2005-04-06 00:00:00 | ****CORRECTIONS**** |
| VARIOUS DETAILS PREPARED BY BIJAN |
| PARSSI, PE |
| |
| SAMANTHA HILL, BUILDING PLANS EXAMINER |
| [email protected] |
| |
| 1.)THE FORMER ARCHITECT AND ENGINEER |
| HAVE SUBMITTED LETTERS STATED THAT THEY |
| ARE NO LONGER DOR/EOR OF THE PROJECT. |
| JIM PAINE, ARCHITECT, HAS SUBMITTED NEW |
| PLANS.IS BIJAN PARSSI, PE THE NEW EOR |
| FOR THIS PROJECT?OR IS THIS DELEGATED |
| ENGINEERING?IF THIS IS DELEGATED |
| ENGINEERING, THE DETAILS ARE TO BE |
| REVIEWED BY DOR.IF HE IS THE NEW EOR, |
| SUBMIT A LETTER STATING THIS AS ALL |
| STRUCTURALS TO DATE HAVE BEEN SUBMITTED |
| BY JIM PAINE. |
| |
| 2.)THE COLUMN CONNECTION PLAN IS NOT |
| SEALED. |
| |
| 3.)AS PER CONVERSATION WITH THE |
| CONTRACTOR, THE COLUMN CONNECTION PLAN |
| IS SHOWING A C CHANNEL AND A STEEL |
| COLUMN.THE DIMENSION 4X4X4 IS |
| CONFUSING, IMPLIES A HEIGHT OF 4" RATHER |
| THAN A COLUMN THE FULL HEIGHT.THE C |
| CHANNEL IS SHOWN GRAPHICALLY BUT NOT |
| SPECIFIED, WHAT SIZE?THE ANCHORING OF |
| THE STEEL COLUMN AND C CHANNEL IS NOT |
| SPECIFIED.ANCHORING AT THE BOTTOM OF |
| THE COLUMN IS SPECIFIED, ASSUMING TO |
| EXISTING SLAB ON 1ST FLOOR AS A CONCRETE |
| ANCHOR IS SPECIFIED.IS THERE A BASE |
| PLATE FOR THE COLUMN?SPECIFY WHERE |
| THIS DETAIL IS TO BE USED. |
| |
| |