2005-04-05 00:00:00 | ********* UNSAT *********** |
| |
| 1)NOTE: PLEASE SEE NOTES FROM PREVIOUS |
| REVIEW AND REVIEW ON 11/29/04 |
| |
| 2)NOTE: PLEASE SEE AS REQUESTED ON |
| PREVIOUS REVIEW: LETTERS FROM BOTH THE |
| ORIGINAL ARCHITECT AND ENGINEER WERE |
| REQUESTED TO RELEASE THEM FROM DESIGNERS |
| OF RECORD. THIS REQUEST WAS TO EACH HAVE |
| SIGNED, DATED, SEALED AND NOTORIZED |
| LETTERS. |
| PLEASE SEE ENGINEER'S LETTER WAS NOT |
| NOTORIZED AND ARCH'S LETTER WAS NOT |
| SEALED, DATED OR NOTORIZED. |
| |
| 3)NOTE: PLEASE SEE THE FOLLOWING EXCERPT |
| TAKEN DIRECTLY FROM NOTES ON 11/29/04 |
| FOR REDLINED PLANS. |
| |
| ***** PLANS REDLINED ****** |
| |
| 1)NOTE: PLEASE SEE GROUNDING ELECTRODE |
| CONDUCTOR STILL NOT SHOWN PER 250.66. |
| TWO SETS OF 3/0'S,,,, 1/0 MIN GEC. |
| |
| |
| 2)NOTE: PLEASE ALSO SEE AN EQUIPMENT |
| GROUNDING CONDUCTOR IS NOW ADDED FROM |
| METER TO MAIN? AN EQUIPMENT GRND IS NOT |
| INSTALLED UNTIL AFTER THE FIRST MEANS OF |
| DISCONNECT. |
| 250.6, 250.24 |
| |
| |
| ** BOTH OF THE ABOVE WERE REDLINED ON |
| PLANS. IF ANY REV'S ARE MADE TO PLANS, |
| PLEASE ALSO CORRECT THE ABOVE AT THAT |
| TIME. *** |
| |
| 4)NOTE: PLEASE SEE 700.12E FOR |
| CIRCUITING OF EM/EXT LTS. THIS WAS NOTED |
| ON ALL PREVIOUS REVIEWS AND SOME |
| CIRCUITING IS STILL NOT SHOWN AND SOME |
| NOT PER 700.12E. |
| |
| PLEASE SEE FS 553.80(2)(B) WITH RESPECT |
| TO DESIGN PROFESSIONAL. THIS IS ONLY A |
| NOTICE GIVEN AT THIS TIME. |
| |
| PLEASE MAKE THE ABOVE CORRECTIONS AND |
| SUBMIT REVISED PLANS FOR REVIEW. ONCE |
| AGAIN, IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE TO CALL TO GO |
| OVER ANY COMMENTS. |
| THIS WAS STATED ON ALL 5 PREVIOUS |
| REVIEWS. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |