Date |
Text |
2005-10-21 00:00:00 | ******* UNSAT ********* |
| |
| 1)NOTE: PLEASE CORRELATE ALL A/C |
| MECHANICAL EQUIPMENT. |
| PLEASE SEE PANEL SCHEDULES INDICATE FOUR |
| A/C SYSTEMS, HOWEVER PLANS DO NOT SHOW |
| FOUR COMPLETE SYSTEMS. |
| PLEASE ALSO SEE A/C #3 IS NOTED FOR |
| GARAGE, HOWEVER THIS SYSTEM IS SHOWN |
| NEXT TO MASTER BR. |
| PLEASE SEE OTHERS. |
| PLEASE SEE LOADS FOR EACH PANEL THE |
| LARGETS LOADS FOR A/C SYSTEMS ARE TO BE |
| FIGURED USUALLY THE HEAT LOAD. IF ONLY |
| THE COOLING LOAD IS INDICATED ON ONE |
| PANEL, THEN COOLING LOAD MUST BE SHOWN. |
| 220 |
| |
| 2)NOTE: PLEASE SEE BOTH PANELS "A" AND |
| "B" INDICATE BEING MLO. |
| PLEASE SEE RISER SHOWS THESE AS MCB. |
| PLEASE CORRELATE AND INDICATE MCB'S AS |
| REQIRED 230.70 |
| |
| 3)NOTE: PLEASE SEE GROUNDING ELECTRODE |
| IS NOW SHOWN GOING TO SLAB, HOWEVER THIS |
| SHOULD BE NOTED AS FOOTER STEEL. 250.50 |
| |
| 4)NOTE: PLEASE SEE LARGEST MOTOR LOADS |
| AND CONTINUOUS LOADS IN POOL PANEL NEED |
| TO BE SHOWN AT 125%. |
| 215.3,230.42 |
| |
| |
| |
| ** NOTE ALL SD'S ARE TO BE INSTALLED |
| WITH IN THE HIGHEST POINT OF A FLAT |
| CEILING. |
| PLEASE SEE THAT ALL SD'S ARE TO BE |
| INSTALLED WITHIN 3' OF A SLOPED CEILING |
| PEAK. |
| PLEASE SEE MASTER BEDRM. |
| PLEASE SEE BEDRM #4. |
| PLEASE BE SURE TO VERIFY INSTALLATION IN |
| FIELD. |
| NFPA-72 8-1 |
| |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE IN CONTACTING |
| THIS OFFICE. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |
| [email protected] |