Date Text
2007-03-10 13:03:55** UNSAT**
  
 1) NOTE: PLEASE SEE THE SITE LIGHTING SHEET WITH
 LIGHTING WHICH IS CONTAINED IN THE *RIGHT OF WAY* SHALL
 BE UNDER A SEPARATE PERMIT AND CAN NOT BE INCLUDED IN
 THE BASE BUILDING PLANS. THIS WILL GO THROUGH
 ENGINEERING, BUILDING AND ELECTRICAL REVIEW ONCE
 SUBMITTED.
 * THIS SHEET WAS NOT STAMPED IN SETS AND VOIDED.
  
 2) NOTE: PLEASE SEE NFPA-20, 1999 OR 2003. PLEASE KNOW
 THE AMOUNT OF FUEL FOR THE FIRE PUMP SHALL BE REVISED
 FOR THE ON-SITE POWER OF THE GENERATOR TO INDICATE THE
 MINIMUM FUEL AS STATED. PLEASE KNOW THAT THE ACTUAL
 LOAD ON THE GENERATOR WITH ALL ASSOCIATED OTHER LOADS
 SHALL BE CONSIDERED THE BASIS FOR THE FUEL CONSUMPTION
 PER HOUR. THE PLANS INDICATE 92.1 GALS PER HOUR AT THIS
 TIME.
 9.6.2.2 THE FUEL SUPPLY CAPACITY SHALL BE SUFFICIENT TO
 PROVIDE 8 HOURS OF FIRE PUMP OPERATION AT 100 PERCENT
 OF THE RATED PUMP CAPACITY IN ADDITION TO THE SUPPLY
 REQUIRED FOR OTHER DEMANDS.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved