2005-12-07 00:00:00 | ********* UNSAT *********** |
| |
| 1)NOTE: PLEASE SEE FOUNTAIN PUMP SHOWN |
| WITH 20A OCP ON #14. |
| |
| 2)NOTE: PLEASE CORRELATE PANEL SCHEDULE |
| FOR POOL PANEL AND PANEL "B"&"A"WITH |
| RISER DIAGRAM. |
| RISER SHOWS PANEL "B" FEEDING POOL |
| PANEL, HOWEVER PANEL "A" SCHEDULE |
| INDICATES POOL PANEL COMING FROM THIS |
| LOCATION. |
| PLEASE SEE PANEL "A" SHOWS 60A OCP AND |
| #6 TO POOL PANEL. POOL PANEL ON RISER IS |
| SHOWN AS 60A OCP AND #4. |
| 215.5 |
| |
| 3)NOTE: PLEASE SEE SD IN MASTER BEDRM |
| AND OTHER LOCATIONS ARE ALL REQUIRED TO |
| BE WITHIN 12"OF THE HIGHEST |
| POINT OF A FLAT CEILING, AND WITHIN 3' |
| OF THE PEAK ON A SLOPED CEILING. |
| PLEASE KNOW, IF TRAY CEILING IS 12" OR |
| MORE ABOVE OTHER CEILING IN RM, THE SD |
| WILL BE REQUIRED TO BE LOCATED IN TRAY |
| CEILING AREA. |
| NFPA-72 11.8.3.5 |
| |
| 4)NOTE: PLEASE CORRELATE THE NUMBER OF |
| RECESSED LTS ON PLANS WITH THE # IN LOAD |
| CALCS ETC. |
| PLEASE SEE LOAD CALCS INDICATE A TOTAL |
| OF 90, HOWEVER THERE ARE MORE ON PLANS |
| PLEASE ADJUST. |
| 220.3B4 |
| |
| 5)NOTE: PLEASE SEE AHU#2 ON PANEL |
| SCHEDULE WHICH INDICATES A 10KW HEAT, |
| YET OCP IS SHOWN AT 50A'S. PLEASE SEE |
| 424.3 WHICH REUIRES A MIN 125%. |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE IN CONTACTING |
| THIS OFFICE. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |