Date |
Text |
2006-06-16 00:00:00 | ******* UNSAT 2ND REVIEW OF REVSION *** |
| |
| |
| ** PLEASE SEE NOTES FROM PREVIOUS REVIEW |
| AND THIS REVIEW. |
| |
| 1) NOTE: NOTE #1 NO, PLEASE SEE NUMEROUS |
| ITEMS ARE STILL NOT CORRECT. PLEASE SEE |
| LOADS EXCEEDING BRKR OCP, BLANK SPACES |
| WITH LOADS, 50A BRKRS ON 1HP PUMPS, SEE |
| PANEL "B" NOW SHOWS 24 AND 72 A'S ON TOW |
| SEPARATE PHASES, #1'S ON RISER FOR |
| FEEDERS, #6'S ON PANEL SCHEDULE ETC ETC. |
| PLEASE SE MOST OF THESE ARE REDLINED ON |
| PLANS. |
| 215.5,240.4,240.6,310.16, ETC |
| |
| ** PREVIOUS NOTE ** |
| PLEASE CORRELATE PANEL "B" |
| LOADS, SIZE ETC. PLEASE SEE RISER SHOWS |
| THIS AS 50A MLO, YET PANEL IS SHOWN AS |
| 100A MLO. |
| PLEASE SEE LOAD ON PANEL "A" IS SHOWN AT |
| 72A'S WHICH FAR EXCEEDS THAT OF A 50A |
| BRKR. |
| 240.4,310.16,215.5 |
| |
| 2) NOTE:NOTE #2 NO, SAME NOTE AND SAME |
| AS NOTE #1. |
| PLEASE SEE WATER HEATER IS NOW REMOVED |
| FROM PANEL SCHEDULE YET LOAD IS STILL |
| BEING SHOWN IN A BLANK SPACE?? |
| PLEASE STILL INDICATE ON SCHEDULE, |
| HOWEVER IF IT IS GAS, THEN THERE IS NO |
| LOAD. |
| |
| ** PREVIOUS NOTE** |
| PLEASE CORRLEATE ALLLOADS AND |
| ITEMS ON LOAD CALCULATIONS WITH THOSE ON |
| PANEL SCHEDULES. |
| PLEASE SEE THE MICRO/OVEN IS HSOWN WITH |
| 40A LOAD ON SCHEDULE, YET CALCS ONLY |
| SHOW THIS AS 1.5KW?? |
| 215.5 |
| PLEASE SEE COOKTOP WITH A HIGH LOAD, ON |
| A 1-20A BRKR, YET CALCS SHOWS LOAD AT |
| 8KW. CORRELATE OCP, AWG AND LOADS. |
| LABEL ACCORDINGLY. |
| PLEASE SEE A GAS RANGE IS SHOWN ON LOAD |
| CALCS. |
| PLEASE SE WATER HEATER IS SHOWN AS GAS |
| ON PANEL SCHEDULE, YET LOAD ON SCHEDULE |
| DOES NOT CORRELATE WIHT THIS NOR DOES |
| THE CALCULATIONS. |
| 215.5 |
| |
| 3) NOTE: NOTE #3, NO, PLEASE SEE |
| DEN/STUDY WHICH STILL REQUIRES SOME SORT |
| OF LT FIXTURE. |
| |
| ** PREVIOUS NOTE ** |
| PLEASE SEE REDLINED LOCATIONS |
| FOR A MIN LT FIXTURE OF SOME TYPE WILL |
| BE REQUIRED FOR EGRESS. NFPA-101, 7.8, |
| NFPA-70 210.70, NFPA-101 CHAPTER 24 |
| |
| 4) NOTE: OK. |
| |
| |
| 5) NOTE:NOTE #5 NO, |
| |
| |
| **PREVIOUS NOTE ** |
| PLEASE SEE ALL LIGHTING AND |
| RECEPT CIRCUITS ON PANEL SCHEDULE SHALL |
| BE SPECIFIC TO ROOM/AREA/LOCATION AND |
| PURPOSE. |
| PLEASE KNOW, IT IS NOT ACCEPTABLE TO |
| JUST LIST ALL LIGHTING OR RECEPTS |
| WITHOUT WHICH RM ETC THEY ARE FEEDING. |
| IE; B-6 MASTER BDRM RECEPTS, FOYER LTS |
| ETC. |
| |
| 6) NOTE:OK |
| |
| NEW NOTE: |
| |
| 7) NOTE: PLEASE SEE COPY OF FS |
| 553.80(2)(B) IS ATTACHED. IF PLANS COME |
| BACK WITH ALL OF THESE ADDRESSED THE |
| ABOVE SHALL BE IMPLEMENTED. |
| PLEASE SEE THIS WILL BE THE 2ND SET |
| RETAINED. |
| |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE TO CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| CITY OF WEST PALM BEACH |
| CONSTUCTION SERVICES DEPT. |
| 561-805-6717 |
| [email protected] |