Date |
Text |
2007-06-18 10:40:26 | ----------------DENIED----------------- |
| |
| NOTE: AREAS ADDRESSED IN THESE COMMENTS HAVE BEEN |
| MARKED ON ONE SET OF THE SUBMITTED PLANS, WHERE |
| PRACTICAL, FOR THE PURPOSE OF CLARITY. |
| |
| 1. M2.21 UNIT L: FLOOR PLAN SHOWS 1445 CFM SUPPLY. |
| HPU-4 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 2000 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 2. M2.21 UNIT C: SQUARE 90 DEGREE ELBOW ON 12X10 SUPPLY |
| DUCT REQUIRES TURNING VANES PER FBC,M 603.4, SMACNA OR |
| NAIMA DUCT CONSTRUCTION STANDARDS. |
| |
| 3. M2.21 UNIT C: PLEASE SHOW PROVISIONS FOR BALANCED |
| RETURN PER FBC,M 601.4. |
| |
| 4. M2.21 UNIT K: FLOOR PLAN SHOWS 1030 CFM SUPPLY. |
| HPU-3 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 1250 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 5. M2.21 UNIT K: TRANSFER DUCT FROM MASTER BEDROOM IS |
| NOT DESIGNED TO MEET THE BALANCED RETURN EXCEPTIONS OF |
| FBC,M 601.4. 10X8 SUPPLY X 1.5 = 120 SQ.IN. THIS IS THE |
| MINIMUM SIZE TRANSFER DUCT PLUS 1" UNDERCUT DOOR. IF |
| TRANSFERS ARE NOT DESIGNED TO THESE EXCEPTIONS, A FIELD |
| TEST WILL BE REQUIRED TO VERIFY BALANCED RETURN |
| PRESSURE DIFFERENTIAL OF 0.01" W.C. OR LESS PER 601.4. |
| |
| 6. M2.21 UNIT B5: FLOOR PLAN SHOWS 1050 CFM SUPPLY. |
| HPU-2 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 950 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 7. M2.21 UNIT B5: TRANSFER DUCT IN MASTER BEDROOM. 12X8 |
| SUPPLY X 1.5 = 144 SQ.IN. THIS IS THE MINIMUM SIZE |
| REQUIRED FOR TRANSFER DUCT PLUS 1" UNDERCUT DOOR. SEE |
| COMMENT #5 FOR CONDITIONS. |
| |
| 8. M2.21 AND M2.22: PLEASE SHOW ENTIRE DUCT |
| LAYOUT/FLOOR PLAN FOR UNIT B6 ON ONE PAGE OR THE |
| OTHER. |
| |
| 9. M2.21 UNIT B6: SQUARE 90 DEGREE ELBOW REQUIRES |
| TURNING VANES. SEE COMMENT #2. COMMENTS 6 AND 7 ALSO |
| APPLY TO UNIT B6. |
| |
| 10. M2.22 UNIT G1: THE DESIGN OF THE TRANSFER DUCT AND |
| GRILLS FOR THE MASTER BEDROOM IS UNCLEAR DUE TO SOME |
| COMPONENTS NOT BEING SHOWN ON PLAN. FBC 104.3.1.1 |
| |
| 11. M2.22 UNIT D1: PRIMARY RETURN GRILL IS MISSING FROM |
| PLANS. PLEASE CORRECT. |
| |
| 12. M2.22 UNIT D1: FLOOR PLAN SHOWS 845 CFM SUPPLY. |
| HPU-5 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 650 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 13. M2.22 UNIT E1: SQUARE 90 DEGREE ELBOW NEEDS TURNING |
| VANES. SEE COMMENT #2. |
| |
| 14. M2.22 UNIT E1: PLAN SHOWS 4" BATH EXHAUST PASSIGN |
| THROUGH R/A PLENUM. EXHAUST DUCTS UNDER POSITIVE |
| PRESSURE SHALL NOT EXTEND INTO OR PASS THROUGH DUCTS OR |
| PLENUMS. FBC,M 601.3. |
| |
| 15. M2.22 UNIT C2: PLEASE SHOW ON PLANS THE SIZE OF |
| SUPPLY DUCT FROM A/C CLOSET TO THE TRANSITION AND SHOW |
| THE DUCT LINE IN ITS ENTIRETY. PORTIONS OF THE DUCT ARE |
| MISSING FROM PLAN. |
| |
| 16. M2.22 UNIT C2: FLOOR PLAN SHOWS 1125 CFM SUPPLY. |
| HPU-1 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 11350 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 17. M2.23 UNIT A: FLOOR PLAN SHOWS 1540 CFM SUPPLY. |
| HPU-4 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 2000 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 18. M2.23 UNIT B3: SQUARE 90 DEGREE ELBOWS NEED TURNING |
| VANES. SEE COMMENT #2. |
| |
| 19: M2.23 UNIT B4: PLEASE SHOW LOCATION OF PLENUM |
| CEILING AREA ON FLOOR PLAN. |
| |
| 20. M2.23 UNIT B4: SQUARE 90 DEGREE ELBOWS REQUIRE |
| TURNING VANES. SEE COMMENT #2. |
| |
| 21. M2.23 UNIT G: FLOOR PLAN SHOWS 635 CFM SUPPLY. |
| HPU-6 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 800 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 22. M2.24 UNIT A: PLEASE SEE COMMENT #17 |
| |
| 23. M2.24 UNIT A: TWO 90 DEGREE ELBOWS REQUIRE TURNING |
| VANES. PLEASE SEE COMMENT #2. |
| |
| 24. M2.24 UNIT A: PLEASE SHOW LOCATION OF PLENUM |
| CEILING AREA ON FLOOR PLAN. |
| |
| 25. M2.25 UNIT D: FLOOR PLAN SHOWS 770 CFM SUPPLY. |
| HPU-5IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 650 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| 26. M2.26 UNIT C1; FLOOR PLAN SHOWS AN EXTRA BRANCH |
| DUCT AND REGISTER IN THE KITCHEN. PLEASE CLARIFY. |
| |
| 27. M2.26 UNIT C1: FLOOR PLAN SHOWS 1260 CFM SUPPLY. |
| HPU-1 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 1350 CFM. |
| PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND |
| EQUIPMENT SCHEDULE. WHICH IS CORRECT? |
| |
| NOTE: ALL APARTMENTS SHOWING HPU-4 AT 2000 CFM WILL |
| REQUIRE DUCT SMOKE DETECTORS WITH FAN SHUT-DOWN AND |
| SHALL BE INTERCONNECTED WITH THE BUILDING FIRE ALARM |
| SYSTEM PER FBC,M 606.2.1 AND 606.4.1. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J REGUEIRO |
| 561.805.6719 |
| [email protected] |