2005-03-02 00:00:00 | ***** UNSAT ***** |
| |
| 1)NOTE: PLEASE SEE BLDG/FIRE AND |
| MECHANICAL REVIEW NOTES FOR "ATRIUM". |
| IT IS MY UNDER STANDING A VARIANCE IS TO |
| BE APPLIED FOR WHICH MAY OR MAY NOT |
| AFFECT ELECTRICAL PLANS. |
| |
| 2)NOTE: PLEASE SEE A DETAILED LETTER(?) |
| WILL BE REQUIRED FOR PHASE II AND SHUT |
| DOWN OF ELECTRICALEQUIPMENT BEFORE |
| PULLING IN CONDUCTORS ETC. |
| |
| 3)NOTE: PLEASE SEE RESPONSE LTR |
| MENTIONS; "THE LIGHTNING PROTECTION |
| SYSTEM UNDER THE ELECTRICAL CONTRACTOR'S |
| PERMIT (OR) A SEPARATE SUBCONTRACTOR |
| PERMIT". PLEASE SEE SINCE LIGHTNING |
| PROTECTION SYSTEM HAS BEEN REMOVED FROM |
| PLANS. THIS WILL BE REQUIRED TO BE UNDER |
| SEPARATE PERMIT AND MAY NOT BE UNDER |
| ELECTRICAL CONTRACTORS BASEBUILDING |
| ELECTRICAL PERMIT. |
| |
| 4)NOTE: PLEASE SEE RESPONSE LTR TO NOTE |
| #4 FROM PREVIOUS REVIEW WHICH MENTIONS; |
| A)L2B3: "THIS PANEL IS A SPARE PANEL FOR |
| FUTURE LOADS". |
| PLEASE CLARIFY, PANEL SCHEDULE FOR L2B3 |
| CONTAINS NUMEROUS CIRCUITS AND LOADS?? |
| |
| 5)NOTE: PLEASE SEE NOTE #4 FROM PREVIOUS |
| |
| REVIEW; RESPONSE LTR PART; |
| H) L1A2: RISER TO BE CHANGED TO 125A, |
| FEEDER SIZE WILL BE CHANGED |
| ACCORDINGLY". |
| PLEASE SEE PANEL ON RISER NOW MENTIONS |
| 150A MLO, AND PANEL INDICATES 150A MCB. |
| PLEASE SEE INCREASE FROM LTR NOTING 125A |
| WHICH IS FINE, HOWEVER RISER INDICATES |
| MLO, WHEN MCB IS REQUIRED FOR SECONDARY |
| SIDE OF TRANSFORMER. |
| THIS SEEMS TO BE A MISPRINT? |
| |
| 6)NOTE: PLEASE SEE EH2 IS A 200MCB FED |
| FROM MSB WITH A 200A BRKR. THIS IS OK, |
| HOWEVER FEED FROM GENERATOR INDICATES A |
| 400A BRKR FEEDING 400A ATS AND THEN TO |
| 200A RATED PANEL/BRKR. |
| PLEASE VERIFY THIS. |
| PLEASE ALSO VERIFY CONDUCTORS/CONDUITS |
| FROM GENERATOR TO NEW DISC'S, DISC'S |
| BACK TO ATS AND ATS TO PANELS EH2. |
| PLEASE VERIFY IF A TAP RULE IS OF SOME |
| SORT IS BEING APPLIED. |
| PLEASE ALSO SEE POSSIBLE VOLTAGE DROP. |
| |
| 7)NOTE: PLEASE SEE MANUFACTURE CUT/SPECS |
| SHEETS STILL REQUIRED FOR FIRE PUMP/ |
| FIRE PUMP CONTROLLER, ATS, GNERATOR AND |
| SUB BASE FUEL FOR LIQUID TYPE FUELS. |
| SPECS BOOKS DO NOT SEEM TO SPECIFICALLY |
| DESIGNATE EQUIPMENT, SIZES ETC. |
| |
| |
| 8)NOTE: PLEASE SEE SPEC BOOK PAGE |
| 16075-8, MENTIONS BROWN, ORANGE, YELLOW |
| FOR 277/480V SYSTEMS. |
| PLEASE SEE "B" IS NOT A HIGH-LEG FOR |
| 277/480V. PLEASE SEE LOCAL AMENDMENTS |
| FOR BR/ PURPLE/ YELLOW.215 |
| |
| 9)NOTE: PLEASE SEE ONLY SET OF SPECS |
| BOOKS WERE SUBMITTED, PLEASE SUBMIT TWO |
| MORE SETS FOR REVIEW. |
| |
| PLEASE SEE DUE TO HAND WRITTEN NOTES |
| ADDED FOR LOCKED ROTOR FOR FIRE PUMP ETC |
| ANDCOMMENTS FOR CONDUCTORS/ CONDUITS |
| AND PANEL L1A2, PLEASE REVISE AND |
| REPRINT NEW RISER DIAGRAM SHEET. |
| |
| PLEASE SEE ANY POSSIBLE COMMENTS FROM |
| OTHER REVIEWER(S) WHICH MAY AFFECT |
| ELECTRICAL PLANS. |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE TO CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| CITY OF WEST PALM BEACH |
| CONSTUCTION SERVICES DEPT. |
| 561-805-6717 |
| [email protected] |
| |
| |
| |