Plan Review Notes
Plan Review Notes For Permit 04120353
Permit Number 04120353
Review Stop M
Sequence Number 28
Notes
Date Text
2007-06-18 10:40:26----------------DENIED-----------------
  
 NOTE: AREAS ADDRESSED IN THESE COMMENTS HAVE BEEN
 MARKED ON ONE SET OF THE SUBMITTED PLANS, WHERE
 PRACTICAL, FOR THE PURPOSE OF CLARITY.
  
 1. M2.21 UNIT L: FLOOR PLAN SHOWS 1445 CFM SUPPLY.
 HPU-4 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 2000 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 2. M2.21 UNIT C: SQUARE 90 DEGREE ELBOW ON 12X10 SUPPLY
 DUCT REQUIRES TURNING VANES PER FBC,M 603.4, SMACNA OR
 NAIMA DUCT CONSTRUCTION STANDARDS.
  
 3. M2.21 UNIT C: PLEASE SHOW PROVISIONS FOR BALANCED
 RETURN PER FBC,M 601.4.
  
 4. M2.21 UNIT K: FLOOR PLAN SHOWS 1030 CFM SUPPLY.
 HPU-3 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 1250 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 5. M2.21 UNIT K: TRANSFER DUCT FROM MASTER BEDROOM IS
 NOT DESIGNED TO MEET THE BALANCED RETURN EXCEPTIONS OF
 FBC,M 601.4. 10X8 SUPPLY X 1.5 = 120 SQ.IN. THIS IS THE
 MINIMUM SIZE TRANSFER DUCT PLUS 1" UNDERCUT DOOR. IF
 TRANSFERS ARE NOT DESIGNED TO THESE EXCEPTIONS, A FIELD
 TEST WILL BE REQUIRED TO VERIFY BALANCED RETURN
 PRESSURE DIFFERENTIAL OF 0.01" W.C. OR LESS PER 601.4.
  
 6. M2.21 UNIT B5: FLOOR PLAN SHOWS 1050 CFM SUPPLY.
 HPU-2 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 950 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 7. M2.21 UNIT B5: TRANSFER DUCT IN MASTER BEDROOM. 12X8
 SUPPLY X 1.5 = 144 SQ.IN. THIS IS THE MINIMUM SIZE
 REQUIRED FOR TRANSFER DUCT PLUS 1" UNDERCUT DOOR. SEE
 COMMENT #5 FOR CONDITIONS.
  
 8. M2.21 AND M2.22: PLEASE SHOW ENTIRE DUCT
 LAYOUT/FLOOR PLAN FOR UNIT B6 ON ONE PAGE OR THE
 OTHER.
  
 9. M2.21 UNIT B6: SQUARE 90 DEGREE ELBOW REQUIRES
 TURNING VANES. SEE COMMENT #2. COMMENTS 6 AND 7 ALSO
 APPLY TO UNIT B6.
  
 10. M2.22 UNIT G1: THE DESIGN OF THE TRANSFER DUCT AND
 GRILLS FOR THE MASTER BEDROOM IS UNCLEAR DUE TO SOME
 COMPONENTS NOT BEING SHOWN ON PLAN. FBC 104.3.1.1
  
 11. M2.22 UNIT D1: PRIMARY RETURN GRILL IS MISSING FROM
 PLANS. PLEASE CORRECT.
  
 12. M2.22 UNIT D1: FLOOR PLAN SHOWS 845 CFM SUPPLY.
 HPU-5 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 650 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 13. M2.22 UNIT E1: SQUARE 90 DEGREE ELBOW NEEDS TURNING
 VANES. SEE COMMENT #2.
  
 14. M2.22 UNIT E1: PLAN SHOWS 4" BATH EXHAUST PASSIGN
 THROUGH R/A PLENUM. EXHAUST DUCTS UNDER POSITIVE
 PRESSURE SHALL NOT EXTEND INTO OR PASS THROUGH DUCTS OR
 PLENUMS. FBC,M 601.3.
  
 15. M2.22 UNIT C2: PLEASE SHOW ON PLANS THE SIZE OF
 SUPPLY DUCT FROM A/C CLOSET TO THE TRANSITION AND SHOW
 THE DUCT LINE IN ITS ENTIRETY. PORTIONS OF THE DUCT ARE
 MISSING FROM PLAN.
  
 16. M2.22 UNIT C2: FLOOR PLAN SHOWS 1125 CFM SUPPLY.
 HPU-1 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 11350 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 17. M2.23 UNIT A: FLOOR PLAN SHOWS 1540 CFM SUPPLY.
 HPU-4 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 2000 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 18. M2.23 UNIT B3: SQUARE 90 DEGREE ELBOWS NEED TURNING
 VANES. SEE COMMENT #2.
  
 19: M2.23 UNIT B4: PLEASE SHOW LOCATION OF PLENUM
 CEILING AREA ON FLOOR PLAN.
  
 20. M2.23 UNIT B4: SQUARE 90 DEGREE ELBOWS REQUIRE
 TURNING VANES. SEE COMMENT #2.
  
 21. M2.23 UNIT G: FLOOR PLAN SHOWS 635 CFM SUPPLY.
 HPU-6 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 800 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 22. M2.24 UNIT A: PLEASE SEE COMMENT #17
  
 23. M2.24 UNIT A: TWO 90 DEGREE ELBOWS REQUIRE TURNING
 VANES. PLEASE SEE COMMENT #2.
  
 24. M2.24 UNIT A: PLEASE SHOW LOCATION OF PLENUM
 CEILING AREA ON FLOOR PLAN.
  
 25. M2.25 UNIT D: FLOOR PLAN SHOWS 770 CFM SUPPLY.
 HPU-5IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 650 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 26. M2.26 UNIT C1; FLOOR PLAN SHOWS AN EXTRA BRANCH
 DUCT AND REGISTER IN THE KITCHEN. PLEASE CLARIFY.
  
 27. M2.26 UNIT C1: FLOOR PLAN SHOWS 1260 CFM SUPPLY.
 HPU-1 IS SHOWN ON SCHEDULE (M5.01) TO SUPPLY 1350 CFM.
 PLEASE SHOW CORRELATION BETWEEN FLOOR PLAN AND
 EQUIPMENT SCHEDULE. WHICH IS CORRECT?
  
 NOTE: ALL APARTMENTS SHOWING HPU-4 AT 2000 CFM WILL
 REQUIRE DUCT SMOKE DETECTORS WITH FAN SHUT-DOWN AND
 SHALL BE INTERCONNECTED WITH THE BUILDING FIRE ALARM
 SYSTEM PER FBC,M 606.2.1 AND 606.4.1.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J REGUEIRO
 561.805.6719
 [email protected]