Plan Review Notes For Permit 04111073
Permit Number 04111073
Review Stop E
Sequence Number 1
Notes
Date Text
2004-12-22 00:00:00*************** UNSAT *****************
  
 PALM BEACH ATLANTIC UNIVERSITY
 WARREN LIBRARY
  
 1)NOTE: PLEASE SEE 230.72 FOR GROUPING
 OF MAINS.
 PLEASE SEE LOCATION OF EHDP1. THIS WILL
 BE REQUIRED TO BE LOCATED IN CLOSE
 PROXIMITY OF MSB.
 230.72B THE ONE OR MORE ADDITIONAL
 SERVICE DISCONNECTING MEANS FOR FIRE
 PUMPS, FOR LEGALLY REQUIRED STANDBY, OR
 FOR OPTIONAL STANDBY SERVICES PERMITTED
 BY 230.2 SHALL BE INSTALLED REMOTE FROM
 THE ONE TO SIX SERVICE DISCONNECTING
 MEANS FOR NORMAL SERVICE TO MINIMIZE
 THE
 POSSIBILITY OF SIMULTANEOUS
 INTERRUPTION
 OF SUPPLY. HOWEVER, A RESPONSE FROM
 NFPA
 MENTIONS REMOTE MAY BE A CLOSE AS 10'.
 THIS WAS BROUGHT UP IN PREVIOUS
 MEETINGS
 AND DECIDED THIS LOCATION WAS TO BE
 MOVED?
  
 2)NOTE: PLEASE SEE LIGHTNING PROTECTION
 SYSTEM:IF THIS WILL BE INSTALLED
 UNDER
 MAIN ELECTRICAL CONTRACTORS PERMIT:
 PLEASE SUBMIT COMPLETE PLANS FOR THIS
 UNDER NFPA-780. IF THIS WILL BE
 INSTALLED BY ASUB-CONTRACTOR THIS MAY
 BE DONE UNDER SEPARATE PERMIT. PLEASE
 ONLY REFERENCE ON PLANS AND REMOVE
 LIGHNING AS SHOWN.
  
 3)NOTE: PLEASE SEE CONDUIT FILL FOR
 1-1/2" CONDUIT SIZE TO HDP2 ON MSB.
  
 4)NOTE: PLEASE CORRELATE PANEL
 SCHEDULES, PANELS AND EQUIPMENT SHOWN
 ON
 RISER DIAGRAM.
 PLEASE SEE THE FOLLOWING AS A SOME
 NOTED
 ON PLAN REVIEW.
  
 L2B3-NO PANEL SCHEDULE?
 EL3- NO PANEL SCHEDULE?
 L1B3- PANEL NOT INDICATED ON LEGEND ON
 E5.04, MISSING INFORMATION ON RISER,
 OCP,SIZE?
 H2B1- 225A ON RISER 400A ON PANEL
 SCHEDULE.
 EH2- NOT ON RISER?
 H1B2- 400A ON PANEL SCHEDULE, 225A ON
 RISER.
 L4A1- 250A ON RISER 225A ON PANEL
 SCHEDULE.
 L1A2- 125A ON PANEL SCHEDULE,225A ON
 RISER.
 L2B1- 250A ON RISER AND 400A ON PANEL
 SCHEDULE.
  
 5)NOTE: PLEASE SEE SIZE OF OCP FOR
 TRANSFORMER T1A1, MAX 125% 450.3
  
 6)NOTE: PLEASE SEE A MCB WILL BE
 REQUIRED FOR L3A2 ON THE LOAD SIDE OF
 THE TRANSFORMER. PLEASE SEE LOADS ARE
 NOT SPECIFIC.IN ADDITION TO THE
 REQUIREMENTS OF 408.13, A POWER
 PANELBOARD WITH SUPPLY CONDUCTORS THAT
 INCLUDE A NEUTRAL AND HAVING MORE THAN
 10 PERCENT OF ITS OVERCURRENT DEVICES
 PROTECTING BRANCH CIRCUITS RATED 30
 AMPERES OR LESS SHALL BE PROTECTED BY
 AN
 OVERCURRENT PROTECTIVE DEVICE HAVING A
 RATING NOT GREATER THAN THAT OF THE
 PANELBOARD. THE OVERCURRENT PROTECTIVE
 DEVICE SHALL BE LOCATED WITHIN OR AT
 ANY
 POINT ON THE SUPPLY SIDE OF THE
 PANELBOARD.
  
 7)NOTE: PLEASE SUBMIT COMPLETED
 INFORMATION FOR FIRE PUMP.
 PLEASE SEE 695.4B1 THE OVERCURRENT
 PROTECTIVE DEVICE(S) SHALL BE SELECTED
 OR SET TO CARRY INDEFINITELY THE SUM OF
 THE LOCKED-ROTOR CURRENT OF THE FIRE
 PUMP MOTOR(S) AND THE PRESSURE
 MAINTENANCE PUMP MOTOR(S) AND THE
 FULL-LOAD CURRENT OF THE ASSOCIATED
 FIRE
 PUMP ACCESSORY EQUIPMENT WHEN CONNECTED
 TO THIS POWER SUPPLY.
 PLEASE SEE SECONDARY OCP IS NOT
 PERMITTED AS SHOWN.695.5BTHE PRIMARY
 OVERCURRENT PROTECTIVE DEVICE(S) SHALL
 BE SELECTED OR SET TO CARRY
 INDEFINITELY
 THE SUM OF THE LOCKED-ROTOR CURRENT OF
 THE FIRE PUMP MOTOR(S) AND THE PRESSURE
 MAINTENANCE PUMP MOTOR(S) AND THE
 FULL-LOAD CURRENT OF THE ASSOCIATED
 FIRE
 PUMP ACCESSORY EQUIPMENT WHEN CONNECTED
 TO THIS POWER SUPPLY. SECONDARY
 OVERCURRENT PROTECTION SHALL NOT BE
 PERMITTED.
  
 8)NOTE: PLEASE SEE NO INFORMATION WAS
 GIVEN FOR FIRE PUMP CONTROLLER. PLEASE
 SEE RISER DOES NOT INDICATE ANY METHOD
 OF TRANSFER OF POWER FROM FPL AND
 GENERATOR FOR FIRE PUMP?
 PLEASE COMPLETE AND SUBMIT ALL
 MANUFACTURE SPECS FOR FIRE PUMP, FIRE
 PUMP CONTROLLER, ATS, GENERATOR, FUEL
 ETC.
  
 9)NOTE: PLEASE SEE SOME ELECTRICAL ROOM
 LAYOUTS DO NOT MEET 110.26 FOR CODE
 COMPLIANCE.
 PLEASE SEE PLANS AND ADJUST.
  
 10)NOTE: PLEASE SHOW GROUNDING
 ELECTRODE
 SYSTEM PER 250.50. COULD NOT LOCATE ANY
 ON ELECTRICAL PLANS SUBMITTED.
  
 11)NOTE: PLEASE SHOW GROUNDING FOR ALL
 TRANSFORMERS OR A COMMON DETAIL FOR
 TRANSFORMERS PER 250.30
  
 12)NOTE: PLEASE SEE NOTES FROM ALL
 OTHER
 REVIEWERS ON THE SCOPE OF WORK FOR
 PAHSE
 ONE AND TWO AND POSSIBLE SEPARATE
 PERMITS FOR EACH OR ALL WORK MUST BE
 COMPLETED UNDER ONE PHASE.
 PHASE ONE WILL NOTBE PERMITTED TO
 HAVE
 POWER WITH FEEDERS ETC FOR PHASE TWO
 NOT
 INSTALLED AND PULLED/SAFED OFF ETC.
 PLEASE SEE THAT A MEETING TO DICUSS THE
 PROCESS OF PHASES, COMPLETIONS, C/O'S
 ETC.
  
 13)NOTE: PLEASE SEE DUE TO COMPLETE
 INFORMATION NOT SUBMITTED AT THIS TIME
 A
 COMPLETE REVIEW FOR CODE COMPLIANCE CAN
 NOT BE DONE.
  
 PLEASE SEE POSSIBLE COMMENTS FROM OTHER
 REVIEWER(S) WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
  
  
  
 IF SYSTEM IS
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved