Date |
Text |
2005-05-31 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 FUEL GAS |
| FBC-2001 CHAPTER 1 |
| |
| A. FROM PREVIOUS REVIEW: |
| 1. GREASE TRAPS ARE REQUIRED TO HAVE |
| UTILITY DEPT. APPROVAL. PLEASE CONTACT |
| RODNEY COMPO AT (561) 837-4074. ALSO BY |
| E-MAIL [email protected]. - PLEASE SUBMIT |
| DETERMINATION SHEET FROM MR. COMPO. |
| GAS: |
| 6. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2001 FUEL GAS CODE SEC 402.2 |
| **************NEW COMMENTS************** |
| 1B. SHT A-1.1 EQUIPMENT SCHEDULE, ITEM |
| 21 SHOWS INDIRECT WASTE, BUT ITEM 21 WAS |
| NOT SHOWN ON THE EQUIPMENT PLAN. PLSEAS |
| CLARIFY. SECTION 104.2.1. |
| ITEM 22 WHERE DOES SHOWS A 3/4" DRAIN ON |
| THE EQUIPMENT SCHEDULE, BUT THERE IS NO |
| INDICATION OF THIS ON THE EQUIPMENT PLAN |
| NOR ON THE RISER DIAGRAM. PLEASE |
| CLARIFY. SECTION 104.2.1. |
| 2B. SHT A-3 CAN WASH DWV NOT SHOWN ON |
| THE PLUMBING PLAN AND NO VENT SHOWN ON |
| SANT. RISER. SECTIONS 901.2.1 & 104.2.1. |
| 3B. ARCHITECT AND ENGINEER SHALL AFFIX |
| THEIR SEAL, SIGN AND DATE ALL SHEETS |
| PREPARED BY THEM. SECTION 104.2.2. SEE |
| SHEETS NOT SIGNED, SEALED, & DATED. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 653-2692 |
| E-MAIL [email protected] |
| |