Plan Review Notes
Plan Review Notes For Permit 04120353
Permit Number 04120353
Review Stop E
Sequence Number 2
Notes
Date Text
2005-04-08 00:00:00************ UNSAT 2ND REVIEW *********
  
 PLEASE SEE MANY NOTES FROM PREVIOUS
 REVIEW STILL NEED TO BE ADDRESSED.
  
 PLEASE ALSO SEE NEW NOTES DUE TO PLANS
 CONTAINING MORE INFORMATION THAN
 SUBMITTED ON PREVIOUS REVIEW.
  
 ***************************************
 PLEASE SEE FIRST PART OF REVIEW IS A
 DIRECT OVERVIEW OF PREVIOUS NOTES, NEW
 NOTES WILL BE FOLLOWING.
 ***************************************
  
 1)NOTE: NOTE #1, OK, HOWEVER PLEASE SEE
 NOTE #19 IN THIS AND PREVIOUS REVIEW.
  
 2)NOTE: NOTE #2 NO, PLEASE SEE REQUIRED
 WIND LOADING INFORMATION IS NOT NOTED ON
 ELECTRICAL PLANS FOR POLES. IF THIS
 INFORMATION IS PROVIDED ON ADDITIONAL
 SHEETS FOR BLDG REVIEW, THIS IS FINE AND
 REQUIRED, HOWEVER THIS INFORMATION WILL
 NEED TO BE ELECTRICAL SHEET FOR
 ELECTRICAL CONTRACTOR ETC.
 WINB LOADING NOTE(S) SHOULD REFERENCE
 FBC 140 MPH.
  
 3)NOTE: NOTE #3 NO, PLEASE SEE SHEET
 ATTACHED WHICH IS A PRINT OUT FROM
 DBPR'S WEBSITE. PLEASE SEE LICENSE
 INFORMATION PROVIDED ON TITLE BLOCKS FOR
 ARCHITECTUAL FIRM DOES NOT APPEAR TO BE
 ACCURATE. PLEASE SEE ATTACHED SHEET
 WHICH SHOWS BC ARCHITECTS INC. WITH AN
 ARCHITECTUAL BUS/FIRM LICENSE NUMBER OF
 AA#0003360. PLEASE SEE TITLE BLOCKS FOR
 ALL SHEETS AND FOR ALL TRADES APPEARS TO
 INDICATE THIS FIRM LICENSE NUMBER AS
 0008129???.
 PLEASE SEE FAC 61G1-16.004, FS 481.219.
 PLEASE SEE THIS IS REQUIRED ON ALL
 SHEETS AND FOR ALL TRADES WHEATHER OR
 NOT COMMENT IS MADE BY OTHER
 REVIEWER(S).
 PLEASE SEE ENGINEERING FIRM'S TITLE
 BLOCK HAS BEEN CORRECTED.
  
 4)NOTE: NOTE #4, OK. NOTE ADDED FOR "NO
 SWIMMING" AFTER DUSK.
  
 5)NOTE: NOTE #5 OK.
  
 6)NOTE: NOTE #6 OK, FIRE RATING VERIFIED
 FOR DIRECT ACCESS TO MAIN ELECTRICAL
 ROOM. HOWEVER, NOTES FOR SIGNAGE, MAPS
 AND/OR DIRECTORY COULD NOT BE LOCATED ON
 PLANS.
 230.2E 700.8A,701.9,702.8 ETC.
 A SIGN SHALL BE PLACED AT THE SERVICE
 ENTRANCE EQUIPMENT INDICATING TYPE AND
 LOCATION OF ON-SITE EMERGENCY POWER
 SOURCES.
 PLEASE SEE ALL SIGNAGE REQUIRED TO BE 1"
 MIN WITH CONTRASTING BACKGROUND.
 SIGNAGE/MAPPINGALSO REQUIRED AT FIRE
 COMMAND RM AND AT ACCESS DOOR CLOSEST TO
 MAIN ELECTRICAL ROOM.
 SIGNAGE FOR ALL ELECTRICAL ROOMS.
 PLEASE ALSO SEE 110.16
 110.16 FLASH PROTECTION.
 SWITCHBOARDS, PANELBOARDS, INDUSTRIAL
 CONTROL PANELS, AND MOTOR CONTROL
 CENTERS THAT ARE IN OTHER THAN DWELLING
 OCCUPANCIES AND ARE LIKELY TO REQUIRE
 EXAMINATION, ADJUSTMENT, SERVICING, OR
 MAINTENANCE WHILE ENERGIZED SHALL BE
 FIELD MARKED TO WARN QUALIFIED PERSONS
 OF POTENTIAL ELECTRIC ARC FLASH HAZARDS.
 THE MARKING SHALL BE LOCATED SO AS TO BE
 CLEARLY VISIBLE TO QUALIFIED PERSONS
 BEFORE EXAMINATION, ADJUSTMENT,
 SERVICING, OR MAINTENANCE OF THE
 EQUIPMENT.
 SEE FIRE COMMENTS FOR "KNOW BOX"
 LOCATIONS.
  
 7)NOTE: NOTE #7,OK HOWEVER PLEASE SEE
 SHEETS E 2.11,2.12, MANY ELECTRICAL
 DEVICES/FIXTURES APPEAR TO BE SHOWN WITH
 OUT CIRCUITS. ARE THESE MISPRINTED AND
 REPEATED ON OTHER SHEETS.
  
 8)NOTE: NOTE #8 NO, PLEASE SEE 620.23.24
 ETC.
 PLEASE SEE ELEVATOR EQUIPMENT RMS.
 A SEPARATE BRANCH CIRCUIT SHALL SUPPLY
 THE MACHINE ROOM OR CONTROL
 ROOM/MACHINERY SPACE OR CONTROL SPACE
 LIGHTING AND RECEPTACLE(S).
 A SEPARATE BRANCH CIRCUIT SHALL SUPPLY
 THE HOISTWAY PIT LIGHTING AND
 RECEPTACLE(S).
  
 9)NOTE: NOTE #9 NO, PLEASE SEE RECETPS
 WERE ADDED HOWEVER, ID SCALE IS CLOSE AS
 INDICATED, SOME RECEPTS APPEAR TO BE
 WITHIN THE RESTRICATED 10' AREA.
 PLEASE SEE 620.22A3
 PLEASE ALSO SEE NEW NOTE FOR LIGHTING
 AROUND POOLS.
  
 10)NOTE: NOTE #10 OK, REFERENCES
 CHANGED.
  
 11)NOTE: NOTE #11 OK, HOWEVER PLEASE SEE
 NEW NOTES FOR BATH/TUB/JACUZZI FIX.
  
 12)NOTE: NOTE #12 NO, PLEASE SEE UNITS
 ARE STILL SHOWN WITHOUT ACCESS TO
 GARAGE.
 AS PER CONVERSATION WITH MR. RAPL BAEZA,
 NO ACCESS WAS GOING TO BE INSTALLED FROM
 GARAGE IN DESIGN.
 PLEASE SEE BLDG REVIEW COMMENTS BY MR.
 ROBERT BROWN, ACCESSIBILTY FROM GARAGE
 MAY BE REQUIRED.
 IF SO, PLEASE SEE 210.70 AND LS101 5-8.
  
 13)NOTE: NOTE #13 NO, PLEASE SEE GRADE
 LEVEL ACCESS REQUIRES MEANS OF EGRESS
 LIGHTING/CONTROL. PLEASE ALSO SEE
 EXCEPTIONS.
  
 14)NOTE: NOTE #14, OK, HOWEVER PLEASE
 SEE NOTE #7.
  
 15)NOTE: NOTE #15 OK FOR SD'S HOWEVER
 PLEASE SEE NEW COMMENTS FOR CIRCUITING
 AND ARC FAULT PROTECTION.
  
 16)NOTE: NOTE #16 OK.
  
 17)NOTE: NOTE #17 NO, PLEASE SEE 210.52D
 FOR GFI REQUIRED WITHIN 3' OF SINK/LAV
 EDGE.
 PLEASE SEE PLANS AHVE SOME REDLINED AT
 LOCATION(S) MISSING.
  
 18)NOTE: NOTE #18 NO, PLEASE SEE
 ELECTRICLA PANELS NOT PERMITTED ON
 CLOSETS. PLEASE SEE 110.26,408.7,240.24
 ETC.
 PLEASE SEE 240.24OVER CURRENT
 PROTECTION IS NOT TO BE LOCATED IN THE
 VICINITY OF EASILY IGNITIBLE MATERIAL. ,
 SUCH AS IN CLOTHES CLOSETS.
 PLEASE ALSO SEE NEW NOTES BAOUT CATV AND
 TELEPHONE CABINETS.
  
 19)NOTE: NOTE #19 NO, PLEASE SEE SOME
 UNITS STILL SHOW A COUPLE OF ELECTRICAL
 PANELS IN "LT GRAY". THIS APPEARS TO BE
 MISPRINTS . PLEASE SEE UNIT HD FOR ONE.
  
 20)NOTE: NOTE #20 OK, HOWEVER PLEASE SEE
 NOTE #28 FOR 110.26
  
 21)NOTE: NOTE #21 OK.
  
 22)NOTE: NOTE #22 NO, PLEASE SEE MANY
 UNITS HAVE BEEN REDLINED FOR AREAS IN
 QUESTION. PLEASE SEE 210.52C1-5 FOR
 REQUIRED LOCATIONS OF GFI RECEPTS ALONG
 KITCHEN COUNTERSPACES, INCLUDING
 PENINSULARS AND " SEPARATE SPACES".
 210.52C2,4
  
 23)NOTE: NOTE #23 NO, CPULD NOT LOCATE
 NOTE REQUESTED FOR SD PLACEMENT ON
 PLANS.
 PLEASE CLARIFY WHERE THIS IS.
 PLEASE SEE NFPA-72 8-1.4.2 FOR THESE
 LOCATIONS.
  
 24)NOTE: NOTE #24 NO, PLEASE SEE GFI
 RECEPTS WERE ADDED TOLOWER TERRACE
 LEVELS BUT NONE TO UPPER TERRACES.
 PLEASE SEE UPPER TERRACE ON ELECTRICAL
 PLANS APPEAR TO BE SHOWN MUCH LARGER
 THAN TERRACES SHOWN ON ARCH SHEETS.
 THIS IS ONLY A NOTE AND LIGHTING OR GFI
 RECEPTS ARE NOT REQUIRED ON THE SMALLER
 OR LARGE TERRACES, HOWEVER OF THEY ARE
 GOING TO BE INSTALLED, PLEASE SHOW ON
 PLANS AT THIS TIME OR PLANS WILL BE
 REQUIRED TO BE REVISED AT A LATER DATE.
  
 25)NOTE: NOTE #25 YES/NO , GFI BRKR
 NOTED AT PANEL SCHEDULES,HOWEVER A
 POWER/RECEPT COULD NOT BE LOCATED ON
 PLANS AT THESE UNITS.
 PLEASE SHOW.
  
 26)NOTE: NOTE #26NO. PLEASE SEE NO
 INFORMATION EXCEPT THAT FIRE PUMP IS
 GOING TO BE 250 HP. PLEASE SEE KEYNOTES
 K-23 DOES NOT PROVIDE ENOUGH
 INFORMATION.
 PLEASE ALSO SEE NEW NOTES PERTAINING TO
 FIRE PUMP/CONTROLLER ETC.
 PLEASE SEE PREVIOUS REQUEST WAS TO HAVE
 ALL MANUFACTURE SPEC SHEETS SUBMITTED
 FOR FIRE PUMP, FIRE PUMP CONTROLLER, ETC
 NONE COULD BE LOCATED IN SPECS,
 SUBMITTALS???
 SEE NEW NOTES:
  
 27)NOTE: NOTE #27 NO, PLEASE SEE ABOVE
 NOTE. PLEASE SE NO SPECS FOR GENERATOR,
 SUB BASE FUEL TANK ATS WERE SUBMITTED.
 215.5
 PLEASE SEE NEW NOTES FOLLOWING.
  
 28)NOTE: NOTE #28 NO, PLEASE SEE NOTE
 WAS ADDED TO ONE SHEET ONLY. PLEASE SEE
 SPECIFICS NOTES FOR 110.26 WILL BE
 REQUIRED ON ALL SHEETS SHOWING
 ELECTRICAL ROOMS AND ELECTRICAL CLOSETS.
  
 PLEASE SEE THIS NOTE SHOULD REFLECT "ALL
 ELECTRICAL ROOMSAND ELECTRICAL CLOSETS
 SHALL MEETS ALL THE REQUIREMENTS OF
 110.26 AND ALL OTHER REQUIREMENT OF
 2002 NEC" PLEASE SEE WE ARE HAVING MANY
 ISSUES WHERE WIDTHS ARE BEING MET,
 HOWEVER HEIGHT REQUIREMENTS ARE NOT.
 SEE NEW NOTES ALSO.
  
 29)NOTE: NOTE #29 OK.
  
 30)NOTE: NOTE #30 NO, PLEASE SEE MORE
 THAN ONE "K" NOTE LOCATED ON KEYNOTES DO
 NOT CORRELATE OR SHOWN "BLANK" OR NOTED
 AS NOT BEING USED, HOWEVER PLANS DO NOT
 MATCH THESE.
 PLEASE SEE K26,K35, ETC.
 PLEASE SEE NEW NOTES FOR F AND K NOTES
 WHICH DO NOT CORRELATE WITH PLANS.
 PLEASE SEE NEW NOTES:
  
 31)NOTE: NO, PLEASE SEE RESPONSE LTR
 MENTIONS "WILL COMPLY" HOWEVER PLEASE
 SEE NEW NOTES PERTAINING TO NOTES ON
 PLANS AND SPECS.
  
 32)NOTE: NOTE #32 OK, NOTE ADDED , GEN
 WILL NOT BE SEPARATELY DEREVED. THIS
 WILL BE VERIFIED ONCE MANUFACTURE SPECS
 ARE SUBMITTED.
 SEE NEW NOTES ALSO;
  
 33)NOTE: NOTE #33 OK, HOWEVER PLEASE SEE
 NEW NOTES PERTAINING TO FEEDER SIZES.
  
 34)NOTE: NOTE #34 NO, PLEASE SEE RISER
 DIAGRAM STILLDOES NOT INCLUDE A
 REDUCED "KEYED NOTES" OR RECDUCED
 "FEEDER SCHEDULE FOR REFERENCE WITHOUT
 HAVING TO TURN BACK AND FORTH FROM RISER
 DIAGRAM PAGE TO E-6.13.
 215.5.
 PLEASE SEE NEW NOTES FOR250.30
 PLEASE SEE RISER INDICATES 3000A
 BUS-STAB INTO FPL VAULT FEEDING 4000A
 MAINS?? PLEASE CORRELATE.
 PLEASE SEE RISER SHOWS 3000A MAIN
 FEEDING 4000A BUS-DUCT THEN CHANGES BACK
 TO 3000A BUS DUCT??
  
 35)NOTE: NOTE #35 OK, HOWEVER SEE NEW
 NOTES FOR CORRELATIONOF METER CENTERS
 AND LOAD CALCULATIONS/ EQUIPMENT.
  
 36)NOTE: NOTE # 36 OK, OVEN ADDED,
 RANGES CHANGED.
  
 37)NOTE: NOTE #37 PLEASE SEE "FEEDER
 HOME RUN SCHEDULE" WAS ADDED TO MOST
 SHEETS CONTAINING PANEL SCHEDULE, BUT
 SEE PLANS FOR MISSING DETAIL. PLEASE
 ALSO SEE NEW NOTES PERTAINING TO PANELS
 SIZES.
  
 38)NOTE: NOTE #38 NO, PLEASE SEE
 PANELS STILL SHOWN AS 200A WITH 225A OCP
 FEEDING PANEL(S). PLEASE SEE THE 250A
 OCP WAS REMOVED.
  
 39)NOTE: NOTE #39 NO, PLEASE SEE WATER
 HEATERS SHOWN WITH 2P50A OCP FOR 4500VA
 UNITS ON #10 AWG.
 PLEASE ALSO SEE 6KW WITH 30A OCP.
 PLEASE SEE MIN OCP IS 125% AND MAX OCP
 IS 150%.
 PLEASE SEE 422.13,422.11,240.4, 310.16
 ETC.
  
 ***************************************
 NEW NOTES FOR REVIEW.
  
 40)NOTE: PLEASE SEE MIN REQUIREMENTS FOR
 ELECTRICAL LIGHT FIXTURES FORM SWIMMING
 POOL. IF SCALE IS USED AS INDICATED ON
 PLANS, SOME FIXTURES SHOWN AS CLOSE AS
 3' FROM WATER'S EDGE.
 PLEASE SEE 680.22 AND PREVIOUS NOTES FOR
 RECEPT PLACEMENT.
  
 41)NOTE: PLEASE CLARIFY MANY
 ELECTRICAL/GENERATOR RMS CONTAIN EM LT
 FIXTURES ON EM CIRCUIT BUT YET THESE ARE
 ALSO BATTERY BACK UP? PLEASE SEE THEN
 ARE MANY ELECTRICAL RMS WHICH DO NOT
 CONTAIN BATTERY BACK UP?
 THIS IS ONLY A NOTE.
  
 42)NOTE: PLEASE SEE MANY UNITS, 5,6,8
 ETC FOR REQUIRED RECEPTS PER 210.52.
 PLEASE SEE 2' OF WALL SPACES INT
 KITCHENS, BEDROOMS(EVEN IF BEHIND
 DOORS).
 PLEASE SEE MANY REDLINED AT LOCATIONS ON
 PLANS.
  
 43)NOTE: PLEASE SEE MOST DRYER LOCATIONS
 INDICATE A MANUAL SWITCH FOR DRYER
 "BOOST FAN" YET MANY DO NOT CONTAIN THIS
 SAME SW?
 HOWEVER, PLEASE SEE NOTES LOCATED ON
 EACH SHEET WHICH MENTIONS THAT THESE
 WILL BE AUTOMATICALLY INTERCONNECTED?
 PLEASE SEE MECHANICAL NOTES FOR THIS
 SAME ITEM. IT APPEARS INTERCONNECTING
 ANY DEVICES IN THESE FANS/ DRYERS MAY
 VOIDED WARRANTIES AND/OR VOIDED LISTINGS
 FROM MANUFACTURE.
  
 44)NOTE: PLEASE SEE AS MENTIONED ON
 ORIGINAL NOTES, ARC FAULT PROTECTION
 REQUIRED PER 2002 NEC 210.12, HOWEVER
 THERE ARE NUMEROUS AREAS IN MOST UNITS
 IN WHICH CIRCUITING FOR LIGHTING ETC
 DOES NOT HAVE THE "* " ON THE CIRCUIT
 #'S ON PANEL SCHEDULE FOR THE
 PROTECTION.
 PLEASE SEE ALL "OUTLETS" INCLUDING SD'S,
 LTS, FANS AND RECEPTS REQUIRED THIS.
 PLEASE SEE MANY OF THESE CIRCUIT #'S
 HAVE BEEN REDLINED ON PLANS, BUT NOT
 ALL.
  
 45)NOTE: PLEASE SEE SOME UNITS ARE
 SHOWING FIXTURES IN SOME UTILITY/CLOTHES
 CLOSETS WHICH DO NOT APPEAR TO MEET
 410.8 FOR MIN CLEARENCE. PLEASE VERIFY.
  
 46)NOTE:PLEASE VERIFY FIXTURE
 CLEARENCE OVER TUBS/HYDRO ETC. AN
 ELEVATION IS NOT SHOWN FOR MIN CLEARENCE
 AND WE HAVE ENCOUNTERED MANY WHICH FALL
 BELOW MIN CLEARENCE EVEN FOR A RECESSED
 LT WITH AN ENCLOSED COVER.
 THIS IS ONLY A NOTE:
  
 47)NOTE: SEE PREVIOUS/UPPER NOTES, UNIT
 # H-7 FOR MISSING GFI W/IN 3' OF SINK.
 210.52
  
 48)NOTE: PLEASE SEE UNIT A-1 WHICH
 INDICATES A THIRD SMALL APPL CIRCUIT ,
 HOWEVER THIS COULD NOT BE LOCATED ON
 PLANS?
  
 49)NOTE: PLEASE SEE UNIT V-1 THIS
 APPEARS TO HAVE "ALL" DEVICES SHIFTED
 AND REVIEW FOR PLACEMENT FOR THESE
 DEVICES CAN NOT BE DONE AT THIS TIME.
  
 49)NOTE: PLEASE SEE MANY CLOTHES CLOSETS
 CONTAINING COMBUSTIBLES ARE SHOWN WITH
 CATV AND TELEPHONE CABINETS. PLEASE SEE
 IF THESE UNITS WILL REQUIRE ANY "LV
 PLUG-IN" TYOE TRANSFORMERS THEN THESE
 RECEPTS WHICH ARE NOT SHOWN AT THIS TIME
 WOULD ONLY BE ALLOWED DIRECTLY OVER
 DOORS.
 PLEASE SEE PLANS DO NOT INDICATE ANY LV
 ALARM PANELS AT THIS TIME AND SAME WOULD
 BE REQUIED IF LOCATED IN A CLOTHES
 CLOSET. THIS IS ONLY A NOTE:
  
 50)NOTE: PLEASE SEE 2002 210.8B3 FOR
 KITCHENS IN OTHER THAN DWELLING UNITS.
 THIS WOULD BE FOR "HOUSE KITCHEN".
  
 51)NOTE: PLEASE SEE SOME UNITS WHICH DO
 NOT SHOW DEVICES, MENTIONS TO SEE OTHER
 SIMILAR UNITS, HOWEVER PLEASE SSE SOME
 ARE MSSING OR DO NOT CORRELATE.
 PLEASE SEE "B" UNIT, 3.23, "D-1"AND
 "D" UNIT ON 3.25.
  
 52)NOTE: PLEASE SEE FIRE COMMAND ROOM
 LAYOUT DO NOT NOT CORRLETATE FOR LAYOUT
 AND EQUIPMENT IN ROOMS AS NOTED.
 8.05,4.01
  
 53)NOTE: PLEASE SEE RISER AND PLANS DO
 NOT INDICATE ANY INFORMATION FOR
 DISC/BRKRS/OCP LOCATED ON GENERATOR FOR
 FEED/FEEDS TO GUTTER AND ON TO
 DISCONNECTS LOCATE DIN GEN RM.
 215.5 COMPLIANCE CAN NOT BE VERIFIED AT
 THIS TIME.
  
 54)NOTE: PLEASE SEE GROUND FUALT
 PROTECTION FOR SHN CAN NOT BE VERIFIED.
 CAN NOT LOCATE ON PLANS, RISER OR PANEL
 DETAIL/SCHEDULE.
 PLEASE SEE 240, GROUND-FAULT PROTECTION
 OF EQUIPMENT SHALL BE PROVIDED IN
 ACCORDANCE WITH THE PROVISIONS OF 230.95
 FOR SOLIDLY GROUNDED WYE ELECTRICAL
 SYSTEMS OF MORE THAN 150 VOLTS TO GROUND
 BUT NOT EXCEEDING 600 VOLTS
 PHASE-TO-PHASE FOR EACH INDIVIDUAL
 DEVICE USED AS A BUILDING OR STRUCTURE
 MAIN DISCONNECTING MEANS RATED 1000
 AMPERES OR MORE.
  
 55)NOTE: PLEASE SEE K-27 MENTIONS TO SEE
 TRANSFORMER GROUNDING DETAIL, HOWEVER
 THIS COULD NOT BE LCOATED ON PLANS.?
 PLEASE SHOW EITHER A TYPICAL DETAIL OR
 SHOW EACH. 250.30,215.5
  
 56)NOTE:PLEASE SEE KEYNOTE K-31,
 MENTIONS PER NAMEPLATE, HOWEVER
 DISCONNETC SIZES ETC, ARE REQUIRED AT
 THIS TIME A S MIN. 215.5
 PLEASE ALSO SEE K-NOTE FOR ELEVATOR
 CONTROLLER.
  
 57)NOTE: PLEASE SEE GUTTER SHOWN AT
 GENERATOR ROOM REFERENCES TO MEET 366.
 PLEASE SEE FBC 104.2.1, CODES FOR
 SPECIFIC DESIGNS ARE NOT TO BE REFERNECD
 IN WHOLE OR IN-PART. PLEASE SHOWN MIN
 GUTTER SIZE.
 PLEASE ALSO SEE NO CONDUCTORS SIZES ARE
 SHOWN, NO CONDUIT SIZES AND NO OCP
 (PREVIOUS NOTE) ARE SHOWN TO VERIFY
 COMPLIANCE. 310.16,215.5 240.4 ETC.
  
 58)NOTE: PLEASE SEE K-24, K25, NO SIZE
 FOR CONDUIT, FEEDER ETC FROM FIRE PUMP
 CONTROLLER TO FIRE PUMP. PLEASE SEE
 PLANS INDUCATE A "MAGNETIC TYPE" BRKR,
 HOWEVER NO SIZE IS GIVEN?
 215.5,310.16 ETC.
 PLEASE SEE PREVIOUS NOTES.
  
 59)NOTE: PLEASE SEE "SPEC BOOK", 16465
 2.2C WHICH MENTIONS ALUM BUS-DUCT.
 PLEASE SEE PREVIOUS NOTES IN REFERENCE
 TO EQUIPMENT GROUNDING METHOD OF
 BUS-DUCT. DOES THIS BUS-DUCT CONTAIN A
 SEPARATE ALUM BUS FOR GROUNDING? OR IS
 THE EQUIPMENT GROUNDING THAT IS GOING TO
 BE USED "PART" OF THE BUS-DUCT.
 PLEASE ALSO PLACE NOTE ON PLANS FOR
 REQUIRED CURBS FOR FLOOR PENATRATIONS.
 PER 368.6BFLOOR PENETRATIONS SHALL
 COMPLY WITH (1) AND (2):
 BUSWAYS SHALL BE PERMITTED TO BE
 EXTENDED VERTICALLY THROUGH DRY FLOORS
 IF TOTALLY ENCLOSED (UNVENTILATED) WHERE
 PASSING THROUGH AND FOR A MINIMUM
 DISTANCE OF 1.8 M (6 FT) ABOVE THE FLOOR
 TO PROVIDE ADEQUATE PROTECTION FROM
 PHYSICAL DAMAGE.
 IN OTHER THAN INDUSTRIAL ESTABLISHMENTS,
 WHERE A VERTICAL RISER PENETRATES TWO OR
 MORE DRY FLOORS, A MINIMUM 100 MM (4
 IN.) HIGH CURB SHALL BE INSTALLED AROUND
 ALL FLOOR OPENINGS FOR RISER BUSWAYS TO
 PREVENT LIQUIDS FROM ENTERING THE
 OPENING. THE CURB SHALL BE INSTALLED
 WITHIN 300 MM (12 IN.) OF THE FLOOR
 OPENING. ELECTRICAL EQUIPMENT SHALL BE
 LOCATED SO THAT IT WILL NOT BE DAMAGED
 BY LIQUIDS THAT ARE RETAINED BY THE
 CURB.
  
 60)NOTE: PLEASE SEE "SPEC BOOK" 16120
 2.3A5, PLEASE SEE COLOR CODING FOR
 277/480V SHALL BE BROWN, PURPLE, YELLOW.
 215.8 LOCAL AMENDMENTS.
  
 61)NOTE: THIS IS ONLY A NOTE: PLEASE SEE
 LOAD ON HGMN SHOWN AT 197A'S WITH 200A
 BRKR FEEDING THIS.
  
 62)NOTE: PLEASE SEE PLANS INDICATE "SHN"
 FEEDING"H5MN" WITH 125A BRKR, YET H5MN
 IS ONLY 100A'S.?
 PLEASE ALSO SEE RISER , APPEARS TO SHOW
 THIS AS "H5MH"?
  
 63)NOTE: PLEASE SEE DPHRN 150A BRKR TO
 100A FEEDERS (F-19).
  
 64)NOTE: PLEASE CORRELATE LOADS SHOWN ON
 "HRHN" AND TWO OTHER LOADS SHOWN ON
 "LRHN"
 215.5
  
 65)NOTE: PLEASE CORRELATE F-7, F-9 TO
 DPHE ON PANEL AND RISER.
 PLEASE SEE NO FEEDER SHOWN K? FOR HGMN
 ON RISER.
  
 66)NOTE: PLEASE CORRELATE "P-4" METER
 CENTER LOAD ANALYSIS AND NOT SHOWN ON
 ANY "SWITCH BOARD"?
 PLEASE ALSO SEE 2-W NEEDS TO CORRELATE
 WITH "SMCW". PLEASE ALSO SEE "MW" NOT
 SHOWN??
 215.5
  
 67)NOTE: PLEASE SEE "FUEL NOTE" MENTIONS
 277 GALS OF FUEL PER HR??? RUNNING A MIN
 OF 2.? HRS.
 PLEASE CLARIFY THIS NOTE: PLEASE SEE
 SIZING, CONSUMPTION OF GEN ETC CAN NOT
 BE VERIFIED. PLEASE SEE PREVIOUS NOTES
 PERTAINNG TO INFORMATION REQUIRED FOR
 GENERATOR ETC.
  
 68)NOTE: PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW SERVICE EQUIPMENT BEING INSTALL-
 ED. MAINS/BRKRS AND PANELS ARE ALL TO BE
 RATED FOR THE AVAILABLE FAULT CURRENT.
 PER 110.9/215.5
 AIC RATINGS SHOULD BE NOTED ON ALL
 EQUIPMENT.
  
 69)NOTE: PLEASE SEE ALL INFORMATION FOR
 AS SHOWN ON PLANS FOR LIGHTNING
 PROTECTION SYSTEMCAN BE INCLUDED UNDER
 BASE BLDG'S ELECTRICAL PERMIT. HOWEVER
 ANY CHANGES IN SYSTEM WOULD NEED
 REVISION. THIS SYSTEM WILL BE THE
 RESPONSIBILITY OF THE ELECTRICAL
 CONTRACTOR. IF THIS WORK IS "SUBBED'
 OUT, A SEPARATE PERMIT MUST BE PULLED BY
 LIGHTNING PROTECTION CONTRACTOR. SINCE
 THESE PLANS CONTAIN INFORMATION FOR
 SYSTEM, SUB CONTRACTOR MAY REFERENCE
 THESE PLANS AND A MIN $50 PERMIT FEE
 WILL BE DUE.
  
 70)NOTE: PLEASE ALSO SEEIF ALL
 INFORMATION FOR FIRE PUMP, FIRE PUMP
 CONTROLLER,GENERATOR, ATS, ETC IS NOT
 SUBMITTED FOR REVIEW WITH BASE BLDG
 PLANS, ALL OF THESE ITEMS WILL BE
 REQUIRED TO BE UNDER SEPARATE PERMIT
 ALONG WITH ALL FEES BASED ON VALUE OF
 ALL OF THOSE ITEMS.
 PLEASE SEE FIRE REVIEW COMMENTS.
  
 71)NOTE: PLEASE SEE MANY OF THE ABOVE
 ITEMS ARE REDLINED ON PLANS FOR AREAS OF
 NOTES. NOT "ALL" ITEMS ARE REDLINED.
  
 72)NOTE: PLEASE REMOVE ALL OLD/VOIDED
 SHEETS FROM SETS AND ONLY INSERT NEW
 REVISED SHEETS INTO COMPLETE SETS FOR
 REVIEW AND STAMPING.
 PLEASE SEE "ONE" SET OF ALL OLD/VOIDED
 REMOVED SHEETS SHOULD BE SUBMITTED FOR
 REFERENCE ONLY.
  
 73)NOTE: PLEASE KNOW, AS NOTED IN SOME
 NOTES, DUE TO SOME INFORMATION MISSING
 ON PLANS AND WITH PLANS, A COMPLETE
 REVIEW FOR CODE COMPLIANCE CAN NOT BE
 DONE AT THIS TIME.
 PLEASE BE SURE TO INCLUDE ALL
 INFORMATION AS REQUESTED/NEEDED.
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 DPALMER @WPB.ORG


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved