2004-12-30 00:00:00DENIED:
 1.PLAN SHEET A1.07, INDICATES A FUME
 HOOD LOCATED IN ROOM 02.THIS IS NOT
 INDICATED ON THE MECHANICAL PLAN.
 PLEASE CLARIFY WHAT THE FUME HOOD WILL
 BE UTILIZED FOR.
  
 2.PLAN SHEET M1.01, PLAN INDICATE
 DUCT
 PENETRATING RATED WALL AT BS-3S & 3N,
 AND ALSO AT THE 2HR TEMPORARY WALL.
 PER
 2001 FBC(M)607.6, SPECIFIC LOCATIONS OF
 THE FIRE DAMPERS ARE REQUIRED.
 EXCEPTIONS FOR FIRE DAMPERS SHALL
 COMPLY
 WITH 2001 FBC(M)607.1.3 #3 ITEMS 1
 THROUGH 4.PLEASE ANNOTATE ON THE PLAN
 SHOULD THE EXCEPTION APPLY.
  
 3.PLAN SHEET M1.02, PLAN INDICATES
 DUCTS AND OR GRILLES PENETRATING OR
 TERMINATING AT RATED WALLS/PARTITIONS -
 ROOM # 19,20,21,35, 1S-2 & 1S-1.2001
 FBC(M) 607.6.
  
 4.PLAN SHEET M1.03, DUCT/GRILLE
 PENETRATIONS OR TERMINATION AT RATED
 WALLS/PARTITIONS - ROOM 11, 15, 1S-3S &
 3N.
  
 5.PLAN SHEET M1.03, CLARIFY CHASE IN
 ROOM 04, IS THIS RATED?
  
 6.PLAN SHEET M1.03, CLARIFY FRESH AIR
 INTAKE & BRANCH DUCT AT EXTERIOR WALL
 IS
 THIS A RELIEF GRILLE OR SUPPLY?
  
 7.PLAN SHEET M1.03, PLEASE IDENTIFY
 AHU IN THE MECHANICAL ROOM #15.PLEASE
 IDENTIFY ALL EQUIPMENT.
  
 8.PER 2001 FBC 414.5, ATRIUM SHALL BE
 SEPARATED FROM ADJACENT SPACES WITH A 1
 HOUR FIRE SEPARATION.THIS IS NOT
 INDICATED ON PLAN SHEETS A0.02 & A0.03.
  
 9.PLAN SHEET M7.02 INDICATES SMOKE
 EXHAUST AND CALCULATIONS FOR PHASE I.
 PLEASE CLAIRFY THE FOLLOWING:
 1) WILL THERE BE NO COMUNICATION
 BETWEEN
 THE TWO PHASES UNTIL COMPLETTION OF
 PHASE II.
 2) UPON COMPLETION OF PHASE II WILL
 THEY
 REMAIN "SEPARATED" BY WALLS & DOORS OR
 IS THE INTENT TO HAVE THE TWO
 STRUCTURES
 BE "OPEN" TO EACH OTHER.
 3) SHOULD THE INTENT BE FOR "OPEN" THE
 TWO STRUCTURES INTO ONE, THIS WILL THEN
 CHANGE THE CALCULATION FOR THE "ATRUIM"
 SMOKE EXHAUST.
  
 10.PLEASE PROVIDE ADDITIONAL
 INFORMATION ON PHASE II.IT APPEARS BY
 DEFININTION THAT IT ALSO HAS AN ATRIUM.
  
 11.PHASE II INDICATES "BASEMENT"
 SHOULD THIS SPACE ACTUALLY BE BELOW
 GRADE, SHOW COMPLIANCE WITH 2001 FBC(M)
 403.6.7.
  
 12.FAN SHUTDOWN BY DUCT SMOKE
 DETECTORS REQUIRED PER 2001
 FBC(M)606.2.1.
  
 13.NO COMBUSTIBLE ALLOWED IN THE
 RETURN AIR PLEUNUM, 2001 FBC(M)602.2.1.
  
 14.PLANS INDICATE ROOF ACCESS.WILL
 ANY MECHANICAL EQUIPMENT BE LOCATED IN
 THIS AREA?
  
 15.PROVIDE ADDITIONAL INFORMATION ON
 THE GENERATOR.INDICATE DISTANCES TO
 DOORS, WINDOWS, AND FRESH AIR INTAKES.
 PROVIDE ELEVATION FOR THE MUFFLER
 EXHAUST TERMINATION.
  
 16.INDICATE WHAT TYPE OF "FUEL" OR
 GAS
 WILL BE USED FOR THE GENERATOR.
  
 PLEASE PROVIDE A RESPONSE LETTER
 ADDRESSING COMMENTS TO HELP EXPEDITE
 FUTURE REVIEW.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561)805-6719
 OR
 E-MAIL [email protected].