Date |
Text |
2005-03-09 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 CHAPTER 1 |
| FBC-2001 CHAPTER 11 |
| |
| A) FROM PREVIOUS REVIEWS, THE COMMENT |
| NUMBERS SHALL REMAIN THE SAME TO AVOID |
| CONFUSION. |
| 7) THE DETAIL FOR THE SINK STILL SHOWS |
| THE SINK DEPTH AS 7". MAXIMUM DEPTH FOR |
| THE SINK IS 6-1/2" SECTION 11-4.24.4 |
| 9) REF'S BATHROOM DETAIL DOES NOT SHOW |
| THE CONTROLS FOR THE SHOWER REQUIRED BY |
| SECTION 11-4.21.5, NOR DOES IS INDICATE |
| CURB HEIGHT PER 11-4.21.7. |
| 15) SHTS A2.2, A9.1, A9.2 SHOW THE REFS |
| BATHROOM CONFIGURED LAV, SHOWER, & W/C. |
| SHTS P1.2 (FLOOR PLAN) , P2.2 DETAIL |
| 9R/P2.2 SHOW BATHROOM CONFIGURED LAV, |
| W/C, SHOWER. PLEASE CORRELATE PLUMBING |
| PLANS WITH ARCHITECTURAL SHEET TO |
| REFLECT EACH OTHER. SECTION 104.2.1. |
| - DETAIL 9R/P2.2 SHOWS P7, P5, P11 AND |
| PLUMBING FIXTURE SCHEDULE INDICATES P5 |
| AS A URINAL. PLEASE CORRELATE FIXTURE |
| SCHEDULE AND DETAIL. SECTION 104.2.1. |
| - SHT P2.3 SHOWS P-15 (WASH MACHINE |
| BOX) BUT SHT P1.1 FLOOR PLAN SHOWS P-13 |
| (MOP SINK) PLEASE CORRELATE F.P. WITH |
| RISER DIAGRAM. SECTION 104.2.1. |
| 1B) SHT P2.3 DETAIL 2R/P2.4 AND SHT P1.1 |
| STORM PIPING, 4" ROOF DRAIN 2700 SF |
| HORIZONTAL PIPING SHALL BE 6" OR 1/2"/FT |
| SLOPE PER TABLE 1106.3. - BLDG STORM |
| DRAIN SHALL BE SLOPED 1/4"/FT THE ENTIRE |
| LENGTH PER TABLE 704.1 BECAUSE OF THE |
| 12" PIPE BEING RUN AT 1/4"/FT SLOPE. |
| PLEASE INDICATE ON PLANS. |
| - SHTS P1.2 & P2.3 STORM PIPING |
| HORIZONTAL LINE FROM 4" ROOF DRAIN 2700 |
| SF SHALL BE 6" OR RUN AT 1/2"/FT SLOPE. |
| TABLE 1106.3. |
| 3B) THE ORIGINAL SHEETS STAMPED BY THE |
| PALM BEACH COUNTY HEALTH UNIT SHALL BE |
| SUBMITTED AS PART OF THE PLANS. SUBMIT |
| AN ORIGINAL STAMPED SHEET IN EACH SET OF |
| PLANS SUBMITTED FOR REVIEW. SECTIONS |
| 104.2.1. & 101.4.7. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 653-2692 |
| E-MAIL [email protected] |
| |
| |