2005-09-07 00:00:00************ UNSAT 3ND REVIEW *********
  
 PLEASE SEENOTES FROM PREVIOUS
 REVIEW STILL NEED TO BE ADDRESSED.
  
 PLEASE ALSO SEESOME NEW NOTES.
  
 ***************************************
 PLEASE SEE FIRST AND SECOND PART OF
 NOTES IS DIRECTLY TAKEN FROM FIRST TWO
 REVIEW. PART 3 WILL BE NEW NOTES.
 ***************************************
  
 1)NOTE: NOTE #1, OK, HOWEVER PLEASE SEE
 NOTE #19FROM SECOND REVIEW WHICH STILL
 HAS ONE COMMENT.
  
 2)NOTE: NOTE #2 OK
  
 3)NOTE: NOTE #3 OK
  
 4)NOTE: NOTE #4 OK.
  
 5)NOTE: NOTE #5 OK ON PREVIOUS REVIEW,
 HOWEVER PLEASE NOW SEE 2.04 WHICH SHOWS
 BOTH FPL VAULT AND MAIN ELECTRICAL RM
 BEING THE SAME ROOM?
  
 6)NOTE: NOTE #6 OK, NO, PLEASE SEE
 RESPONSE LTR FROM ENGINEER STATES
 SIGNAGE AND LOCATIONS, HOWEVER PLEASE
 SEE NOTES ADDED TO PLANS SEEMS TO HAV
 MISSED /OR HAVE FIRE COMMAND ROOM
 REMOVED FROM NOTE. PLEASE SEE NOTE FOR
 "ARC FLASH" COULD NOT BE LOCATED.
  
 7)NOTE: NOTE #7,OK
  
 8)NOTE: NOTE #8 OK. CORRECT, ADDED
 CIRCUITS.
  
 9)NOTE: NOTE #9 OK.
  
 10)NOTE: NOTE #10 OK,
 PLEASE SEE NEW NOTES PERTAINING TO FIRE
 ALAEM SHEETS AND CODES REFEERNCED.
  
 11)NOTE: NOTE #11 OK.
  
 12)NOTE: NOTE #12 OK, ARCHITECTURUAL
 RESPONSE MENTIONS FULL ACCESSIBILTY FROM
 GARAGE TO UNITS BY WAY OF RAMPS FOR THE
 ENTIRE LENGTH OF TRAVEL. THIS COMMENT
 NOW BECOMES A BUILDING COMMENT AS NEC
 DOES NOT APPLY. IF THERE ARE ANY CHANGES
 TO DESIGN, PLEASE CORRELATE WITH
 ELECTRICAL PLANS.
  
 13)NOTE: NOTE: OK
  
 14)NOTE: NOTE: OK.
  
 15)NOTE: NOTE #15 NO,PLEASE SEE NOTE #44
 FROM SECOND REVIEW. CIRCUITING FOR SD'S.
  
 16)NOTE: NOTE #16 OK.
  
 17)NOTE: NOTE #17 OK.
  
 18)NOTE: NOTE #18 OK, HOWEVER PLEASE SEE
 NOTE# 49 FROM 2ND REVIEW.
 PLEASE ALSO SEE NEW NOTES ABOUT CATV AND
 TELEPHONE CABINETS.
  
 19)NOTE: NOTE #19 NO, PLEASEUNIT "M"
 STILL INDICATES AN ADDITIONAL PANEL,
 SEEM S TO BE A MISPRINT/OVERLAY PROBLEM.
 PANEL IN "LT GRAY".
  
 20)NOTE: NOTE #20 OK, SEE PREVIOUS NOTE
 FOR PANEL IN UNIT "M".
  
 21)NOTE: NOTE #21 OK.
  
 22)NOTE: NOTE #22 NO, PLEASE SEE MANY
 UNITS HAVE BEEN REDLINED FOR AREAS IN
 QUESTION. PLEASE SEE 210.52C1-5 FOR
 REQUIRED LOCATIONS OF GFI RECEPTS ALONG
 KITCHEN COUNTERSPACES, INCLUDING
 PENINSULARS AND " SEPARATE SPACES".
 210.52C2,4
 PLEASE SEE MANY OF THESE WERE CORRECTED
 AND RECEPTS WERE ADDED, HOWEVER PLEASE
 SEE PLANS WHICH HAVE BEEN REDLINED FOR
 OTHER LOCATIONS.
 PLEASE SEE UNITS, V-1,E-1,A,J,H,P,P1,U,
 O, N.
  
 23)NOTE: NOTE #23 NO, COULD NOT LOCATE
 NOTE REQUESTED FOR SD PLACEMENT ON
 PLANS.
 PLEASE CLARIFY WHERE THIS IS.
 PLEASE SEE RESPONSE LTR MENTIONS NOTE
 ADDED TO FIRE ALARM SHEET.
 PLEASE SEE E0.01, WHICH DID HAVE A NOTE
 FOR 3' MIN CLEARENCE FROM AIR DIFFUSERS,
 HOWEVER, PLEASE LIST 3' MIN FROM BATH
 AND KITCHEN DOORS, 20' FROM COOKING
 APPLIANCES. PLEASE SEE THERE ARE SD'S
 SHOWN W/IN 3' OF BATHROOM DOORS.
 PLEASE SEE REFERENCE TO NFPA-72 WAS
 INCORRECT. PLEASE SEE PROJECT WAS
 SUBMITTED FOR PERMIT AFTER JAN 1ST 2005,
 WHICH BRINGS NFPA-72 TO THE 2002
 EDITION.PLEASE SEE CHAPTER 11.8.3.5
 INSTALLATION SPEACIFICS.
 WRONG CODE WAS REFERENCED DUE TO PLANS
 ONLY BEING SUBMITTED FOR "PLAN REVIEW"
 BEFORE THE CODE CHANGE. THE REQUIREMENTS
 HAVE NOT CHANGED FOR THIS, ONLY THE
 CHAPTER NUMBER.
 PLEASE SEE NEW COMMENTS PERTAINING TO
 2003 NFPA-101
  
 24)NOTE: NOTE #24 OK.
  
 25)NOTE: NOTE #25 OK, NO JACUZZI TUBS AT
 THIS TIME PER ENGINNER.
  
 26)NOTE: NOTE #26NO. PLEASE SEE NOTE
 WAS ADDED FOR FIRE PUMP AND LOCKED
 ROTOR, HOWEVER PLEASE SEE NO SPECS WERE
 SUBMITTED FOR FIRE PUMP OR FIRE PUMP
 CPNTROLLER. PLEASE ALSO SEE OTHER
 COMMENTS FROMFIRST AND SECOND REVIEW
 AND THIS REVIEW WHICH REQUESTED THIS
 WILL BE THE THIRD REVIEW REQUESTING
 THESE TO BE SUBMITTED IN TO REVIEW THESE
 DEVICES FOR CODE COMPLIANCE.
 ********SEE NEW NOTES FOR THIS****
  
 27)NOTE: NOTE #27 NO, PLEASE SEE ABOVE
 NOTE. PLEASE SEE NO SPECS FOR GENERATOR,
 SUB BASE FUEL TANK ATS WERE SUBMITTED.
 PLEASE SEE ABOVE NOTE AND NEW NOTES FOR
 3RD REVIEW.
 PLEASE SEE NEW NOTES FOLLOWING.
  
 28)NOTE: NOTE #28 OK.
  
  
 29)NOTE: NOTE #29 OK.
  
 30)NOTE: NOTE #30 OK.
 PLEASE SEE NEW NOTES:
  
 31)NOTE: NO, PLEASE SEE RESPONSE LTR
 MENTIONS "WILL COMPLY" HOWEVER PLEASE
 SEE NEW NOTES PERTAINING TO NOTES ON
 PLANS AND SPECS.
 NO SEE NEW NOTES FROM SECOND REVIEW AND
 NEW FROM THIRD REVIEW.
  
 32)NOTE: NOTE #32 OK, (NO)NOTE ADDED ,
 GENERATOR WILL NOT BE SEPARATELY
 DERIVED. THIS WILL BE VERIFIED ONCE
 MANUFACTURE SPECS ARE SUBMITTED.
 SEE NEW NOTES AND PREVIOUS NOTES WITH
 RESPECT TO SHEETS FOR ALL REQUESTED
 EQUIPMENT AND CORRELATING WITH PLANS AND
 CODE COMPLIANCE.
  
 33)NOTE: NOTE #33 OK.
  
 34)NOTE: NOTE #34 NO, PLEASE SEE RISER
 DIAGRAM STILLDOES NOT INCLUDE A
 REDUCED "KEYED NOTES" OR RECDUCED
 "FEEDER SCHEDULE FOR REFERENCE WITHOUT
 HAVING TO TURN BACK AND FORTH FROM RISER
 DIAGRAM PAGE TO E-6.13.
 PLEASE SEE ONLY "KEYED NOTES ARE ON
 RISER SHEETS. PLEASE SEE REDLINED SET OF
 PLANS IN-WHICH A COPY OF THE FEEDER
 SCHEDULE WAS REDUCED AND PLACED ON RISER
 SHEETS 6.13.
 PLEASE MAKE CHANGES TO THIS , PLEASE SEE
 NEW COMMENTS PERTAINING TO "F" SCHEDULE
 AND CORRELATION WITH RISER AND PANEL
 SCHEDULES.
 2ND PART TO NOTE#34, NO. PLEASE SEE
 NEW COMMENTS AS RISERS, BUS DUCT ETC
 STILL DO NOT CORRELATE.
  
 35)NOTE: NOTE #35 OK.
  
 36)NOTE: NOTE # 36 OK.
  
 37)NOTE: NOTE #37 OK, PLEASE SEE
 FOLLOWING COMMENT WHICH STILL NEEDS TO
 BE ADDRESSED.
  
 38)NOTE: NOTE #38 NO, PLEASE SEE
 PANELS STILL SHOWN AS 200A WITH 225A OCP
 FEEDING PANEL(S).
 PLEASE SEE PANEL FOR UNIT "M".
  
 39)NOTE: NOTE #39 NO, PLEASE SEE WATER
 HEATERS SHOWN WITH 2P50A OCP FOR 4500VA
 UNITS ON #10 AWG.PLEASE SEE PANEL
 SCHEDULES, PANEL SCHEDULE "S" STILL
 SHOWS 50A OCP FOR 4.5KW WATER HEATER.
 PLEASE SEE NEW COMMENTS PERTAINING TO
 PANEL FOR UNIT "N".
 PLEASE SEE 422.13,422.11,240.4, 310.16
 ETC.
  
 ***************************************
 NEW NOTES FOR REVIEW ** (2ND REVIEW) **.
  
 40)NOTE: OK.
  
 41)NOTE: OK, PLEASE SEE AN EMERGENCY
 BATTERY BACK UP TYPE OF FIXTURE WILL BE
 REQUIRED FOR FIRE COMMAND ROMM. SEE THIS
 AS NEW NOTE.
  
 42)NOTE: NO, PLEASE SEE SOME UNITS FOR
 2' OF WALL SPACE REDLINED AT LOCATIONS.
 (KITCHENS WALL SPACE 2' OR MORE. MOST
 BEDRM WERE DONE, PLEASE SEE ANY POSSIBLE
 LOCATIONS REDLINED FOR THESE.
 PLEASE SEE P, P1, P2.
  
 43)NOTE: OK, NO FAN FOR DRYER TO BE
 ADDED PER ENGINEER.
  
 44)NOTE: NO,PLEASE SEE MANY UNITS WHERE
 CIRCUITING WAS UPDATED DUE TO PREVIOUS
 COMMENTS FOR ARC FAULT PROTECTION,
 HOWEVER PLEASE SEE NOW MANY SMOKE
 DETECTORS ARE BEINGSHOWN TWO DIFFERENT
 CIRCUITS IN THE SAME UNITS. PLEASE SEE
 NFPA-72 11.5.1.1 WHICH REQUIRES SD'S TO
 BE WIRED "IN-LINE". MUTIPLE CIRCUITS FOR
 SD'S CAN NOT BE DONE.
 2002 NEC 210.12 PLEASE BE SURE ARC FAULT
 CIRCUITS STILL CORRELATE AFTE UPDATING
 ANY CIRCUITING.
 PLEASE SEE ALL "OUTLETS" INCLUDING SD'S,
 LTS, FANS AND RECEPTS REQUIRED THIS.
 PLEASE SEE MANY OF THESE CIRCUIT #'S
 HAVE BEEN REDLINED ON PLANS, BUT NOT
 ALL. SEE UNITS, 15,V, V1, L, K, G,
 M,J,,,
  
 45)NOTE: OK. FIXTURES REMOVED.
  
 46)NOTE: OK, FIXTURE TYPE NOTED.
  
 47)NOTE: OK.
  
 48)NOTE: OK.
  
 49)NOTE:OK.
  
 49)NOTE:YE/ NO,PLEASE SEE MOST UNITS
 HAVE BEEN REVISED TO RE-LOCATE THESE
 PANELS, HOWEVER PLEASE SEE UNIT "Q"
 WHICH SHOWS THESE INWHAT APPEARS TO BE
 THE LINEN CLOSET.
 PLEASE SEE MANY CLOTHES CLOSETS
 CONTAINING COMBUSTIBLES ARE SHOWN WITH
 CATV AND TELEPHONE CABINETS. PLEASE SEE
 IF THESE UNITS WILL REQUIRE ANY "LV
 PLUG-IN" TYOE TRANSFORMERS THEN THESE
 RECEPTS WHICH ARE NOT SHOWN AT THIS TIME
 WOULD ONLY BE ALLOWED DIRECTLY OVER
 DOORS.
  
 50)NOTE:NO, PLEASE SEE2002 210.8B3
 FOR KITCHENS IN OTHER THAN DWELLING
 UNITS WHICH REQUIRES ALL 15- AND
 20-AMPERE, 125-VOLT RECEPTACLES IN
 NON-DWELLING-TYPE KITCHENS TO BE GFCI
 PROTECTED. THIS REQUIREMENT APPLIES TO
 EACH AND EVERY 15- AND 20-AMPERE,
 125-VOLT KITCHEN RECEPTACLE, WHETHER OR
 NOT THE RECEPTACLE SERVES COUNTERTOP
 APPLIANCES.
 THIS WOULD BE FOR "HOUSE KITCHEN".
  
 51)NOTE: OK, PLEASE SEE NOTES PERTAING
 TO 210.52, 210.52C1-5
  
 52)NOTE: OK.
 SEE NOTE WHICH WILL REQUIRE THE BATTERY
 BACK UP FIXTURE.
  
 53)NOTE: OK, HOWEVER NOTES WITH RESPECT
 TO SPECS,/MANUFACTURE CUT SHEETS. PLEASE
 ALSO NEW NOTES WITH RESPECT TO DPHE.
  
 54)NOTE: OK.
  
 55)NOTE: OK, DETAIL SUBMITTED WHICH
 NOTES NEW GROUNDING TO BLDG GROUNDING
 ELECTRODE SYSTEM.
  
 56)NOTE: OK, PLEASE KNOW, INFORMATION
 FOR ALL THIS ELEVATOR
 EQUIPMENT.DISCONNECTS ETC WILL BE
 REQUIRED TO BE REVISED BEFORE
 INSPECTIONS. NO CORRECTIONS NEEDED AT
 THIS TIME.
  
 57)NOTE: OK.
  
 58)NOTE: OK, HOWEVER SEE NEW NOTES TO
 FIRE PUMP FEEDERS NOW INDICATED.
  
 59)NOTE: NO, PLEASE SEE BUST DUCTKEY
 NOTES ON 6.02 AND 6.03. PLEASE SEE K-3
 WHICH MENTIONS CORRECTION, HOWEVER
 PLEASE SEE "K-7" WHICH SHOWS OLD. PLEASE
 SEE "SPEC BOOK", 16465
 2.2C WHICH MENTIONS ALUM BUS-DUCT WAS
 NOT REVISED.
 PLEASE SEE PREVIOUS NOTES IN REFERENCE
 TO EQUIPMENT GROUNDING METHOD OF
 BUS-DUCT. DOES THIS BUS-DUCT CONTAIN A
 SEPARATE ALUM BUS FOR GROUNDING? OR IS
 THE EQUIPMENT GROUNDING THAT IS GOING TO
 BE USED "PART" OF THE BUS-DUCT.
 ***************************************
 PLEASE SEE 2ND PART OF THIS NOTE COULD
 NOT BE LOCATED ON PLANS?
 ***************************************
 PLEASE ALSO PLACE NOTE ON PLANS FOR
 REQUIRED CURBS FOR FLOOR PENATRATIONS.
 PER 368.6BFLOOR PENETRATIONS SHALL
 COMPLY WITH (1) AND (2):
 BUSWAYS SHALL BE PERMITTED TO BE
 EXTENDED VERTICALLY THROUGH DRY FLOORS
 IF TOTALLY ENCLOSED (UNVENTILATED) WHERE
 PASSING THROUGH AND FOR A MINIMUM
 DISTANCE OF 1.8 M (6 FT) ABOVE THE FLOOR
 TO PROVIDE ADEQUATE PROTECTION FROM
 PHYSICAL DAMAGE.
 IN OTHER THAN INDUSTRIAL ESTABLISHMENTS,
 WHERE A VERTICAL RISER PENETRATES TWO OR
 MORE DRY FLOORS, A MINIMUM 100 MM (4
 IN.) HIGH CURB SHALL BE INSTALLED AROUND
 ALL FLOOR OPENINGS FOR RISER BUSWAYS TO
 PREVENT LIQUIDS FROM ENTERING THE
 OPENING. THE CURB SHALL BE INSTALLED
 WITHIN 300 MM (12 IN.) OF THE FLOOR
 OPENING. ELECTRICAL EQUIPMENT SHALL BE
 LOCATED SO THAT IT WILL NOT BE DAMAGED
 BY LIQUIDS THAT ARE RETAINED BY THE
 CURB.
  
 60)NOTE: NO, THIS WAS NOT CORRECT.
 PLEASE SEE "SPEC BOOK" 16120
 2.3A5, PLEASE SEE COLOR CODING FOR
 277/480V SHALL BE BROWN, PURPLE, YELLOW.
 215.8 LOCAL AMENDMENTS.
  
 61)NOTE:OK.
  
 62)NOTE: OK.
 HOWEVER PLEASE SEE NEW NOTES.
  
 63)NOTE: OK.
 HOWEVER SEE NEW NOTES.
  
 64)NOTE:OK.
  
 65)NOTE: OK.
 SEE NEW NOTES FOR OTHER "F" FEEDER
 SCHEDULE AND CORRELATION WITH PANE
 SCHEDULES.L
  
 66)NOTE: OK.
  
 67)NOTE: OK, HOWEVER GEN INFORMATION,
 FUEL SUB-BASE TANK STILL NOT SUBMITTED.
  
  
 68)NOTE:NO, SPECS FOR FIRE PUMP
 CONTROLLER ETCRATING S STILL TO BE
 VERIFIED.PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW SERVICE EQUIPMENT BEING INSTALL-
 ED. MAINS/BRKRS AND PANELS ARE ALL TO BE
 RATED FOR THE AVAILABLE FAULT CURRENT.
 PER 110.9/215.5
 AIC RATINGS SHOULD BE NOTED ON ALL
 EQUIPMENT.
  
 69)NOTE:OK, ENGINEER'S RESPONSE LETTER
 MENTIONS, "LIGHTNING PROTECTION SYSTEM"
 WILL BE UNDER SEPARATE PERMITS.
 PLEASE SEE ALL INFORMATION FOR
  
 70)NOTE: NO, INFORMATION NEEDS TO BE
 SUBMITTED FOR VERIFICATION OF CODE
 COMPLIANCE WITH SAID SYSTEMS.PLEASE ALSO
 SEEIF ALL INFORMATION FOR FIRE PUMP,
 FIRE PUMP CONTROLLER,GENERATOR, ATS,
 ETC WAS NOT SUBMITTED FOR REVIEW WITH
 BASE BLDG.
 PLEASE SEE FIRE REVIEW COMMENTS.
  
 71)NOTE: OK, NO RESPONSE NEEDED.
  
 72)NOTE:OK. NO RESPONSE NEEDED.
  
 73)NOTE: PLEASE KNOW, AS NOTED IN SOME
 NOTES, DUE TO SOME INFORMATION MISSING
 ON PLANS AND WITH PLANS, SOME COMMENTS
 ARE NEW AND SOME ARE REPEAT.
 ***************************************
  
 3RD REVIEW
 NEW COMMENTS/AND REPEAT COMMENTS WITH
 FURTHER EXPLANATION IN ORDER FOR
 COMMENTS TO BE ADDRESSED FOR A FINAL
 REVIEW.
  
  
 74) NOTE: PLEASE SEE PREVOUS NOTES
 PERTAINING TO BUS DUCT.
 PLEASE CORRELATE BUS-DUCT SIZES ON RISER
 DIAGRAM AND BLDG RISER UP THROUGH THE
 BLDG.
 A) PLEASE SEE MAIN RISER NOW HAS BEEN
 REVISED FOR BUS-STABS INTO FPL VAULT FOR
 MAINS, HOWEVER PLEASE NOW SEE 1SMCN AND
 2SMCN WHICH SHOWS 4000A BUS-DUCT INTO
 BOTH 3000A MAINS. (SEE KEY NOTE K-4)
 THIS OK, HOWEVER PLEASE CORRECT OF
 INDEED ONLY 3000A BUS IS GOING TO BE
 USED.
 B) PLEASE SEE 6.02, AND 6.03 FOR "KEY
 NOTES". PLEASE SEE 6.02 HAS NOW BEEN
 REVISED FOR 1SMCN RISER WHICH CONTAINS
 REVISION "K-3", PLEASE SEE THIS WAS
 CHANGED TO 4000A ON A 3000A MAIN, THIS
 IS OK, HOWEVER PLEASE SEE 6.03 "KEY
 NOTE" FOR SAME BUS DUCT RISER. PLEASE
 SEE KEY NOTES REF K-7 FOR THE SAME RISER
 WHICH IS SHOWN AS 3000A'S??
 PLEASE VERIFY SIZING OF BUST DUCT 3OR 4K
 AND IF THERE ARE TWO DIFFERENT SIZES
 BEING INSTALLED FOR THIS 3K MAIN.?
 PLEASE SEEFEEDERS AS NOTED ARE FOR
 3000A'S.
  
 75)NOTE: PLEASE SEE PREVIOUS NOTED A
 REQUEST TO PROVIDE "FEEDER SCHEDULE" ON
 RISER DIAGRAM AND TO NOTES TO CORRELATE
 FEEDERS.
 PLEASE SEE THE FOLLOWING:
  
 A) DPHREL, SHOWS F-9 ON RISER, F-10 ON
 PANEL SCHEDULE AND F-10 ON SHE. REDLINED
 LOCATION.
  
 B)DPHRE, SHOWS F-11 ON RISER, F-13 ON
 PANEL SCHEDULE. REDLINED LOCATION.
  
 C)DPHRN, SHOWS F-4 ON RISER, F-5 ON SHN,
 REDLINED LOCATION. PLEASE NOTE F-4 IS
 FOR 2500A'S?
  
 D)HRHN, SHOWS F-15 ON RISER, F-19 ON
 SHN, REDLINED LOCATION.
  
 E)HGME, SHOWS BLANK ON RISER, SHOWS F-12
 ON PANEL SCHEDULE DPHE.
  
 F)H5ME, SHOWS F-18 ON RISER, SHOWS F-20
 ON DPHE, REDLINED LOCATION.
  
 G)FIRE PUMP FEEDERS, F-10 INDICATE AN
 "EQUIPMENT GROUNDING CONDUCTOR" FROM
 FPL. PLEASE SEE 250.6 AND EQUIPMENT
 GROUNDING CONDUCTOR IS ONLY INSTALLED
 AFTER THE FIRST MEANS OF DISC.
 (IT IS NOTED, FEEDERS NOT TO HAVE EQP
 GRND).
 PLEASE SEE FEEDERS LISTED AS K-24 WHICH
 INDICATES 6-SETS OF 3-3/0'S AND 3/0 GRND
 FOR FEEDERS TO FIRE PUMP FROM FIRE PUMP
 CONTROLLER?? PLEASE VERIFY THE SIZES AND
 NUMBER OF PARALLEL RUNS.
  
 H)SHN AND SHE ON RISER DIAGRAM INDICATES
 A "BUS-STAB" INOT FPL VAULT, HOWEVER,
 PANEL SCHEDULES FOR EACH OF THESE ON
 7.12 INDICATES "FEEDERS" AS F-3 AND F-6.
 PLEASE CORRELATE, LOCATION REDLINED.
  
 76)NOTE: PLEASE SEE SPECS FOR ATS NOT
 SUBMITTED TO VERIFY MEANS OF DISCONNECT,
 MANUAL, LOCATED ON OUTSIDE OF EQUIPMENT
 ETC.
 PLEASE SEE DPHE WILL BE REQUIRED TO HAVE
 A MAIN CIRCUIT BREAKER FOR SERVICE
 DISCONNECT FROM FPL AND GENERATOR.
 THIS WAS REDLINED ON SETS FROM PREVIOUS
 REVIEW, BUT UNABLE TO VERIFY MEANS OF
 DISCONNECT FROM OTHER REVIEWS DUE TO NO
 SPECS ETC SUBMITTED FOR ATS.
 NO OCP COULD BE LOCATED FOR SEC'S COMING
 INOT BLDG FROM FPL ON THIS.
 230.70,230.76,230.79,230.72,240.4.
  
 77)NOTE: PLEASE KNOW, PLANS WERE
 SUBMITTED ONLY FOR "PLAN REVIEW" BEFORE
 JAN 1ST, 2005 AND NOT FOR PERMIT
 APPLICATION.. PLEASE SEE NFPA-72 AND 101
 AND FIRE CODES CHANGE AT THAT TIME.
 PLEASE SEE NFPA 101 REFERENCES A 1999
 EDITION. EVEN IF UNDER THE OLD CODE,
 THIS WOULD BE 2000 EDITION OF 101,
 HOWEVER PERMIT APPLICATIONS AFTER JAN
 1ST , WOULD PLACE THIS PROJECT UNDER THE
 2002 NFPA-72 AND 2003 NFPA-101.
  
 78)NOTE: PLEASE SEE CHANGES TO PREVIOUS
 NOTES FOR WATER HEATERS SHOWING OCP AT
 50A'S FOR A 4.5KW UNIT. PLEASE SEEUNIT
 "N" WHICH NOW SHOWS SECOND WATER HEATER
 AS A "BLANK" FOR OCP ETC.
 PLEASE SEE LOAD CALCULATIONS AND PLANS
 STILL INDICATE TWO UNITS.
 PLEASE ADJUST AND CORRELATE.
  
 79)NOTE: PLEASE SEE PANEL SCHEDULE FOR
 UNIT D-2 COULD NOT BE LOCATED.
 PLEASE CLARIFY IF THIS IS A DIFFERENT
 PANEL. UNITS "D" AND D-1 ARE SUBMITTED.
  
 80)NOTE: PLEASE SEELAUNDRY RMS IN SOME
 UNITS INDICATE THE CIRCUIT PROVIDED FOR
 WASHER ALSO FEEDING THE ADDITIONAL GFI
 IN THE SAME RM? PLEASE SEE LOADING FOR
 CIRCUITING AS A DEDICATED CIRUIT AND NO
 OTHER RECEPTS ON THAT CIRCUIT SHOULD BE
 VERIFIED.
 LOAD FOR WASHER UNIT CAN NOT BE
 VERIFIED.
 PLEASE SEE 210.11C2
  
 81)NOTE: PLEASE SEENFPA-101 7-9 UNDER
 THE 2003. WHICH WOULD REQUIRE MUTIPLE
 CIRCUITS FEEDING EM LTS IN STAIR TOWERS.
 PLEASE KNOW THE AHJ/ FIRE MARSHAL'S
 OFFICE HAS DETERMIND EITHER EVERY OTHER
 EM LT TO ALTERNATE CIRUITS OR A BATTERY
 BACK UP FIXTURE AT EVERY OTHER LEVEL
 WOULD BE REQUIRED FOR EGRESS IN STAIR
 TOWER. PLEASE KNOW, IF BLDG IS UNDER
 GENERATOR/ EM POWER AND A TRIPPING OF A
 SINGLE BRKR , EITHER BRANCH CIRCUIT OR
 MAIN, THIS WOULD PLACE STAIR TOWER(S) IN
 TOTAL DARKNESS. TO ALLEAVIATE ANY OF
 ALTERNATING CIRCUITS, OR TRIPPING OF ANY
 OVERCURRENT PROTECTION DEVICE, A BATTERY
 BACK-UP TYPE OF FIXTURE WOULD BE
 REQUIRED TO PROVIDE A MIN OF .1 FT
 CANDLE AS LISTED UNDER 7.9.2.1,
 7.9.2.2, 7.8.1.2.
 THIS COMMENT CAN BE SET UP AS A
 "PROVISO"TO REVISE BEFORE ROUGH OR CAN
 BE ADDRESSED AT THIS TIME. PLEASE CALL
 TO GO OVER.
  
 82)NOTE: PLEASE SEE ATTACHED COPY OF FS
 553.80(2)(B) IS GIVEN ASNOTICE ONLY.
  
 PLEASE BE SURE TO SEE ANY COMMENTS FROM
 OTHER TRADES WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
 PLEASE BE SURE TO REMOVED ALL OLD/
 VOIDED SHEETS AND ONLY INSERT NEW
 REVISED SHEETS INTO TWO COMPLETE SETS
 FOR REVIEW AND STAMPING.
 ONE COMPLETE SET OF OLD/VOIDED SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE.
  
 PLEASE SUBMIT ALL OF THE ABOVE
 INFORMATION FOR REVIEW. IF THERE ARE ANY
 QUESTIONS, PLEASE DO NOT HESITATE IN
 CONTACTING THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
 PLEASE SEE ANY COMMENTS FROM O
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
2005-09-06 00:00:00PLANS WILL GO INTO A "F" STATUS.
  
 PLAN REVIEW NOTES TO FOLLOW, PLAN REVIEW
 AND NOTES IN PROGRESS.
2005-09-04 00:00:00ELECTRICAL PLANSONLY ARE AT DP'S DESK
 FOR REVIEW.
 REVIEW TO CONTINUE,,,, STOPPED FOR 9/4
2005-08-24 00:00:00REVISION TO THE TEMPORARY POWERJL