KNOW, PLANS WERE |
| SUBMITTED ONLY FOR "PLAN REVIEW" BEFORE |
| JAN 1ST, 2005 AND NOT FOR PERMIT |
| APPLICATION.. PLEASE SEE NFPA-72 AND 101 |
| AND FIRE CODES CHANGE AT THAT TIME. |
| PLEASE SEE NFPA 101 REFERENCES A 1999 |
| EDITION. EVEN IF UNDER THE OLD CODE, |
| THIS WOULD BE 2000 EDITION OF 101, |
| HOWEVER PERMIT APPLICATIONS AFTER JAN |
| 1ST , WOULD PLACE THIS PROJECT UNDER THE |
| 2002 NFPA-72 AND 2003 NFPA-101. |
| |
| 78)NOTE: PLEASE SEE CHANGES TO PREVIOUS |
| NOTES FOR WATER HEATERS SHOWING OCP AT |
| 50A'S FOR A 4.5KW UNIT. PLEASE SEEUNIT |
| "N" WHICH NOW SHOWS SECOND WATER HEATER |
| AS A "BLANK" FOR OCP ETC. |
| PLEASE SEE LOAD CALCULATIONS AND PLANS |
| STILL INDICATE TWO UNITS. |
| PLEASE ADJUST AND CORRELATE. |
| |
| 79)NOTE: PLEASE SEE PANEL SCHEDULE FOR |
| UNIT D-2 COULD NOT BE LOCATED. |
| PLEASE CLARIFY IF THIS IS A DIFFERENT |
| PANEL. UNITS "D" AND D-1 ARE SUBMITTED. |
| |
| 80)NOTE: PLEASE SEELAUNDRY RMS IN SOME |
| UNITS INDICATE THE CIRCUIT PROVIDED FOR |
| WASHER ALSO FEEDING THE ADDITIONAL GFI |
| IN THE SAME RM? PLEASE SEE LOADING FOR |
| CIRCUITING AS A DEDICATED CIRUIT AND NO |
| OTHER RECEPTS ON THAT CIRCUIT SHOULD BE |
| VERIFIED. |
| LOAD FOR WASHER UNIT CAN NOT BE |
| VERIFIED. |
| PLEASE SEE 210.11C2 |
| |
| 81)NOTE: PLEASE SEENFPA-101 7-9 UNDER |
| THE 2003. WHICH WOULD REQUIRE MUTIPLE |
| CIRCUITS FEEDING EM LTS IN STAIR TOWERS. |
| PLEASE KNOW THE AHJ/ FIRE MARSHAL'S |
| OFFICE HAS DETERMIND EITHER EVERY OTHER |
| EM LT TO ALTERNATE CIRUITS OR A BATTERY |
| BACK UP FIXTURE AT EVERY OTHER LEVEL |
| WOULD BE REQUIRED FOR EGRESS IN STAIR |
| TOWER. PLEASE KNOW, IF BLDG IS UNDER |
| GENERATOR/ EM POWER AND A TRIPPING OF A |
| SINGLE BRKR , EITHER BRANCH CIRCUIT OR |
| MAIN, THIS WOULD PLACE STAIR TOWER(S) IN |
| TOTAL DARKNESS. TO ALLEAVIATE ANY OF |
| ALTERNATING CIRCUITS, OR TRIPPING OF ANY |
| OVERCURRENT PROTECTION DEVICE, A BATTERY |
| BACK-UP TYPE OF FIXTURE WOULD BE |
| REQUIRED TO PROVIDE A MIN OF .1 FT |
| CANDLE AS LISTED UNDER 7.9.2.1, |
| 7.9.2.2, 7.8.1.2. |
| THIS COMMENT CAN BE SET UP AS A |
| "PROVISO"TO REVISE BEFORE ROUGH OR CAN |
| BE ADDRESSED AT THIS TIME. PLEASE CALL |
| TO GO OVER. |
| |
| 82)NOTE: PLEASE SEE ATTACHED COPY OF FS |
| 553.80(2)(B) IS GIVEN ASNOTICE ONLY. |
| |
| PLEASE BE SURE TO SEE ANY COMMENTS FROM |
| OTHER TRADES WHICH MAY AFFECT ELECTRICAL |
| PLANS. |
| |
| PLEASE BE SURE TO REMOVED ALL OLD/ |
| VOIDED SHEETS AND ONLY INSERT NEW |
| REVISED SHEETS INTO TWO COMPLETE SETS |
| FOR REVIEW AND STAMPING. |
| ONE COMPLETE SET OF OLD/VOIDED SHEETS |
| SHOULD BE SUBMITTED FOR REFERENCE. |
| |
| PLEASE SUBMIT ALL OF THE ABOVE |
| INFORMATION FOR REVIEW. IF THERE ARE ANY |
| QUESTIONS, PLEASE DO NOT HESITATE IN |
| CONTACTING THIS OFFICE. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |
| |
| PLEASE SEE ANY COMMENTS FROM O |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
2005-09-06 00:00:00 | PLANS WILL GO INTO A "F" STATUS. |
| |
| PLAN REVIEW NOTES TO FOLLOW, PLAN REVIEW |
| AND NOTES IN PROGRESS. |
2005-09-04 00:00:00 | ELECTRICAL PLANSONLY ARE AT DP'S DESK |
| FOR REVIEW. |
| REVIEW TO CONTINUE,,,, STOPPED FOR 9/4 |
2005-08-24 00:00:00 | REVISION TO THE TEMPORARY POWERJL |