Plan Review Notes For Permit 04111262 |
Permit Number |
04111262 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2004-12-23 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 1 | | | | 1) SHT D1 SANITARY RISER DIAGRAM. THIS | | IS A SOVENT SYSTEM AND AS SUCH IS AN | | ENGINEERED SYSTEM. THE STACK THAT THE | | NEW BATHROOM IS BEING TIED INTO SHALL BE | | SHOWN AS EXISTING. SHOW WHERE THE NEW | | BATHROOM IS CONNECTED TO THE SOVENT | | STACK. INDICATE THE DEVELOPED LENGTH OF | | THE PIPING FROM THE STACK TO THE | | FIXTURES. SHOW THE AERATOR AND IF THERE | | IS AN OFFSET THE DEAERATOR REQUIRED FOR | | THIS ADDED BATHROOM. SECTION 104.2.1 | | 2) SUBMIT A WATER RISER DIAGRAM SHOW THE | | CONNECTION TO THE EXISTING WATER IN THE | | UNIT AND ALL PIPE SIZES, WATER HAMMER | | ARRESTORS ECT. SECTION 104.3.1.1. | | | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|