2007-03-06 09:25:25 | REVISION PAGE SKP-2 |
| *** PROVISO *** |
| 1) 2001 FBC/M 1305.6 FILL PIPING. |
| A FILL PIPE SHALL TERMINATE OUTSIDE OF A BUILDING AT A |
| POINT AT LEAST 2 FEET (610 MM) FROM ANY BUILDING |
| OPENING AT THE SAME OR LOWER LEVEL. A FILL PIPE SHALL |
| TERMINATE IN A MANNER DESIGNED TO MINIMIZE SPILLING |
| WHEN THE FILLING HOSE IS DISCONNECTED. FILL OPENING |
| SHALL BE EQUIPPED WITH A TIGHT METAL COVER DESIGNED TO |
| DISCOURAGE TAMPERING. |
| 2) 2001 FBC/M 1305.7 VENT PIPING. |
| LIQUID FUEL VENT PIPES SHALL TERMINATE OUTSIDE OF |
| BUILDINGS AT A POINT NOT LESS THAN 2 FEET (610 MM) |
| MEASURED VERTICALLY OR HORIZONTALLY FROM ANY BUILDING |
| OPENING. OUTER ENDS OF VENT PIPES SHALL TERMINATE IN A |
| WEATHERPROOF VENT CAP OR FITTING OR BE PROVIDED WITH A |
| WEATHERPROOF HOOD. ALL VENT CAPS SHALL HAVE A MINIMUM |
| FREE OPEN AREA EQUAL TO THE CROSS-SECTIONAL AREA OF THE |
| VENT PIPE AND SHALL NOT EMPLOY SCREENS FINER THAN NO. 4 |
| MESH. VENT PIPES SHALL TERMINATE SUFFICIENTLY ABOVE THE |
| GROUND TO AVOID BEING OBSTRUCTED WITH SNOW OR ICE. VENT |
| PIPES FROM TANKS CONTAINING HEATERS SHALL BE EXTENDED |
| TO A LOCATION WHERE OIL VAPORS DISCHARGING FROM THE |
| VENT WILL BE READILY DIFFUSED. IF THE STATIC HEAD WITH |
| A VENT PIPE FILLED WITH OIL EXCEEDS 10 POUNDS PER |
| SQUARE INCH (PSI) (69 KPA), THE TANK SHALL BE DESIGNED |
| FOR THE MAXIMUM STATIC HEAD THAT WILL BE IMPOSED. |
| LIQUID FUEL VENT PIPES SHALL NOT BE CROSS CONNECTED |
| WITH FILL PIPES, LINES FROM BURNERS OR OVERFLOW LINES |
| FROM AUXILIARY TANKS. |
| MECHANICAL PLAN REVIEW BY; |
| TOM GORDON (561) 805-6729. |